Laserfiche WebLink
STATE OF CALIFORNIA <br />Indoor Lighting CALIFORNIA ENERGY COMMISSION <br />CERTIFICATE OF COMPLIANCE NRCC-LTI-E <br />Project Name: STRONG Report Page: (Page 6 of 7) <br />Date Prepared: 3/28/2025 <br />Generated Date/Time:Documentation Software: EnergyPro <br />CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 <br />Schema Version: rev 20220101 <br />Compliance ID: EnergyPro-50399-0325-0081 <br />Report Generated: 2025-03-28 08:41:35 <br />R. 80% LIGHTING POWER FOR ALL ALTERATIONS - CONTROLS EXCEPTIONS <br />This section does not apply to this project. <br />S. DAYLIGHT DESIGN POWER ADJUSTMENT FACTOR (PAF) <br />This section does not apply to this project. <br />T. DWELLING UNIT LIGHTING <br />This section does not apply to this project. <br />U. DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION <br />Selections have been made based on information provided in this document. If any selections have been changed by permit applicant, an explanation should be included in Table E. <br />Additional Remarks. These documents must be provided to the building inspector during construction and can be found online <br />Form/Title <br />NRCI-LTI-E - Must be submitted for all buildings <br />V. DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE <br />Selections have been made based on information provided in this document. If any selections have been changed by the permit applicant, an explanation should be included in Table E. <br />Additional Remarks. These documents must be provided to the building inspector during construction and any with "-A" in the form name must be completed through an Acceptance <br />Test Technician Certification Provider (ATTCP). For more information visit: http://www.energy.ca.gov/title24/attcp/providers.html <br />Form/Title Systems/Spaces To Be Field <br />Verified <br />NRCA-LTI-02-A - Must be submitted for occupancy sensors and automatic time switch controls.Whole Building Time Switch; <br />NRCA-LTI-03-A - Must be submitted for automatic daylight controls.Whole Building; <br />NRCA-LTI-04-A - Must be submitted for demand responsive lighting controls.Whole Building Demand <br />Response;