Laserfiche WebLink
PROJECT DATA <br />PROJECT LOCATION/ADDRESS: <br />1409 MERIDAY LN <br />SANTA ANA, CA 92706 <br />APN: 00407104 ZONE:R-1 (E) RESIDENCE AREA: 1,247 SF <br />LOT SIZE: 6,120 SF NO. OF STORIES:(E) 1 STORY (N) AREA:463 SF <br />TOTAL (N) AREA: 1,710 SF <br />CONTRUCTION TYPE:VB NON SPKLRD <br />OCC GROUP:R-3/U SEPTIC Y/N:NO <br />LEGAL DESCRIPTION: LOT 50 OF COLLEGE CREST, TRACT NO. 1925, IN THE CITY OF SANTA <br />ANA, COUNTY OF ORANGE, STATE OF CA, AS SHOWN ON A MAP RECORED IN BOOK 53, <br />PAGES 9 AND 8, OF MISC MAPS, IN THE OFFICE OF THE COUNTRY RECORDER OF SAID <br />COUNTY. <br />LOT COVERAGE: LOT: 6,120 SF (N) TOTAL SF: (E)1,247 + (E)390 + (N)401 + (N)62 390 = 2,099 SF. <br />34%<35% MAX <br />SCOPE OF WORK: <br />401 SF ADDITION TO BACK HALF OF PROPERTY (ENLARGING LIVING ROOM AND <br />BEDROOM. MODIFYING LAUNDRY AREA & CONVERTING WATER HEATER TO GAS <br />TANKLESS. 62 SF ADDITION TO FRONT BEDROOM BATH AREA. (E) COVERED <br />PATIO WILL BE DEMOLISHED <br />PROJECT DIRECTORY <br />APPLICANT / OWNER: <br />JAVIER NICANOR <br />1409 MERIDAY LN <br />SANTA ANA, CA 92706 <br />PHONE: 714.600.2445 <br />EMAIL: JAVI.NICANOR86@GMAIL.COM <br />DESIGNER: <br />LAM NGUYEN <br />2476 N BEECHWOOD ST <br />ORANGE, CA 92865 <br />PHONE: 714.657.9333 <br />EMAIL: CUMULUSDESIGNBUILD@GMAIL.COM <br />STRUCTURAL / TITLE24: <br />TRUONG DONG <br />12682 HOOVER ST. <br />GARDEN GROVE, CA 92841 <br />PHONE: 714.617.5979 <br />EMAIL: TROY@DONGENGINEERING.COM <br />GENERAL NOTES <br />DOCUMENT /VERIFICATION <br />THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL EXISTING CONDITIONS, CONTRACT DOCUMENTS, AND DIMENSIONS FOR <br />ACCURACY AND CONFIRMING THAT THE WORK IS BUILDABLE AS SHOWN BEFORE PROCEEDING, IE THERE ARE ANY QUESTIONS OR <br />DEVIATIONS IN THE ’’AS-BUILTS”THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING IMMEDIATE CLARIFICATION, FROM THE ARCHITECT/ <br />DESIGNER. IF THE WORK IS STARTED PRIOR TO CLARIFICATION, THE GENERAL AND SUBCONTRACTORS PROCEED AT THEIR OWN RISK. <br />CONSULT WITH ARCHITECT/DESIGNER REGARDING ANY SUSPECTED ERRORS, OMISSIONS OR CHANGES ON PLANS BEFORE <br />PROCEEDING WITH THE WORK. THE CONTRACTOR SHALL INSTALL ALL MATERIALS AND EQUIPMENT PER THE MANUFACTURERS <br />RECOMMENDATIONS. ANY CONFLICT WITH THE AS-BUILTS OR PLANS AND SPECIFICATIONS SHALL BE BROUGHT TO THE <br />ARCHITECT’S/DESIGNER'S ATTENTION FOR IMMEDIATE RECONCILIATION PRIOR TO PROCEEDING WITH THE WORK. DO NOT SCALE <br />DRAWINGS. UNLESS OTHERWISE NOTED, PLAN