Laserfiche WebLink
PROVIDE CONC. SEALER @ TOP <br />TOOLED OR SAW CUT <br />JOINT MIN. 3/4" SLAB DEPTH <br />REINFORCING PER STRUCT. <br />CONCRETE SLAB PER STRUCT. <br />10 MIL VAPOR RETARDER @ <br />CONDITIONED SPACES <br />CONTRACTION JOINT AT 4'-0" O.C. MAX. <br />A <br />EXPANSION JOINT AT 20'-0" O.C. MAX.B <br />CONTRACTION JOINT (BETWEEN POURS) <br />C <br />ISOLATION JOINT -OUTDOOR AREAS ONLY: NON-INTERIOR <br />D <br />PROVIDE CONC. SEALER @ TOP <br />SEALANT W/ BOND BREAKER <br />REINFORCING STOP @ JOINT <br />CONCRETE SLAB PER STRUCT. <br />10 MIL VAPOR RETARDER @ <br />CONDITIONED SPACES <br />EXPANSION JOINT MATERIAL <br />REBAR PER STRUCT. <br />COATED TO PREVENT BOND <br />PROVIDE CONC. SEALER @ TOP <br />REBAR PER STRUCT. <br />COATED TO PREVENT BOND <br />REINFORCING-STOP @ JOINT <br />PER STRUCT. <br />CONCRETE SLAB PER STRUCT. <br />10 MIL VAPOR RETARDER @ <br />CONDITIONED SPACES <br />PROVIDE CONC. SEALER @ TOP <br />REINFORCING PER STRUCT. <br />SEALANT W/BOND BREAKER <br />EXPANSION JOINT MATERIAL <br />CONCRETE SLAB PER STRUCT. <br />4" OF 1/2" OR LARGER <br />CLEAN GRANULAR FILL <br />4" OF 1/2" OR LARGER <br />CLEAN GRANULAR FILL <br />4" OF 1/2" OR LARGER <br />CLEAN GRANULAR FILL <br />4" OF 1/2" OR LARGER <br />CLEAN GRANULAR FILL <br />NOTE: CONCRETE TO SLOPE 2% <br />TOWARDS EDGE OF SLAB, TYP. <br />SCALE: <br />DATE: <br />NO. <br />ISSUES: <br />DATE DESCRIPTION <br />OWNERS: <br />DR. CHAN KIEU & DR. QUYNH KIEU <br />2221 N. HELIOTROPE DR <br />SANTA ANA, CA 92706 <br />ARCHITECT: <br />QUENTIN STANTON <br />ARCHITECTURE <br />3712 CROWN POINT DR <br />SAN DIEGO, CA 92109 <br />(619)985-8822 <br />Q@QSTANTON.COM <br />STRUCTURAL ENGINEER: <br />TUNG THANH VO, M.S., P.E. <br />11122 BIXLER CIR. <br />GARDEN GROVE, CA 92840 <br />(714)928-2006 <br />TUNGCIVIL2018@GMAIL.COM <br />HELIOTROPE <br />PAVILION <br />2221 N. HELIOTROPE DR <br />SANTA ANA, CA 92706 <br />SHEET TITLE: <br />SHEET NUMBER: <br />05/18/25 1ST SUBMISSION <br />10/27/25 2ND SUBMISSION1 <br />12/16/25 3RD SUBMISSION2 <br />As indicated <br />12/16/2025 3:02:47 PM <br />A110 <br />TYP SLAB <br />DETAILS & <br />ICC-ES <br />REPORT <br />12/16/2025 <br />1" = 1'-0"1 CONCRETE JOINTS2ROOF TILE ICC REPORT <br />2 <br />12/16/2025 <br />04/30/2027 <br />DIGITALLY STAMPED/SIGNED ON