Laserfiche WebLink
12 <br />345678910 <br />C <br />D <br />E <br />F <br />G <br />H <br />STAFF <br />OFFICE <br />001 <br />ARCHIVES <br />002 <br />MECH-ABAN. <br />008 <br />ELEVATOR-ABAN. <br />007 <br />FIRE AL.RM <br />006 <br />MECH <br />003 <br />ALL GENDER <br />RESTROOM <br />010 <br />OFFICE <br />012 <br />OFFICE <br />013 <br />STAFF <br />MEETING <br />ROOM <br />014 <br />OFFICE <br />015 <br />ELEV. <br />CONTROL <br />018 (E) ELEV. <br />OFFICE <br />017 <br />STAFF <br />BREAK <br />ROOM <br />004 <br />(E) ELEV. <br />CONTROL <br />RM. <br />005A <br />ELECTRICAL <br />019 <br />OFFICE <br />016 <br />STORAGE <br />005 <br />ST-01ST-02 <br />ST-03 <br />5' - 7 1/2"VESTIBULE <br />005B <br />ALIGN F.O.F <br />JANITOR. <br />023 <br />ALL GENDER <br />RESTROOM <br />0115' - 9 1/4"7' - 5 1/4"2' - 5"6' - 5 3/4" <br />4' - 8 1/2"10' - 7 1/2"6' - 8 1/4"ALIGNALIGNALIGNALIGN ALIGN <br />5' - 3"7' - 2 1/4"5' - 5 1/4"17' - 8 1/2"5' - 2"12' - 8 1/2"12' - 5 1/4"12' - 8 1/2" <br />ALIGN F.O.F. <br />ALIGN <br />5' - 8"5' - 9 1/2"11' - 2 1/4"2' - 3 3/4"7' - 0 3/4"4' - 11 1/4"1' - 5 3/4"10' - 8 3/4" <br />4' - 3 1/2"7' - 8 1/2" <br />ALIGN F.O.F. <br />2' - 9 1/2"34' - 1 1/2" <br />ALIGN F.O.F.11' - 0 1/2"ALIGN F.O.F. <br />6' - 5"2' - 0"17' - 11 3/4"6' - 1 3/4"9' - 2 1/2"2' - 5 1/2" <br />ALIGN F.O.F <br />ALIGN <br />F.O.F <br />ALIGN <br />F.O.F <br />#287 <br />RFI <br />ST <br />09-30-2027 <br />OARCHITECT <br />FOF CA LE <br />REN. <br />AT ARNNO.SELIC NE <br />C-27893D TECHIT <br />ARC <br />DAVID SCHNEE <br />I <br />U <br />E <br />I <br />H <br />U <br />9 <br />AS.O <br />A <br />F R A N CN <br />4 0 8 0 <br />H <br />I <br />N <br />S <br />L11 <br />AL <br />E <br />CR <br />N D E N VA <br />,N I N G <br />CRAE <br />TCEIT <br />S C <br />S <br />N <br />N <br />G R O U P <br />7 <br />S <br />5 06 <br />C <br />0718 <br />2 <br />P <br />R <br />A <br />O <br />90 <br />A <br />EU <br />C <br />+ <br />ER <br />4 <br />SHEET TITLE AND NO. <br />SHEET NOTES <br />N <br />ISSUE DATE <br />PROJECT: <br />CA REG. <br />Project Arch.---- <br />---- <br />PERMIT SET 1ST ISSUANCE <br />BID SET <br />FINAL PERMIT/CONFORM SET <br />09/29/2023 <br />04/30/2024 <br />08/02/2024 <br />22575-01 <br />26 CIVIC CENTER <br />PLAZA <br />SANTA ANA <br />CA 92701 <br />SANTA ANA <br />LIBRARY <br />RENOVATION <br />CITY OF SANTA ANA <br />26 CIVIC CENTER PLAZA <br />SANTA ANA, CA 92701 <br />REV # DESCRIPTION DATE <br />1 BACKCHECK REV-1 03.01.2024 <br />2 CITY REVIEW REV-1 08.02.2024 <br />3 CITY REVIEW REV-2 10.18.2024 <br />4 CITY REVIEW REV-3 01.27.2025 <br />5 CITY REVIEW REV-4 04.07.2025 <br />6 CITY REVIEW REV-5 06.27.2025 <br />7 CITY REVIEW REV-6 10.24.2025 <br /> <br />REVIEWED FOR CONSTRUCTABILITY: <br /> 80470 <br />SEAN THOMAS. P.E. RCE NO: <br />PRINCIPAL CIVIL ENGINEER <br />DATE: <br />RECOMMENDED FOR CONSTRUCTION: <br /> 62968 <br />JASON GABRIEL. P.E. RCE NO: <br />PRINCIPAL CIVIL ENGINEER <br />DATE: <br />A2.4-6 <br />DIM CONTROL <br />PLAN - BASEMENT <br /> 1/8" = 1'-0"1FP00 - BASEMENT FLOOR DIM CONTROL PLAN <br />#64 <br />RFI