DIMENSIONS INTERIOR AND EXTERIOR ARE TO FACE OF STUD OR FACE OF CONCRETE <br />WALLS. VERIFY ALL ROUGH-IN DIMENSIONS FOR WINDOWS, DOORS, PLUMBING, TO COMMENCEMENT OF WORK. NOTIFY ARCHITECT OF <br />ELECTRICAL FIXTURES AND APPLIANCES PRIOR ANY DISCREPANCIES IN THE WORK OR DIMENSIONAL TOLERANCES REQUIRED. <br />ARCHITECT SHALL BE NOTIFIED IMMEDIATELY WHEN ANY DISCREPANCY WITH STRUCTURAL DRAWINGS IS FOUND. ALL DRAWINGS MAY <br />HAVE TO BE MODIFIED UPON REMOVAL OF EXISTING CONSTRUCTION. DO NOT PROCEED WITH WORK IN QUESTION UNTIL ARCHITECT <br />ISSUES DIRECTIONS <br />EXISTING CONDITIONS <br />EXISTING CONDITIONS ARE IDENTIFIED AS (E) ON THE DRAWINGS. NOTIFY THE ARCHITECT AND OWNER OF ANY EXISTING AREAS OF <br />DEMO WITH WOOD SHOWING EVIDENCE OF ACTIVE WATER, WATER LEAKS, TERMITES OR DRY ROT <br />CONSTRUCTABILITY <br />AFTER DEMOLITION AND PRIOR TO CONSTRUCTION THE CONTRACTOR IS TO VERIFY THE CONDITIONS OF THE REMAINING <br />CONSTRUCTION FOR CRACKS, CHANGES IN ELEVATION (SLOPE) AND ANY STRUCTURAL DEFECTS, AND NOTIFY THE ARCHITECT OF ANY <br />AND ALL DEFECTS <br />CONSTRUCTION STANDARDS <br />CONSTRUCTION SHALL CONFORM TO STANDARD CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS GENERAL INDUSTRY SAFETY <br />ORDER, TITLE 8. THESE DRAWINGS DO NOT INCLUDE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. SAFETY OF ALL PRESENT <br />ON THE JOB SITE IS THE CONTRACTOR’S RESPONSIBILITY <br />ALTERATIONS <br />WHEN ALTERATIONS, STRUCTURAL REPAIRS, MODICATIONS OR ADDITIONS ARE MADE TO AN EXISTING BUIDLING, THAT BUILDING, OR <br />PROTION OF THE BUILDING AFFECTED IS REQD TO COMPLY WITH ALL OF THE REQUIREMENTS FOR NEW BUILDINS, PER SECTION 1134B.2. <br />TEMPORARY CONSTRUCTION <br />CONTRACTOR IS RESPONSIBLE TO VERIFY ALL FIELD CONDITIONS AND PROVIDE FOR ADEQUATE BRACING, SUPPORTS AND SHORING AS <br />REQUIRED TO HOLD EXISTING WORK SECURELY IN PLACE AND TO SUSTAIN ALL EXISTING LOADS DURING ERECTION AND UNTIL <br />SUBSEQUENT CONSTRUCTION IS COMPLETED. ALL SHORING AND BRACING SHALL BE IN ACCORDANCE WITH CURRENT REQUIREMENTS <br />OF CALOSHA THE INDUSTRIAL ACCIDENT COMMISSION OF THE STATE OF CALIFORNIA AND OTHER PUBLIC AGENCIES HAVING <br />JURISDICTION. THE DRAWINGS DO NOT INDICATE METHODS OF BRACING AND TEMPORARY SHORING REQUIRED TO PERFORM THE <br />DEMOLITION WORK. <br />RECYCLING AND DEBRIS <br />CONTRACTOR TO REMOVE AND DISPOSE OF ALL RECYCLABLE DEBRIS IN A WASTE FACILITY APPROVED BY THE GOVERNING AGENCY. <br />ALL RECEIPTS FOR RECYCLING WILL NEED TO BE MAINTAINED FOR