Laserfiche WebLink
Central Pointe Phase 1 #44-Garage Vehicular Barrier Cable Shop Drawings <br />Ball in court Sent Due Returned Response/Action Attachments <br />Submitted <br />Jake Etchebarren <br />(Guy Yocom <br />Construction, Inc) <br />Submitted by Ben Tran <br />Nov 25, 2025 Nov 25, 2025 Nov 25, 2025 Submitted <br />Submittal #21 - Barrier <br />Cable Shop <br />Drawings.pdf <br />Comments - <br />Sent for review <br />Ben Tran <br />(Westport Construction, <br />Inc.) <br />Sent by Ben Tran <br />Nov 25, 2025 --Sent for review <br />Submittal #21 - Barrier <br />Cable Shop <br />Drawings.pdf <br />Comments - <br />Review Step 1 <br />ca ca <br />(VCA Structural)Nov 25, 2025 Dec 9, 2025 - <br />Comments <br />Created by ca ca with Autodesk® Construction Cloud™ on Nov 25, 2025 at 4:46 PM PST Page 3 of 3 <br /> VCA STRUCTURAL, INC. <br />REVIEWED <br />REVISE AND RESUBMIT <br />This review is only for general conformance with the design <br />concept of the project structural plans. The fabrication <br />processes, techniques of construction, dimensions, and <br />quantities are not a part of this review. Our review of these <br />drawings does not relieve the contractor from complying with <br />the structural plans. <br />MAKE CORRECTIONS AS NOTED <br />REJECTED <br />12/01/2025 <br />x