Laserfiche WebLink
City of Santa Ana Public Library Renovation <br />Group 4 Architecture Research + Planning, Inc. Allegion <br />Group 4 Project No. 22575-01 October 16, 2025 <br /> <br /> <br />DOOR HARDWARE 087100-23 <br />GROUP NO. 39 <br /> <br />3 EA HINGE 5BB1 4.5 X 4.5 652 IVE <br />1 EA STOREROOM LOCK SET CLX3357 PZD CT6R 626 C-R <br />1 EA PERMANENT CORE CR8000 626 C-R <br />1 EA OH STOP 100S 630 GLY <br />GROUP NO. G01 <br /> <br />1 EA PANIC HARDWARE OUT-AX-98-L-17-WH 626 VON <br />1 EA RIM CYLINDER CR3080 CT6R 626 C-R <br /> BALANCE OF HARDWARE <br />EXISTING TO REMAIN <br /> <br />GROUP NO. H01 <br /> <br />1 EA ELECTRIC HINGE 5BB1 TW8 - SIZE AND THICKNESS <br />TO MATCH EXISTING <br />630 IVE <br />1 EA ELEC TRIM M996-L-RV-17-FSE 626 VON <br />1 EA SWITCH SWITCH KIT-RX VON <br /> CARD READER - WORK OF <br />DIVISION 28 <br /> <br /> POWER SUPPLY - WORK OF <br />DIVISION 28 <br /> <br /> BALANCE OF HARDWARE <br />EXISTING TO REMAIN <br /> <br />