My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
26 Civic Center Plz - REV 6 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Civic Center Plz
>
26 Civic Center Plz
>
26 Civic Center Plz - REV 6 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2026 1:27:25 PM
Creation date
2/25/2026 1:26:58 PM
Metadata
Fields
Template:
Plan
Permit Number
20181364
20184057
30146548
40138556
40139543
101117272
101117273
101117274
101117275
101117276
101117286
101120941
101121751
Full Address
26 Civic Center Plz
Street Number
26
Street Name
Civic Center
Street Suffix
Plz
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Santa Ana Public Library Renovation <br />Smith, Fause & McDonald Inc.Group 4 Architecture Research + Planning, Inc. <br />Conform SetASI #026 – August 72, 20254 Group 4 Project No. 22575-01 <br />SECTION 27 4116-16 INTEGRATED AUDIOVISUAL SYSTEMS AND EQUIPMENT <br />2.5 ROOM SCHEDULING SYSTEM <br />A.General: Provide hardware Room Scheduling Panels, frames/mounts, cabling, raceways, and <br />programming at Room Scheduling Panel locations shown on plans. Confirm compatibility of <br />submitted hardware panel with City/Library scheduling software. <br />B.Drawing Reference: RSP <br />1.Features/Requirements: <br />2.Compatible with Library/City Scheduling Software <br />3.Manufacturer: <br />a.Crestron TSW-770 <br />b.Or equal <br />2.6 CONTROL SYSTEM, SWITCHING AND RELATED <br />A.General <br />1.Products provide under this Section shall be made by manufacturers regularly <br />engaged in the production of programmable commercial audio-visual control <br />systems. Such manufacturers shall have at least 5 years prior production experience <br />in the manufacture of such goods. <br />2.Provide control system to perform functions scheduled on drawings and herein. <br />a.System to be field programmable. <br />b.Provide programming allowance to implement system as required to provide <br />the functionality indicated herein and as defined by the City during design <br />and construction phase meetings, including closely matching the user <br />interface of the existing control panels used elsewhere at the City in style, <br />color and organization to the extent directed by the City’s Representative. <br />3.In addition to providing programming to meet the requirements outlined in part one of <br />this specification section and as outlined by the City during the reconstruction <br />programming meetings, Contractor to provide an allowance of up to $6000 to <br />implement new functions in the audiovisual systems programming identified by the <br />City after the substantial completion of this project. Allowance may not be expended <br />by the Contractor in completing the base bid scope of work including Warranty defect <br />items. <br />B.Control Processor <br />1.Drawing References: CONTROL <br />a.Control4 <br />b.CBlock <br />c.Control PS - A/V Net power supply <br />2.Features/Functions/Performance: <br />a.Control System shall utilize a processor at no less that of sufficient capacity <br />to provide the indicated control functions without degradation due to system <br />overload. <br />b.I/O Ports: <br />1)At least 3 RS-232/422/485 Ports. <br />2)At least 8 IR/Serial Ports. <br />3)At least 8 Isolated Relay Ports <br />4)At least 8 I/O Ports. <br />5)At least 1 Port for the control system manufacturer's proprietary A/V <br />network. <br />6)At least 1 TCP/IP Ethernet Network connection via an RJ-45 <br />connector. <br />c.Control System shall be fully compatible with the control system <br />manufacturer's projector and A/V equipment status monitoring and
The URL can be used to link to this page
Your browser does not support the video tag.