My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
26 Civic Center Plz - REV 6 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Civic Center Plz
>
26 Civic Center Plz
>
26 Civic Center Plz - REV 6 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2026 1:27:25 PM
Creation date
2/25/2026 1:26:58 PM
Metadata
Fields
Template:
Plan
Permit Number
20181364
20184057
30146548
40138556
40139543
101117272
101117273
101117274
101117275
101117276
101117286
101120941
101121751
Full Address
26 Civic Center Plz
Street Number
26
Street Name
Civic Center
Street Suffix
Plz
Text box
ID:
1
Creator:
COSA-PRIVATE\WRIDHUAN
Created:
2/25/2026 1:27 PM
Modified:
2/24/2026 1:23 PM
Text:
Revision to 101117272, 20181364, 30146548, 40138556 (iss. on 8/19/2024) REV 6 #'s 101125569, 20187284, 30149508, 40140914 APPROVALS: PLNG - P. Gomez BLDG/ELECT/PLUMB/MECH- CSG
Stamp
ID:
1
Creator:
COSA-PRIVATE\WRIDHUAN
Created:
2/25/2026 1:27 PM
Modified:
2/24/2026 1:23 PM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ST <br />09-30-2027 <br />OARCHITECT <br />FOF CA LE <br />REN. <br />AT ARNNO.SELIC NE <br />C-27893D TECHIT <br />ARC <br />DAVID SCHNEE <br />I <br />U <br />E <br />I <br />H <br />U <br />9 <br />AS.O <br />A <br />F R A N CN <br />4 0 8 0 <br />H <br />I <br />N <br />S <br />L11 <br />AL <br />E <br />CR <br />N D E N VA <br />,N I N G <br />CRAE <br />TCEIT <br />S C <br />S <br />N <br />N <br />G R O U P <br />7 <br />S <br />5 06 <br />C <br />0718 <br />2 <br />P <br />R <br />A <br />O <br />90 <br />A <br />EU <br />C <br />+ <br />ER <br />4 <br />SHEET TITLE AND NO. <br />ISSUE DATE <br />PROJECT: <br />CA REG. <br />Project Arch.---- <br />---- <br />PERMIT SET 1ST ISSUANCE <br />BID SET <br />FINAL PERMIT/CONFORM SET <br />09/29/2023 <br />04/30/2024 <br />08/02/2024 <br />22575-01 <br />26 CIVIC CENTER <br />PLAZA <br />SANTA ANA <br />CA 92701 <br />SANTA ANA <br />LIBRARY <br />RENOVATION <br />CITY OF SANTA ANA <br />26 CIVIC CENTER PLAZA <br />SANTA ANA, CA 92701 <br />REV # DESCRIPTION DATE <br />1 BACKCHECK REV-1 03.01.2024 <br />2 CITY REVIEW REV-1 08.02.2024 <br />3 CITY REVIEW REV-2 10.18.2024 <br />4 CITY REVIEW REV-3 01.27.2025 <br />5 CITY REVIEW REV-4 04.07.2025 <br />6 CITY REVIEW REV-5 06.27.2025 <br />7 CITY REVIEW REV-6 10.24.2025 <br /> <br />REVIEWED FOR CONSTRUCTABILITY: <br /> 80470 <br />SEAN THOMAS. P.E. RCE NO: <br />PRINCIPAL CIVIL ENGINEER <br />DATE: <br />RECOMMENDED FOR CONSTRUCTION: <br /> 62968 <br />JASON GABRIEL. P.E. RCE NO: <br />PRINCIPAL CIVIL ENGINEER <br />DATE: <br />A0.0 <br />COVER SHEET <br />SANTA ANA LIBRARY RENOVATION <br />PROJECT NUMBER: 22-1380 <br />26 CIVIC CENTER PLAZA, CITY OF SANTA ANA, 92701 <br />PERMIT/ CONFORM SET <br />AUGUST 02, 2024 <br />PROJECT TEAM <br />ARCHITECT:CIVIL:LANDSCAPE: <br />STRUCTURAL: <br />GROUP 4 ARCHITECTURE RESEARCH + <br />PLANNING: <br />211 LINDEN AVENUE <br />SOUTH SAN FRANCISCO, CA 94080 <br />T: (650) 871-0709 <br />CONTACT: DAVID SCHNEE <br />KPFF <br />140 NEWPORT CENTER DRIVE <br />SUITE 100 <br />NEWPORT BEACH, CA 92660 <br />T: (949) 478-8805 <br />CONTACT: GRANT KAI <br />TERRAIN INTEGRATION <br />143 S.OLIVE STREET <br />ORANGE, CA 92866 <br />T: (714) 724-9814 <br />CONTACT: STEPHANIE SHERMOEN <br />KPFF <br />18400 KARMAN AVE <br />SUITE 600 <br />IRVINE, CA 92612 <br />T: (949) 252-1022 <br />CONTACT: BILL THORPE <br />MEP:HISTORIC ARCHTECT: <br />ACOUSTICS & TELECOM: <br />MEP CALIFORNIA ENGINEERING CORP. <br />1929 MAIN STREET <br />SUITE 980 <br />IRVINE,CA 92614 <br />T: (949) 516-6487 <br />CONTACT: TOM PRESTON <br />PAGE & TURNBULL <br />523 WEST 6TH STREET <br />SUITE 1013 <br />LOS ANGELES, CA 90014 <br />T: (213) 221-1203 <br />CONTACT:JOHN LESAK <br />SMITH FAUSE & MCDONALD <br />351 8TH STREET <br />SAN FRANCISCO, CA 94103 <br />T: (415) 255 9140 <br />CONTACT: PETER A. MCDONALD <br />PROJECT SCOPE OF WORK: <br />THE PROPOSED PROJECT IS A LIBRARY RENOVATION <br />OF BASEMENT, 1ST AND 2ND FLOORS WITH <br />EXTERIOR WORK. <br /> <br />THE SCOPE OF WORK INCLUDES ASSOCIATED SITE <br />WORK FOR SURFACE PARKING, PATHWAYS AND <br />LANDSCAPEING, ADDITION OF ACCESSIBLE <br />ELEVATOR; REPAIR AND REPLACEMENT OF NORTH <br />FACING WINDOWS; REPAIR OF MARBLE FACADE; <br />RENOVATION OF INTERIOR SPACES. <br />LOCATION MAP: <br />SANTA ANA LIBRARY <br />DEFERRED SUBMITTALS: <br />1. AUTOMATIC FIRE SPRINKLERS-PLANS AND <br />CALCULATIONS <br />2. FIRE ALARM SYSTEM <br />3. WORK OF DIVISION27: TELECOMINICATIONS <br />INCLUDING. <br />a.SUPPORT AND SEISMIC RESTRAINT <br />b.EQUIPMENT ANCHORAGE <br />SEPARATE PERMIT BEFORE <br />START OF WORK: <br />SHORING - The Sub-Contractor shall obtain a separate <br />permit before start of work. <br />ALTERNATE 1: BASEMENT LIGHTWELL AND <br />SKYLIGHTS: AT THE BASEMENT LEVEL, EXCAVATE <br />FOR THREE LIGHTWELLS WITH CONCRETE WALLS <br />AND SKYLIGHTS. SEE PLANS AND DETAILS. <br />ALTERNATE 2: SOUTH TRELLIS: AT THE SOUTH <br />PLAZA, PROVIDE FOOTINGS AND STEEL TRELLIS <br />STRUCTURE WITH LETTERS (SIGNAGE). SEE SHEETS <br />A2.5-10, S2.4-2, S4.2-2 <br />ALTERNATE 3: RELOCATE 3 PALM TREES. PROTECT, <br />REMOVE, STORE AND MAINTAIN, REPLANT. <br />GENERAL NOTES <br />1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE <br />"STANDARD SPECIFICATIONS FOR PUBLIC WORKS <br />CONSTRUCTION" AS WRITTEN AND PROMULGATED BY THE <br />2018 EDITION OF SOUTHERN CALIFORNIA CHAPTER OF THE <br />A.P.W.A. <br />A.G.C.C. JOINT COOPERATIVE COMMITTEE HEREIN REFERRED <br />TO AS THE STANDARD SPECIFICATIONS AND THE CITY <br />OF SANTA ANA STANDARD PLANS & SPECIFICATIONS (UNLESS <br />SPECIFICALLY NOTED OTHERWISE OR IN THE SPECIAL <br />PROVISIONS FOR THIS PROJECT). <br />2. THE EXISTENCE AND LOCATION OF ANY UNDERGROUND <br />UTILITY OR STRUCTURE SHOWN ON THESE PLANS ARE <br />OBTAINED BY A SEARCH OF AVAILABLE RECORDS. NO <br />CERTIFICATION IS MADE AS TO ACCURACY OR <br />THOROUGHNESS OF THESE RECORDS. <br />APPROVAL OF THIS PLAN BY THE CITY OF SANTA ANA DOES <br />NOT CONSTITUTE AN EXISTENCE OR NONEXISTENCE OF ANY <br />UNDERGROUND UTILITY OR SUBSTRUCTURE WITHIN THE <br />LIMITS OF THIS PROJECT. IT SHALL BE THE RESPONSIBILITY OF <br />THE CONTRACTOR TO VERIFY THE LOCATION OF ALL EXISTING <br />UNDERGROUND UTILITIES (BY POTHOLING OR OTHER MEANS). <br />THE CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE <br />ALERT (811) 48 HOURS BEFORE ANY EXCAVATION. <br />FA-07102 <br />APPROVALS: <br />NABIL SABA, PE, EXECUTIVE DIRECTOR DATE <br />PUBLIC WORKS AGENCY <br />RUDY ROSAS, CITY ENGINEER DATE <br />BRIAN STERNBERG DATE <br />LIBRARY SERVICES DIRECTOR <br />PREPARED UNDER THE SUPERVISION OF: <br />DAVID SCHNEE, LICENSE C-27893 DATE <br />2024-04-30 <br />ALL STAMPS AND SIGNATURES ARE DIGITAL FOR ALL SHEETS
The URL can be used to link to this page
Your browser does not support the video tag.