Laserfiche WebLink
July 20, 2025 <br />60-ft Monopole Tower Structural Analysis Report CCI BU No 845391 <br />TEP Project Number 229344.1130072, Order 709035, Revision 0 Page 2 <br />tnxTower Report - version 8.3.1.2 <br />TABLE OF CONTENTS <br /> <br /> 1) INTRODUCTION <br /> <br /> 2) ANALYSIS CRITERIA <br /> Table 1 - Proposed Equipment Configuration <br /> Table 2 - Other Considered Equipment <br /> <br /> 3) ANALYSIS PROCEDURE <br /> Table 3 - Documents Provided <br /> 3.1) Analysis Method <br /> 3.2) Assumptions <br /> <br /> 4) ANALYSIS RESULTS <br /> Table 4 - Section Capacity (Summary) <br /> Table 5 - Tower Component Stresses vs. Capacity <br /> 4.1) Recommendations <br /> <br /> 5) APPENDIX A <br /> tnxTower Output <br /> <br /> 6) APPENDIX B <br /> Base Level Drawing <br /> <br /> 7) APPENDIX C <br /> Additional Calculations <br /> <br /> <br />