RECORDS AND AGENCY REIMBURSEMENT. THE CONTRACTOR SHALL <br />TRANSPORT MATERIALS OFF SITE AND PROPERLY DISPOSED OF AT CITY APPROVED LOCATIONS IN ACCORDANCE WITH APPLICABLE <br />LAWS <br />AND REGULATIONS, UNLESS SPECIFIED BY THE OWNER <br />GLAZING <br />ALL GLAZING WITHIN THE FOLLOWING CONDITIONS WILL BE MADE OF TEMPERED GLASS. <br />A. ALL GLAZING WITHIN 18”OF FINAL GRADE AND/OR WALKING SURFACE. <br />B. WHERE THE BOTTOM EDGE OF WINDOW IS LESS THAN 60”OF A WALKING SURFACE. <br />C. WALL GLAZING WITHIN A 24”ARC OF EITHER HORIZONTAL OR VERTICAL EDGE OF DOORS IN THE CLOSED POSITION. <br />D. ALL GLAZING WITHIN A 24”ARC OF EITHER HORIZONTAL OR VERTICAL EDGE OF COOKING SURFACES. <br />FINISH FLOOR <br />’’FINISH FLOOR”REFERS TO TOP OF FINISH MATERIAL ATOP OF CONCRETE SLAB OR WOOD SUBLFOOR <br />FRAMING <br />ALL INTERIOR FRAME PARTITIONS TO BE 4”WOOD STUD @ 16”OC, UNO. WOOD MEMBERS IN CONTACT WITH CONCRETE, AND/OR <br />EXPOSED TO WEATHER TO BE PRESSURE TREATED, TYPICAL. <br />GYPSUM BOARD <br />GYPSUM BOARD TO BE MECHANICALLY FASTENED WITH DRYWALL SCREWS THROUGHOUT. <br />ELECTRICAL POWER <br />DURING WORK TURN OFF ELECTRICAL POWER AND PROVIDE TEMPORARY POWER FOR CONSTRUCTION USE. IE CLIENT TO REMAIN AT <br />RESIDENCE DURING CONSTRUCTION, PROVIDE SAFE PROVISIONS FOR POWER <br />INSPECTIONS <br />REQUEST FOR AN INSPECTION WILL BE MADE 48 HOURS IN ADVANCE. INSPECTIONS SHALL BE MADE ONCE WORK IS COMPLETE , <br />UTILIZING APPROVED AND STAMPED PLANS. CONTRACTOR SHALL BE REQUIRED TO HAVE THE APPROVED PLANS ON SITE PER CODE. <br />CLEAN UP <br />BROOM CLEAN AND READY THE AREA TO RECEIVE NEW WORKDRAWING SYMBOLS <br />FIRE DEPARTMENT NOTES <br />DEMOLITION AND CONSTRUCTION <br />DEMOLITION AND CONSTRUCTION SHALL COMPLY w/ THE REQUIREMENTS OF <br />CALIFORNIA FIRE CODE CHAPTER 14 TIRE SAFETY DURING CONSTRUCTION AND <br />DEMOLITION." CONSTRUCTION SHALL ALSO CONFORM TO STANDARD CALIFORNIA <br />DEPARTMENT OF INDUSTRIAL RELATIONS GENERAL INDUSTRY SAFETY ORDER, TITLE <br />8. THESE DRAWINGS DO NOT INCLUDE NECESSARY COMPONENTS FOR <br />CONSTRUCTION SAFETY. SAFETY OF ALL PRESENT ON THE JOB SITE IS THE <br />CONTRACTOR'S RESPONSIBILITY <br />BUILDING ADDRESS <br />NEW AND EXISTING BUILDINGS SHALL HAVE APPROVED ADDRESS NUMBERS, <br />BUILDING NUMBERS OR APPROVED BUILDING IDENTIFICATION PLACED IN A POSITION <br />THAT IS PLAINLY LEGIBLE AND VISIBLE FROM THE STREET OR ROAD FRONTING THE <br />PROPERTY. THESE NUMBERS SHALL CONTRAST IN COLOR TO BACKGROUND. <br />NUMBERS SHALL BE A MIN OF 4" HIGH w/ A MIN STOKE WIDTH OF 1/2", CFC SECTION <br />505.1 <br />KEY BOX <br />WHERE ACCESS TO OR w/IN A STRUCTURE OR AN AREA IS RESTRICTED BECAUSE OF <br />SECURED OPENINGS OR WHERE IMMEDIATE ACCESS IS NECESSARY FOR LIFE- <br />SAVING OR FIRE-FIGHTING PURPOSES, THE FIRE CODE OFFICIAL IS AUTHORIZED TO <br />REQUIRE A KEY BOX TO BE INSTALLED IN AN APPROVED LOCATION. THE KEY BOX <br />SHALL BE OF AN APPROVED TYPE AND SHALL CONTAIN KEY(S) TO GAIN NECESSARY <br />ACCESS AS REQD BY THE EIRE CODE OFFICIAL, CFC SECTION 503.6 <br />CODE REFERENCES <br />ALL DESIGN AND PLANS BASED ON THE 2022 CALIFORNIA (CRC), CALIFORNIA PLUMBING <br />CODE (CPC), CALIFORNIA MECHANICAL CODE (CMC), CALIFORNIA ELECTRICAL CODE <br />(CEC) AND 2022 CALIFORNIA ENERGY CODE AND CITY OF SANTA ANA MUNICIPAL CODE. <br />THE STRUCTURAL ELEMENTS, WORKMANSHIP AND MATERIALS SHALL COMPLY WITH THE <br />2022 EDITION OF CALIFORNIA BUILDING CODE (CBC) <br />2022 CALIFORNIA BUILDING CODE (CBC) <br />[2021 INTERNATIONAL BUILDING CODE (IBC)] <br />2022 CALIFORNIA ELECTRICAL CODE (CEC) <br />[2021 NATIONAL ELECTRICAL CODE (NEC)] <br />2022 CALIFORNIA MECHANICAL CODE (CMC) <br />[2021 UNIFORM MECHANICAL CODE (UMC)] <br />2022 CALIFORNIA PLUMBING CODE (CPC) <br />[2021 UNIFORM PLUMBING CODE (UPC)] <br />2022 CALIFORNIA ENERGY CODE <br />[2021 BUILDING ENERGY EFFICIENCY STANDARDS] <br />2022 CALIFORNIA FIRE CODE (CFC) <br />[2021 INTERNATIONAL FIRE CODE (IFC)] <br />2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGreen Code) <br />Scale <br />Project number <br />Date <br />Drawn by <br />Checked by <br />LAM NGUYEN B.ARCH <br />1/4" = 1'-0" <br />1/ <br />2 <br />0 <br />/ <br />2 <br />0 <br />2 <br />6 <br /> <br />1 <br />1 <br />: <br />1 <br />5 <br />: <br />5 <br />2 <br /> <br />A <br />M <br />T-00 <br />TITLE SHEET <br />25.006 <br />ADDITIONS & BATH <br />REMODEL <br />1409 MERIDAY LN <br />05.29.2025 <br />LN <br />LN <br />SHEET INDEX <br />TITLE <br />T-00 TITLE SHEET <br />T24 <br />T24.1 ENERGY CALCULATIONS <br />T24.2 ENERGY CALCULATIONS <br />CALGREEN <br />CG-01 CALGREEN CODE <br />CG-02 CALGREEN CODE <br />VICINITY MAP PROJECT LOCATION <br />SHEET INDEX <br />ARCHITECTURE <br />A-0.0 (E) & (N) SITE PLAN <br />A-1.0 FLOOR PLAN <br />A-1.1 DEMO PLAN & RCP <br />A-2.0 ELEVATIONS & SECTIONS <br />STRUCTURAL <br />S0 GENERAL NOTES <br />S1 FOUNDATION PLAN <br />S2 ROOF FRAMING PLAN <br />SD1 STRUCTURAL DETAILS <br />SD2 STRUCTURAL DETAILS <br />SD3 STRUCTURAL DETAILS <br />No. Description Date <br />01.20.2026