Laserfiche WebLink
CERTIFICATE OF COMPLIANCE - LOWRISE MULTIFAMILY MIXED USE PERFORMANCE COMPLIANCE METHOD LMCC-PRF-01-E <br />Lowrise Multifamily Mixed Use Performance Compliance Method (Page 2 of 48) <br />Registration Number:Registration Date/Time:   HERS Provider: <br />CA Building Energy Efficiency Standards <br />2022 Lowrise Multifamily Compliance <br />Report Version: 2022.0.000 <br />Schema Version: rev 20220601 <br />Report Generated: 2024-06-21 10:09:20 <br />Compliance ID: <br />EnergyPro-30082-0624-0004 <br />B. PROJECT SUMMARY <br />Table B shows which building components are included in the performance calculation. If indicated as not included, the project must show compliance prescriptively if within the <br />permit application. <br />Building Components Complying via Performance Building Components Complying Prescriptively <br />Envelope (See Table G) <br />Nonres Not Included Solar Thermal Water <br />Heating (See Table I3) <br />Performance The following building components are ONLY eligible for prescriptive compliance <br />and should be documented on the LMCC form listed if within the scope of the <br />permit application (i.e. compliance will not be shown on the LMCC-PRF-E).MultiFam Performance Not Included <br />Mechanical (See Table H) <br />Nonres Not Included Covered Process: <br />Commercial Kitchens (see <br />Table J) <br />Performance Indoor Lighting (Unconditioned) 140.6 & <br />170.2(e) <br />LMCC-LTI-01E is <br />required <br />MultiFam Performance Not Included Outdoor Lighting 140.7 & 170.2(e)LMCC-LTO-01E is <br />required <br />Domestic Hot Water (See <br />Table I) <br />Nonres Not Included Covered Process: <br />Laboratory Exhaust (see <br />Table J) <br />Performance Sign Lighting 140.8 & 170.2(e)LMCC-LTS-01E is <br />required <br />MultiFam Performance Not Included Building Components Complying with Mandatory Measures <br />Lighting (Indoor Conditioned, <br />see Table K) <br />Nonres Not Included <br />Photovoltaics (see Table <br />F) <br />Performance <br />Electrical power systems, commissioning, solar ready, elevator and <br />escalator requirements are mandatory and should be documented <br />on the LMCC form listed if applicable (i.e. compliance will not be <br />shown on the LMCC-PRF-E.) <br />MultiFam Performance Not Included Electrical Power Distribution 110.11 LMCC-ELC-01E is <br />required <br />Battery (see Table F) <br />Performance Commissioning 120.8 LMCC-CXR-01E is <br />required <br />Not Included Solar and Battery 110.10 LMCC-SAB-01E is <br />required <br />424-F010311382A-000-000-0000000-0000 12/11/2024 14:51 CHEERS <br />NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, <br />and cannot guarantee, the accuracy or completeness of the information contained in this document.