SI SPECIAL INSPECTIONS AND STRUCTURAL TESTING <br />SI-1) SPECIAL INSPECTIONS SHALL BE PERFORMED BY A SPECIAL INSPECTOR PER <br />CBC SECTIONS 1704 AND 1705. THE SPECIAL INSPECTOR SHALL BE EMPLOYED BY THE OWNER AND NOT BY THE CONTRACTOR <br />OR ANY OTHER PERSON RESPONSIBLE FOR THE WORK. <br />SI-2) THE SPECIAL INSPECTOR SHALL BE A QUALIFIED (LICENSED) PERSON WHO SHALL <br />PROVIDE WRITTEN DOCUMENTATION TO THE BUILDING OFFICIAL DEMONSTRATING HIS OR HER COMPETENCE AND RELEVANT <br />TRAINING OR EXPERIENCE TO THE SATISFACTION OF THE BUILDING OFFICIAL. EXPERIENCE SHALL BE FOR SPECIAL INSPECTION <br />OF THE PARTICULAR TYPE OF CONSTRUCTION OR OPERATION REQUIRING SPECIAL INSPECTION. <br />SI-3)THE CONTRACTOR SHALL SUBMIT A WRITTEN STATEMENT OF RESPONSIBILITY PER CBC SECTION 1704.4 TO THE BUILDING <br />OFFICIAL AND THE OWNER PRIOR TO THE COMMENCEMENT OF WORK WHEN RESPONSIBLE. THE STATEMENT OF RESPONSIBILITY <br />SHALL CONTAIN ACKNOWLEDGEMENT OF AWARENESS OF THE SPECIAL REQUIREMENTS CONTAINED IN THE STATEMENT OF <br />SPECIAL INSPECTION. <br />SI-4)THE FOLLOWING WORK REQUIRES STRUCTURAL TESTS. FOR SPECIFIC REQUIREMENTS OF STRUCTURAL TESTS, SEE THE <br />SPECIFICATIONS AND GENERAL NOTES. <br />1. CONCRETE REINFORCEMENT <br />2. CAST-IN-PLACE CONCRETE <br />3. POST-INSTALLED ANCHORS <br />4 GROUTED DOWELS <br />5. STRUCTURAL STEEL MATERIALS AND FABRICATION <br />6 WELDING: STRUCTURAL STEEL AND REINFORCING STEEL <br />7. STEEL DECKING <br />8. COLD FORMED METAL FRAMING <br />SI-5)THE FOLLOWING ITEMS SHALL RECIEVE SPECIAL INSPECTION BY A CERTIFIED SPECIAL INSPECTOR AS REQUIRED THE THE <br />LOCAL JURISDICTION AND CBC SECTION 1705.1.1: <br />1. FIRE PROOFING <br />2. PENETRATIONS <br />SI-6) THE FOLLOWING ITEMS SHALL RECEIVE SPECIAL INSPECTION BY A CERTIFIED SPECIAL INSPECTOR IN ACCORDANCE WITH <br />CBC 1704 AND 1705. <br />REQUIRED VERIFICATION AND INSPECTION OF CONCRETE CONSTRUCTION <br />VERIFICATION AND INSPECTION CONTINUOUS PERIODIC REFERENCED STANDARD CBC <br />REFERENCE <br />1.INSPECTION OF REINFORCING STEEL, INCLUDING <br />PRESTRESSING TENDONS, AND PLACEMENT.—X ACI 318: 3.5, 7.1-7.7 1910.4 <br />2.INSPECTION OF REINFORCING STEEL WELDING IN <br />ACCORDANCE WITH TABLE 1705.2.2, ITEM 2B.— — AWS D1.4, ACI 318: 3.5.2 — <br />3.INSPECTION OF ANCHORS CAST IN CONCRETE WHERE <br />ALLOWABLE LOADS HAVE BEEN INCREASED OR WHERE <br />STRENGTH DESIGN HAS BEEN USED. <br />ACI 318: 8.1.3, 21.2.8 1908.5, <br />1909.1 <br />5.VERIFYING USE OF REQUIRED DESIGN MIX. — X ACI 318: Ch. 4, 5.2-5.4 <br />1904.2, <br />1910.2, <br />1910.3 <br />6.AT THE TIME FRESH CONCRETE IS SAMPLED TO FABRICATE <br />SPECIMENS FOR STRENGTH TESTS, PERFORM SLUMP AND <br />AIR CONTENT TESTS, AND DETERMINE THE TEMPERATURE <br />OF THE CONCRETE. <br />X — <br />ASTM C 172, ASTM C 31, <br />ACI <br />318: 5.6, 5.8 <br />1910.10 <br />8.INSPECTION FOR MAINTENANCE OF SPECIFIED CURING <br />TEMPERATURE AND TECHNIQUES.