My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
26 Civic Center Plz - REV 6 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Civic Center Plz
>
26 Civic Center Plz
>
26 Civic Center Plz - REV 6 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2026 1:27:25 PM
Creation date
2/25/2026 1:26:58 PM
Metadata
Fields
Template:
Plan
Permit Number
20181364
20184057
30146548
40138556
40139543
101117272
101117273
101117274
101117275
101117276
101117286
101120941
101121751
Full Address
26 Civic Center Plz
Street Number
26
Street Name
Civic Center
Street Suffix
Plz
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOTES: <br />1. ALL REINFORCING MUST MEET ONE OF THE FOLLOWING CASES: <br />A. CASE I: THE CLEAR SPACING OF THE BARS BEING DEVELOPED OR SPLICED IS NOT LESS THAN ONE BAR DIAMETER(db). THE CLEAR COVER NOT <br />LESS THAN ONE BAR DIAMETER (db) (STIRRUPS AND TIES ARE LOCATED THROUGHOUT THE SPLICE LENGTH NOT LESS THAN CODE MINIMUM. <br />B. CASE II: THE CLEAR SPACING OF THE BARS BEING SPLICED IS NOT LESS THAN TWO BAR DIAMETERS (2db) AND THE CLEAR COVER IS NOT LESS <br />THAN ONE BAR DIAMETER (db). <br />2. FOR ALL OTHER CASES MULTIPLY THE VALUES SHOWN BY 1.5. <br />3. THE ABOVE VALUES ARE FOR NORMAL WEIGHT CONCRETE. <br />4. THE ABOVE VALUES ARE FOR UNCOATED REINFORCEMENT. <br />5. TOP BARS ARE HORIZONTAL REINFORCING WITH MORE THAN 12" OF NEW CONCRETE PLACED BELOW THE BAR. <br />6. BOTTOM BARS ARE ALL VERTICAL BARS AND HORIZONTAL REINFORCEMENT WITH LESS THAN 12" OF NEW CONCRETE PLACED BELOW THE BAR. <br />1.270 <br />9'-10" <br />6'-7" <br />7'-7" <br />5'-10" <br />8'-6" <br />7'-7" <br />0.375 <br />2'-4" <br />1'-5" <br />1'-7" <br />1'-10" <br />2'-0" <br />1'-10"5000TOP BAR <br />BOTTOM BAR <br />BOTTOM BAR <br />BOTTOM BAR <br />BAR SIZE GR 60 <br />4000 3000 <br />TOP BAR <br />TOP BARf'c (psi)3 <br />NORMAL WEIGHT CONCRETE TENSION LAP SPLICE LENGTH, Lst <br />3'-8"3'-0"2'-5" <br />2'-4"1'-10"2'-10" <br />0.625 <br />2'-7" <br />3'-4" <br />3'-0" <br />3'-11" <br />0.500 <br />3'-1" <br />2'-1" <br />2'-8" <br />2'-5" <br />4 <br />0.750 <br />4'-8" <br />3'-1" <br />4'-1" <br />3'-7" <br />5 6 <br />6'-9"6'-0"5'-3" <br />4'-1"4'-8"5'-3" <br />5'-3" <br />4'-6" <br />5'-11" <br />0.875 <br />6'-9" <br />1.000 <br />7'-9" <br />5'-2" <br />6'-9" <br />6'-0" <br />7 8 <br />1.128 <br />8'-9" <br />5'-10" <br />7'-7" <br />6'-9" <br />9 10 <br />8'-6" <br />6'-6" <br />1.410 <br />10'-11" <br />7'-3" <br />9'-5" <br />8'-5" <br />11 <br />BAR DIAMETER, db (IN) <br />TIES & STIRRUPS HOOKS ONLY <br />2 <br />12 <br />TYPICAL COLUMN <br />BAR OFFSET <br />135° HOOK 90° HOOK <br />90° HOOK180° HOOK <br />12 <br />2 BAR SIZE <br />STANDARD HOOKS <br />BAR SIZE <br />#3 THRU #5 <br />#6 THRU #8 <br />D' <br />#3 THRU #8 <br />#9 THRU #11 <br />#14 AND #18 <br />D <br />D' = BEND DIAMETER <br />D = BEND DIAMETER <br />6db <br />8db <br />10db <br />4db <br />6db3" MIN6db ORD'dbDUNO12dbD2 1/2" MIN <br />4db ORdb D'db12db FOR #6 THRU #86db FOR #3 THRU #5PER 1/S4.0-1LdLdhSTD 90° <br />HOOK <br />FACE OF <br />CONCRETE <br />CONDITION AT <br />STRAIGHT <br />BAR <br />CONDITION AT <br />HOOKED BAR <br />MINIMUM DEVELOPMENT LENGTH Ldh, OF STANDARD <br />HOOK FOR UNCOATED GRADE 60 REBAR (INCHES) <br />f'c (PSI)*BAR SIZE <br />NO. <br />#3 9 <br />3000 <br />8 <br />4000 <br />7 <br />5000 <br />6 <br />6000 <br />#4 11 10 9 8 <br />#5 14 12 11 10 <br />#6 17 15 13 12 <br />#7 20 17 15 14 <br />#8 22 19 17 16 <br />#9 25 22 20 18 <br />#10 28 25 22 20 <br />#11 31 27 24 22 <br />NOTE: <br />* - VALUES SHOWN ARE FOR NORMAL WEIGHT <br />CONCRETE. LENGTHS SHOWN ABOVE SHALL BE <br />MULTIPLIED BY 1.33 FOR APPLICATIONS IN <br />LIGHTWEIGHT CONCRETE. <br />STD 180° <br />HOOK <br />ELEVATION AT HORIZONTAL KEY <br />ELEVATION AT VERTICAL KEY <br />2x6 NOMINAL x 0'-6" <br />KEY @ 2'-0" OC 2x6 NOMINAL x 0'-6" <br />KEY @ 1'-0" OC <br />A SECTION <br />1 1/2"1 1/2"2 1/2"1 1/2"2'-9" <br />1'-6" <br />#4 @ 12" OC <br />6 <br />1 <br />TOP OF SLAB <br />ELEVATION <br />SEE PLAN <br />KEY PER 8" CONC WALL W/ <br />#5 @ 12" OC <br />EACH WAY <br />NOTE: <br />WALL IS TO REMAIN SHORED (7) DAYS MIN AFTER TOP SLAB HAS BEEN PLACED.PER PLANSLAB ON GRADEPER ELEV MFR5'-0" MAXEACH WAY (T&B)12" SLAB ON GRADEW/ #5 @ 12" OC4 <br />S4.0-1 <br /> 0"2'-0" LAP <br />7 <br />S4.0-1 <br />AT ELEVATOR GUIDE <br />RAIL SUPPORT <br />AT ELEVATOR <br />SILL 8 <br />S4.0-1 <br />9 <br />S4.0-1 <br />OH <br />CORNER <br />TYP3" CLRTYP <br />3" CLR VAPOR RETARDER <br />SLAB ON GRADE <br />PER PLAN <br />DOWEL TO MATCH <br />NEW SLAB REINF <br />SET IN HOLE W/ <br />ADHESIVE <br />2'-0" MIN 4"EQEQSLAB ON GRADE PER PLAN (E) SLAB ON GRADE <br /> 0"TYP 2" CLRPLANPERVAPOR RETARDER <br />8" CONC WALL PER <br />ELEVATOR GUIDERAIL <br />SUPPORT COL PER PLAN1/2"PLAN VIEW <br />3/4" THK PL W/ (1) <br />5/8"Φ x 4" EMBED <br />HILTI KB-TZ2 EXP <br />ANCHOR <br />5 <br />S4.0-1 <br />SHAFT SIDE <br />3/16 <br />3/16 <br />TYP <br />ABANDONED <br />3/4" THK EMBED PL <br />W/ (2) 5/8"Ø x 6" <br />WELDED STUDS <br />3/4" THK PL EXTENSION <br />ALT: 1/2" THK <br />STITCH