Laserfiche WebLink
MECHANICAL ATTACHMENT <br />AT INDICATED LOCATION <br />NOTE: <br />EXAMPLE BALLAST AND <br />ATTACHMENTS SHOWN ON THIS <br />PAGE ARE FOR REFERENCE <br />ONLY. REFER TO BALLAST MAP <br />SHEETS FOR ARRAY SPECIFIC <br />BALLAST/ATTACHMENT <br />REQUIREMENTS. <br />BALLAST QUANTITY: <br />"#"=QUANTITY OF BALLAST BLOCK INSTALLEDCENTERED UNDER MODULE <br />IF NO BALLAST QUANTITY SHOWN, DO NOT PLACE <br />BALLAST <br />SEE INSTALLATION MANUAL FOR NOTES ON <br />INSTALLING MORE THAN FOUR BALLAST BLOCKS PER <br />MODULE <br />DO NOT INSTALL ADDITIONAL RAIL TO HOLDBALLAST ON MODULES WITH NO BALLASTSHOWN. <br />MODULES LONGER THAN 2100 MM <br />WITH 7 OR 8 BALLAST BLOCKS REQUIRE <br />TWO (2) RAILS. <br />ARRAY CROSS SECTION VIEW A <br />NTS <br />RACKING CONSTRUCTION SET <br />Calsolar inc <br />South Coast Technology <br />Center <br />3600 S Susan St, Santa Ana, <br />CA 92704, USA <br />0 PC-7 <br />BALLAST LEGEND <br />APPROVED FOR CONSTRUCTION <br />25.02.04.0 v3.0.9406.0.5 CM <br />PC-7 PC-7 <br />0 <br />In <br />i <br />t <br />i <br />a <br />l <br /> <br />L <br />a <br />y <br />o <br />u <br />t <br />AW <br />20 <br />2 <br />5 <br />- <br />0 <br />5 <br />- <br />0 <br />2 <br />25-0242-3336 <br />5/7/2025 <br />TROY E.TURLEY