— X ACI 318: 5.11-5.13 1910.9 <br />12.INSPECT FORMWORK FOR SHAPE, LOCATION AND <br />DIMENSIONS OF THE CONCRETE MEMBER BEING FORMED.— X ACI 318: 6.1.1 — <br />REQUIRED VERIFICATION AND INSPECTION OF SOILS <br />VERIFICATION AND INSPECTION TASK <br />CONTINUOUS <br />DURING TASK <br />LISTED <br />PERIODICALLY <br />DURING TASK <br />LISTED <br />1.VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS ARE ADEQUATE TO ACHIEVE THE DESIGN <br />BEARING CAPACITY.— X <br />2.VERIFY EXCAVATIONS ARE EXTENDED TO PROPER DEPTH AND HAVE REACHED PROPER MATERIAL. — X <br />3.PERFORM CLASSIFICATION AND TESTING OF COMPACTED FILL MATERIALS. — X <br />4.VERIFY USE OF PROPER MATERIALS, DENSITIES AND LIFT THICKNESSES DURING PLACEMENT AND <br />COMPACTION OF COMPACTED FILL.X — <br />5.PRIOR TO PLACEMENT OF CONTROLLED FILL, OBSERVE SUBGRADE AND VERIFY THAT SITE HAS <br />BEEN PREPARED PROPERLY.— X <br />4.INSPECTION OF ANCHORS POST-INSTALLED IN HARDENED <br />CONCRETE MEMBERS.X — ACI 318: 3.8.6, 8.1.3, 21.2.8 1909.1 <br />7.INSPECTION OF CONCRETE AND SHOTCRETE PLACEMENT <br />FOR PROPER APPLICATION TECHNIQUES.X — ACI 318: 5.9, 5.10 1910.6, 1910.7 <br />1910.8 <br />9.INSPECTION OF PRESTRESSED CONCRETE: <br />APPLICATION OF PRESTRESSING FORCES.A. <br />GROUTING OF BONDED PRESTRESSING TENDONS IN THE <br />SEISMIC-FORCE-RESISTING SYSTEM. <br />B. <br />X <br />X <br />—ACI 318: 18.20 ACI <br />318: 18.18.4 — <br />10. ERECTION OF PRECAST CONCRETE MEMBERS.— X ACI 318: CH.16 — <br />VERIFICATION OF IN-SITU CONCRETE STRENGTH, PRIOR TO <br />STRESSING OF TENDONS IN POST-TENSIONED CONCRETE <br />AND PRIOR TO REMOVAL OF SHORES AND FORMS FROM <br />BEAMS AND STRUCTURAL SLABS. <br />— X ACI 318: 6.2 — <br />11. <br />— <br />—X <br />INSPECTION TASKS PRIOR TO WELDING <br />INSPECTION TASKS PRIOR TO WELDING QUALITY CONTROL QUALITY ASSURANCE <br />WELDING PROCEDURE SPECIFICATIONS (WPSS) AVAILABLE P P <br />MANUFACTURER CERTIFICATIONS FOR WELDING CONSUMABLES <br />AVAILABLE P P <br />MATERIAL IDENTIFICATION (TYPE/GRADE)O O <br />WELDER IDENTIFICATION SYSTEM1 O O <br />FIT-UP OF GROOVE WELDS (INCLUDING JOINT GEOMETRY): <br />JOINT PREPARATION O O <br />FIT-UP OF GROOVE WELDS (INCLUDING JOINT GEOMETRY): <br />DIMENSIONS (ALIGNMENT, ROOT OPENING, ROOT FACE, BEVEL)O O <br />FIT-UP OF GROOVE WELDS (INCLUDING JOINT GEOMETRY): <br />CLEANLINESS (CONDITION OF STEEL SURFACES)O O <br />FIT-UP OF GROOVE WELDS (INCLUDING JOINT GEOMETRY): <br />TACKING (TACK WELD QUALITY AND LOCATION)O O <br />FIT-UP OF GROOVE WELDS (INCLUDING JOINT GEOMETRY): <br />BACKING TYPE AND FIT (IF APPLICABLE)O O <br />CONFIGURATION AND FINISH OF ACCESS HOLES O O <br />FIT-UP OF FILLET WELDS: <br />DIMENSIONS (ALIGNMENT, GAPS AT ROOT)O O <br />FIT-UP OF FILLET WELDS: <br />CLEANLINESS (CONDITION OF STEEL SURFACES)O O <br />FIT-UP OF FILLET WELDS: <br />TACKING (TACK WELD QUALITY AND LOCATION) <br />O O <br />CHECK WELDING EQUIPMENT O - <br />REFERENCE AISC 360-16 TABLE N5.4-1 <br />1 THE FABRICATOR OR ERECTOR, AS APPLICABLE, SHALL MAINTAIN A SYSTEM BY WHICH A WELDER WHO HAS <br />WELDED A JOINT OR MEMBER CAN BE IDENTIFIED. STAMPS, IF USED, SHALL BE THE LOW-STRESS TYPE <br />O - OBSERVE THESE ITEMS ON A RANDOM BASIS. OPERATIONS NEED NOT BE DELAYED PENDING THESE INSPECTIONS <br />P - PERFORM THESE TASKS FOR EACH WELDED JOINT OF MEMBER <br />INSPECTION TASKS DURING WELDING <br />INSPECTION TASKS DURING TO WELDING QUALITY CONTROL QUALITY ASSURANCE <br />USE OF QUALIFIED WELDERS O O <br />CONTROL AND HANDLING OF WELDING CONSUMABLES: <br />PACKAGING O O <br />CONTROL AND HANDLING OF WELDING CONSUMABLES: <br />EXPOSURE CONTROL O O <br />NO WELDING OVER CRACKED TACK WELDS O O <br />ENVIRONMENTAL CONDITIONS: WIND SPEED WITHIN LIMITS O O <br />ENVIRONMENTAL CONDITIONS: PRECIPITATION AND <br />TEMPERATURE O O <br />WPS FOLLOWED: SETTINGS ON WELDING EQUIPMENT O O <br />WPS FOLLOWED: TRAVEL SPEED O O <br />WPS FOLLOWED: SELECTED WELDING MATERIALS O O <br />WPS FOLLOWED: SHIELDING GAS TYPE/FLOW RATE O O <br />WPS FOLLOWED: PREHEAT APPLIED O O <br />WPS FOLLOWED: INTERPOSES TEMPERATURE MAINTAINED <br />(MIN./MAX.)O O <br />WPS FOLLOWED: PROPER POSITION (F, V, H, OH)O O <br />WELDING TECHNIQUES: INTERPASS AND FINAL CLEANING O O <br />WELDING TECHNIQUES: EACH PASS WITHIN PROFILE LIMITATIONS O O <br />WELDING TECHNIQUES: EACH PASS MEETS QUALITY <br />REQUIREMENTS O O <br />REFERENCE AISC 360-16 TABLE N5.4-2 <br />O - OBSERVE THESE ITEMS ON A RANDOM BASIS. OPERATIONS NEED NOT BE DELAYED PENDING THESE INSPECTIONS. <br />P - PERFORM THESE TASKS FOR EACH WELDED JOINT OF MEMBER <br />PLACEMENT AND INSTALLATION OF STEEL HEADED <br />STUD ANCHORS P P <br />INSPECTION TASKS AFTER WELDING <br />INSPECTION TASKS AFTER WELDING QUALITY CONTROL QUALITY ASSURANCE <br />WELDS CLEANED O O <br />SIZE, LENGTH AND LOCATION OF WELDS P P <br />WELDS MEET VISUAL ACCEPTANCE CRITERIA: CRACK PROHIBITION P P <br />WELDS MEET VISUAL ACCEPTANCE CRITERIA: WELD/BASE-METAL <br />FUSION P P <br />WELDS MEET VISUAL ACCEPTANCE CRITERIA: CRATER CROSS <br />SECTION P P <br />WELDS MEET VISUAL ACCEPTANCE