PL W/ 1/4" <br />FILLET WELD EA <br />SIDE, FULL LENGTH <br />OF JOINT <br />TYP <br />1 1/2" <br />TYP <br />1 1/2" <br />2" 8" 2" <br />#249 <br />3/4" THK PL W/ (2) <br />5/8"Φ x 4" EMBED <br />HILTI KB-TZ2 EXP <br />ANCHOR <br />3/16 <br />SLAB ON GRADE <br />(WHERE OCCURS) <br />L6x4x3/8 (LLV) AT <br />ELEVATOR SILL W/ 1/2"Ø <br />x 4" WELDED STUDS @ <br />12" OC (MAX 6" TO ENDS) <br />3/8" THICK ANGLE. <br />EQUAL LEGS <br />LENGTH TO MATCH <br />SILL ASSEMBLY (BY <br />OTIS) WIDTH <br />CONCRETE WALL <br />PER PLAN <br />(3) 1/2"Ø x4" NSA <br />EMBED PL1/2 (AS REQURED <br />FOR GUIDERAIL ATTACHMENT3"3"3" 1' - 0"1' - 0" 3" <br />CL GUIDERAIL <br />ELEVATOR SILL ATTACHMENT <br />AT PIT DETAIL <br />ELEVATOR GUIDERAIL ATTACHMENT DETAIL <br />A <br />A ELEVATION <br />3/16 3-12 <br />ELEVATOR SILL ATTACHMENT <br />AT (E) SLAB DETAIL <br />L7x4x3/8 (LLH) <br />(E) SLAB <br />(1) 3/8"Ø x 2" EMBED <br />HILTI 'KB-TZ2' @ 6" OC <br />STAGG (8 TOTAL MIN) <br />1 1/2" <br />3/16 3-12 <br />3/16 3-12 <br />2 1/2" <br />DOWEL TO MATCH SIZE <br />& SPACING OF HORIZ REINF <br />VERT & HORIZ REINF <br />PERSCHED LAP SPLICE PER(2) #5 CONT <br />VERT BARS <br />PLAN VIEW <br />5 <br />S4.0-11/S4.0-1A SINGLE CURTAIN <br />(WHERE OCCURS) <br />VERT END BARS <br />PER ELEV @ 6" OC <br />@ 6" OC (WHERE OCCURS)VERT END BARS PER ELEVLAP PER SCHED <br />(3) #6 MIN <br />B DOUBLE CURTAIN <br />VERT WALL REINFORCING <br />PER ELEV LOCATE FIRST <br />BARS OF VERT REINF <br />ADJACENT TO LAST <br />ADDITIONAL END BAR PER <br />ELEV <br />BENT DOWEL TO <br />MATCH SIZE AND <br />SPACING OF <br />WALL HORIZ <br />REINF <br />PLAN VIEW <br />CORE 6"Ø HOLE AT <br />CORNERS AND SAWCUT. <br />DO NOT OVERCUT <br />OPENING. CHIP AWAY <br />FINAL CORNER <br />NEATLY CUT AND <br />CHIP OUT <br />CORNER <br />STOP SAWCUT. <br />DO NOT OVERCUT <br />SAW <br />BLADE <br />B <br />B DETAIL <br />SAWCUT DETAIL <br />A DETAIL <br />ELEVATION <br />3/4"Ø THREADED ROD EMBEDDED <br />INTO (E) CONCRETE W/ <br />EPOXY PER GENERAL NOTES <br />@ 24" OC (MIN OF 4) AT HEAD <br />@ 36" OC (MIN OF 3) AT JAMB <br />MC10x22 (TYP <br />ALL AROUND) <br />PROCEDURE: <br />1. SHORE BEAMS, JOISTS, PURLINS, ETC., SUPPORTED BY <br />WALL. <br />2. SAW CUT AND REMOVE WALL. <br />3. DRILL ALL HOLES FOR ANCHORS. <br />4. INSTALL CHANNEL AT HEAD. <br />5. INSTALL CHANNEL AT JAMBS AND WELD JAMBS TO HEAD. <br />6. REMOVE SHORING.EMBED7" MINOPENINGEMBED <br />7" MINOPENING <br />(12'-0" MAX)PER ARCH DWGSD <br />A <br />(12'-6" MAX) <br />PER ARCH DWGS <br />3/16 <br />TYP <br />TYP <br />C <br />C HEADER D JAMB <br />SLAB ON GRADE <br />CONSTRUCTION JOINT <br />OR CONTROL JOINT <br />WHERE OCCURS <br />REINF PER PLAN <br />PREPARED SUBGRADE PER <br />GEOTECHNICAL REPORT <br />VAPOR RETARDER PER PLAN2" CLR (TYP)TOP OF SLAB <br />PER PLAN <br />1'-6" <br />2 <br />1 <br />#4 CONT (T&B)DOWELS TO MATCH <br />SLAB REINFORCING <br />TOOLED EDGE <br />FINISH <br />SURFACE <br />MIN1' - 0"1' - 0" <br />CLR <br />3"PER PLANTHICKNESS 0"VAPOR RETARDER <br />#3 DOWELS @ 12" OC <br />W/ 3" MIN EMBED INTO <br />(E) SLAB W/ EPOXY PER <br />GENERAL NOTES <br />TOP OF (E) SLAB <br />(TYP) <br />(2) #3 CONT W/ 1'-6" LONG HOOK <br />AT CORNER OR CORNER BARS <br />#3 @ 12" OC W/ 3" <br />MIN EMBED INTO (E) <br />SLAB W/ EPOXY PER <br />GENERAL NOTES <br />1'-6"1'-6"(1) #3 CONT W/ 1'-6" LG <br />HOOK AT CORNER OR <br />CORNER BARS <br />1'-6"1'-6"8" MAX <br />5 1/2" MIN <br />(4" MIN, 8" MAX)PER ARCH(E) SLAB <br />15" MAX <br />"W "(4" MIN, 8" MAX)PER ARCH"W" - 3" <br />PIPE TRENCH <br />SHALL BE <br />LOCATED SO <br />THAT FOOTING <br />WILL NOT BE <br />UNDERMINED <br />BACKFILL <br />PER SPECS <br />NO EXCAVATION <br />ALLOWED BELOW <br />THIS LINE <br />PLACE CONCRETE FILL <br />AROUND SLEEVES BEFORE <br />POURING FOOTING PADS. <br />PROVIDE 1" CLR MIN BETWEEN <br />PIPE AND SLEEVE ALL-AROUND <br />CONC OR <br />CMU WALL <br />2 <br />1 <br />FTG <br />POUR JT <br />NO PIPES SHALL <br />PASS THRU FTG <br />PAD UNO <br />NOTES: <br />1. WHEN SEVERAL PIPES ARE EMBEDDED, MAINTAIN 2 DIAMETERS OR 6" MIN <br />HORIZONTAL DISTANCE BETWEEN PIPES. <br />2. CONDUITS NEED TO BE SLEEVED PER THIS DETAIL. IT IS ACCEPTABLE TO GROUP <br />CONDUITS OF THE SAME NATURE IN THE SAME SLEEVE. <br />3. "D" = OUTSIDE DIAMETER OF SLEEVE. <br />ELEVATION SECTION4" MINMIN <br />"D"+1'-6"FTG PER PLAN. 3" <br />1'-6" MIN <br />2" MIN4" MIN"D"6" MINFOOTINGS SHALL BE <br />STEPPED SO THAT <br />CONCRETE FILL DOES <br />NOT EXCEED 3'-0" <br />2' - 4" <br />PIT LADDER AND <br />ANCHOR BRACKETS BY <br />OTHERS <br />3/8"Ø x 2 1/2" EMBED <br />HILTI KB-TZ2 EA SIDE <br />T&B (4 MIN) <br />ELEVATOR PIT WALL <br />(REINF NOT SHOWN FOR <br />CLARITY) <br />PER <br />#5 Z DOWEL @ 12" OC <br />REINF PER PLAN <br />#222 <br />6"#222 <br />STUB OUT2" CONC8"#222 <br />NIR <br />No. S3866 <br />Exp. 3/31/26G <br />TRE <br />TATSSE OFILACFO <br />UCT U R ARLR <br />STER EDPLOFESSIONA <br />NERAIEENGIWILLIH.THO <br />RP......... <br />. <br />. <br />. <br />. <br />. <br />......................................................EAMI <br />U <br />E <br />I <br />H <br />U <br />9 <br />AS.O <br />A <br />FRANCN <br />4 0 8 0 <br />H <br />I <br />N <br />S <br />L11 <br />AL <br />E <br />CR <br />NDEN VA <br />,N I N G <br />CRAE <br />TCEI T <br />SC <br />S <br />N <br />N <br />G R O U P <br />7 <br />S <br />5 06 <br />C <br />07 18 <br />2 <br />P <br />R <br />A <br />O <br />90 <br />A <br />EU <br />C <br />+ <br />ER <br />4 <br />SHEET TITLE AND NO. <br />ISSUE DATE <br />PROJECT: <br />CA REG. <br />Project Arch.---- <br />---- <br />BID SET <br />FINAL PERMIT/CONFORM SET <br />04/30/2024 <br />08/02/2024 <br />22575-01 <br />26 CIVIC CENTER <br />PLAZA <br />SANTA ANA <br />CA 92701 <br />SANTA ANA <br />LIBRARY <br />RENOVATION <br />CITY OF SANTA ANA <br />26 CIVIC CENTER PLAZA <br />SANTA ANA, CA 92701 <br />8/21/2025 3:36:40 PMAutodesk Docs://Santa Ana Library/22575-01 Santa Ana Library_Struct_SR22.rvtS4.0-1 <br />TYPICAL <br />CONCRETE <br />DETAILS <br />JOB NUMBER: 2100588; JOB NAME: Santa Ana Library Renovation; SHEET: S4.0-1; PD: MJS; PM: ES1" = 1'-0"1NORMAL WEIGHT CONCRETE LAP SPLICE SCHEDULE (CLASS B) <br />1" = 1'-0"2REINFORCING BAR BENDING DETAIL <br />1" = 1'-0"3REBAR DEVELOPMENT LENGTH <br />1" = 1'-0"4TYPICAL KEY DETAIL <br />1" = 1'-0"5ELEVATOR PIT DETAIL <br />1" = 1'-0"6SLAB TO EXISTING SLAB <br />1" = 1'-0"7GUIDERAIL BASE PLATE <br />1" = 1'-0"8ATTACHMENT DETAILS AT ELEVATOR <br />1" = 1'-0"9CONCRETE WALL CORNER DETAIL <br />1" = 1'-0"10SAW CUT OPNG IN EXISTING CONC WALL <br />1" = 1'-0"11TYPICAL SLAB ON GRADE <br />1" = 1'-0"12EDGE OF SLAB ON GRADE <br />1" = 1'-0"13CONCRETE CURB ON EXISTING SLAB <br />1" = 1'-0"14PIPE TRENCH DETAIL <br />1 1/2" = 1'-0"15ELEVATOR PIT LADDER <br />REV #DESCRIPTION DATE <br />#222 RFI 06.30.2025 <br />#249 RFI 08.21.2025 <br />ISSUE DATE <br />PERMIT SET 1ST ISSUANCE <br />BID SET <br />FINAL PERMIT/CONFORM SET <br />09/29/2023 <br />04/30/2024 <br />08/02/2024 <br />REV # DESCRIPTION DATE <br />1 BACKCHECK REV-1 03.01.2024 <br />2 CITY REVIEW REV-1 08.02.2024 <br />3 CITY REVIEW REV-2 10.18.2024 <br />4 CITY REVIEW REV-3 01.27.2025 <br />5 CITY REVIEW REV-4 04.07.2025 <br />6 CITY REVIEW REV-5 06.27.2025 <br />7 CITY REVIEW REV-6 10.24.2025 <br /> <br />REVIEWED FOR CONSTRUCTABILITY: <br /> 80470 <br />SEAN THOMAS. P.E. RCE NO: <br />PRINCIPAL CIVIL ENGINEER <br />DATE: <br />RECOMMENDED FOR CONSTRUCTION: <br /> 62968 <br />JASON GABRIEL. P.E. RCE NO: <br />PRINCIPAL CIVIL ENGINEER <br />DATE:
The URL can be used to link to this page
Your browser does not support the video tag.