CRITERIA: WELD PROFILES P P <br />WELDS MEET VISUAL ACCEPTANCE CRITERIA: WELD SIZE P P <br />WELDS MEET VISUAL ACCEPTANCE CRITERIA: UNDERCUT P P <br />WELDS MEET VISUAL ACCEPTANCE CRITERIA: POROSITY P P <br />ARC STRIKES P P <br />K-AREA1 P P <br />BACKING REMOVED AND WELD TABS REMOVED (IF REQUIRED)P P <br />REPAIR ACTIVITIES P P <br />DOCUMENT ACCEPTANCE OR REJECTION OF WELDED JOINT OR <br />MEMBER P P <br />REFERENCE AISC 360-16 TABLE N5.4-3 <br />1 WHEN WELDING OF DOUBLER PLATES, CONTINUITY PLATES OR STIFFENERS HAS BEEN PERFORMED IN THE K-AREA, <br />VISUALLY INSPECT THE WEB K-AREA FOR CRACKS WITHIN 3 IN. (75 MM) THE WELD <br />O - OBSERVE THESE ITEMS ON A RANDOM BASIS. OPERATIONS NEED NOT BE DELAYED PENDING THESE INSPECTIONS. <br />P - PERFORM THESE TASKS FOR EACH WELDED JOINT OF MEMBER <br />INSPECTION TASKS PRIOR TO BOLTING <br />INSPECTION TASKS PRIOR TO BOLTING QUALITY CONTROL QUALITY ASSURANCE <br />MANUFACTURER'S CERTIFICATIONS AVAILABLE FOR FASTENER <br />MATERIALS O P <br />FASTENERS MARKED IN ACCORDANCE WITH ASTM REQUIREMENTS O O <br />PROPER FASTENERS SELECTED FOR THE JOINT DETAIL (GRADE, <br />TYPE, BLOT LENGTH IF THREADS ARE TO BE EXCLUDED FROM <br />SHEAR PLANE) <br />O O <br />PROPER BOLTING PROCEDURE SELECTED FOR JOINT DETAIL O O <br />CONNECTING ELEMENTS, INCLUDING THE APPROPRIATE FAYING <br />SURFACE CONDITION AND HOLE PREPARATION, IF SPECIFIED, <br />MEET APPLICABLE REQUIREMENTS <br />O O <br />PRE-INSTALLATION VERIFICATION TESTING BY INSTALLATION <br />PERSONNEL OBSERVED AND DOCUMENTED FOR FASTENER <br />ASSEMBLIES AND METHODS USED <br />P O <br />PROPER STORAGE PROVIDED FOR BOLTS, NUTS, WASHERS AND <br />OTHER FASTENER COMPONENTS O O <br />REFERENCE AISC 360-16 TABLE N5.6-1 <br />O - OBSERVE THESE ITEMS ON A RANDOM BASIS. OPERATIONS NEED NOT BE DELAYED PENDING THESE INSPECTIONS. <br />P - PERFORM THESE TASKS FOR EACH BOLTED CONNECTION <br />INSPECTION TASKS DURING BOLTING <br />INSPECTION TASKS DURING BOLTING <br />QUALITY <br />CONTROL <br />QUALITY <br />ASSURANCE <br />FASTENER ASSEMBLIES, OF SUITABLE CONDITION, PLACED IN ALL <br />HOLES AND WASHERS (IF REQUIRED) ARE POSITIONED AS <br />REQUIRED <br />O O <br />JOINT BROUGHT TO THE SNUG-TIGHT CONDITION PRIOR TO THE <br />PRETENSIONING OPERATION O O <br />FASTENER COMPONENT NOT TURNED BY THE WRENCH <br />PREVENTED FROM ROTATING O O <br />FASTENERS ARE PRETENSIONED IN ACCORDANCE WITH THE RCSC <br />SPECIFICATION, PROGRESSING SYSTEMATICALLY FROM THE MOST <br />RIGID POINT TOWARD THE FREE EDGES <br />O O <br />REFERENCE AISC 360-16 TABLE N5.6-2 <br />O - OBSERVE THESE ITEMS ON A RANDOM BASIS. OPERATIONS NEED NOT BE DELAYED PENDING THESE <br />INSPECTIONS. <br />P - PERFORM THESE TASKS FOR EACH BOLTED CONNECTION <br />SF-1 SURVEY OF FLAT PLATE OR FLAT SLAB CONCRETE FLOORS <br />A. SUBMIT A SURVEYING PLAN FOR INFORMATION 30 DAYS PRIOR TO THE START OF THE FIRST FLAT <br />PLATE/SLAB FLOOR CONSTRUCTION. <br />B. SUBMIT ELEVATION SURVEYS FOR RECORD AT FLOORS L1 THROUGH L7 IMMEDIATELY <br />UPON COMPLETION OF SURVEYS AT THE FOLLOWING STAGES. ALL SURVEYS ARE <br />TO THE BOTTOM OF THE SLAB: <br />1. PRIOR TO THE PLACEMENT OF CONCRETE <br />2. WITHIN ONE DAY OF PLACEMENT <br />3. AT STRIPPING OF SHORING, PRIOR TO INSTALLATION OF RESHORING <br />4. IMMEDIATELY AFTER ALL RESHORING HAS BEEN REMOVED FROM ABOVE AND BELOW THE SLAB <br />C. PROVIDE ELEVATION SURVEYS AT ADDITIONAL FLOORS BASED ON THE DESIGN TEAM’S <br />EVALUATION OF THE INITIAL SURVEY RESULTS. <br />D. FOR EACH SURVEY PROVIDE MEASUREMENTS AT THE FOLLOWING POINTS: <br />1. EACH COLUMN <br />2. EACH WALL AT INTERSECTION WITH COLUMN LINES <br />3. EACH POINT DESIGNATED BY DRAWINGS WITH A CAMBER <br />4. ALONG THE PERIMETER, MIDSPAN OF EACH BAY <br />5. ALONG THE GRID LINES, MIDSPAN OF EACH BAY <br />6. CENTER OF EACH BAY <br />E. BASED ON THE REVIEW OF SURVEY RESULTS, THE SER MAY MODIFY DESIGN CAMBER <br />VALUES AND/OR COMMENT ON CONSTRUCTION METHODS (RESHORING, SEQUENCING, ETC.) <br />INSPECTION AFTER BOLTING <br />INSPECTION TASKS AFTER BOLTING QUALITY <br />CONTROL <br />QUALITY <br />ASSURANCE <br />DOCUMENT ACCEPTANCE OR REJECTION OF BOLTED CONNECTIONS P P <br />REFERENCE AISC 360-16 TABLE N5.6-3 <br />O - OBSERVE THESE ITEMS ON A RANDOM BASIS. OPERATIONS NEED NOT BE DELAYED PENDING THESE <br />INSPECTIONS. <br />P - PERFORM THESE TASKS FOR EACH BOLTED CONNECTION <br />REQUIRED VERIFICATION OF STEEL CONSTRUCTION <br />OTHER THAN STRUCTURAL STEEL <br />VERIFICATION AND INSPECTION TASK CONTINUOUS <br />1.MATERIAL VERIFICATION OF COLD-FORMED STEEL DECK: <br />PERIODIC <br />2. <br />A.IDENTIFICATION MARKINGS TO CONFORM TO ASTM <br />STANDARDS SPECIFIED IN THE APPROVED <br />CONSTRUCTION DOCUMENTS <br />1. <br />B.MANUFACTURER'S CERTIFIED TEST REPORTS <br />REFERENCED <br />STANDARD <br />APPLICABLE <br />ASTM <br />MATERIAL <br />STANDARDS <br />— X <br />— X <br />A. <br />FLOOR AND ROOF DECK WELDS <br />COLD-FORMED STEEL DECK: <br />B. REINFORCING STEEL: <br />1.VERIFICATION OF WELDABILITY OF <br />REINFORCING STEEL OTHER THAN ASTM A706 <br />2.REINFORCING STEEL RESISTING FLEXURAL AND <br />AXIAL FORCES IN INTERMEDIATE AND SPECIAL <br />MOMENT FRAMES, AND BOUNDARY ELEMENTS <br />OF SPECIAL STRUCTURAL WALLS OF CONCRETE <br />AND SHEAR REINFORCEMENT <br />3.SHEAR REINFORCEMENT <br />4.OTHER REINFORCING STEEL <br />AWS D1.3 <br />AWS D1.4, <br />ACI 318: <br />CBC SECTION <br />3.5.2 <br />— X <br />— X <br />— X <br />—X <br />—X <br />INSPECTION OF WELDING: <br />STRUCTURAL OBSERVATION LIST <br />OBSERVATION TASK FLOOR <br />1 SITE WORK AND EXCAVATION IN PREPARATION FOR REBAR PLACEMENT P01 <br />ELEVATOR PIT REINFORCEMENT <br />P013 <br />P014 <br />P01 CORE, SHEAR WALL AND COLUMNS P015 <br />L16 <br />L1 SLAB (MILD REINFORCED)L1 <br />SO_STRUCTURAL OBSERVATION <br />SO-1)THE FOLLOWING LIST INDICATES THE SPECIFIC STRUCTURAL OBSERVATION ITEMS <br />THAT WILL BE OBSERVED ON-SITE: <br />7 <br />L18 <br />L2 SLAB (POST-TENSIONED)L29 <br />L610 <br />11 <br />12 <br />2 P01 <br />FOUNDATION MAT POURS <br />P01 BASEMENT WALL LIFT <br />CONTINUOUS FOOTING AND SPREAD FOOTING REINFORCEMENT <br />L1 CORE, SHEAR WALL AND COLUMNS <br />L6 SLAB (POST-TENSIONED) <br />L6+ SLAB (POST-TENSIONED) <br />L7 <br />SO-2)GENERAL CONTRACTOR SHALL NOTIFY SEOR OF PROJECT MILESTONES IN WRITING A <br />MINIMUM OF 72 HOURS PRIOR TO CONCRETE PLACEMENT TO COORDINATE A STRUCTURAL SITE <br />OBSERVATION. <br />L6+ <br />L7 SLAB (POST-TENSIONED & MILD REINFORCED) <br />13 <br />14 <br />L8 (POST-TENSIONED) <br />L8 CORE AND COLUMNS <br />L15 <br />ROOF <br />15 L15 SLAB (POST-TENSIONED) <br />16 ROOF SLAB (POST-TENSIONED) <br />L8 <br />L8 <br />C <br />REQUIRED VERIFICATION AND INSPECTION OF SPRAY <br />FIRE-RESISTANT MATERIALS <br />VERIFICATION AND INSPECTION TASK CONTINUOUS <br />STRUCTURAL MEMBER SURFACE CONDITIONS <br />PERIODIC REFERENCED <br />STANDARD <br />— X <br />— X <br />SUBSTRATE AMBIENT TEMPERATURE BEFORE <br />AND AFTER APPLICATION <br />THICKNESS OF SPRAYED FIRE-RESISTANT <br />MATERIALS APPLIED TO FLOOR, ROOF AND WALL <br />ASSEMBLIES, CELLULAR DECKS, FLUTED DECKS, <br />STRUCTURAL MEMBERS, BEAMS AND GIRDERS, <br />JOISTS AND TRUSSES, WIDE-FLANGED COLUMNS, <br />HOSSOW STRUCTURAL SECTION AND PIPES <br />DENSITY OF SPRAYED FIRE-RESISTANT MATERIAL <br />BOND STRENGTH <br />CBC <br />REFERENCE <br />—X <br />—X <br />—X <br />— <br />— <br />— <br />ASTM E605 <br />ASTM E605 <br />1705.14.2 <br />1705.14.3 <br />1705.14.4 <br />1705.14.5 <br />1705.14.6 <br />T: F: <br />© Gensler <br />Date Description <br />Project Name <br />Project Number <br />Description <br />Scale <br />Seal / Signature <br />2021 <br />Tel 949.863.9434 <br />Fax 949-553-1676 <br />4675 MacArthur Court <br />Suite 100 <br />Newport Beach, CA <br />92600 <br />USA <br />301 N. Broadway, Santa Ana, CA <br />707 Wilshire Blvd, Suite 4450 <br />Los Angeles, CA 90017-3618 <br />Thornton Tomasetti, Inc. <br />213.330.7700 213.330.7001 <br />3RD & BROADWAY - <br />RESIDENTIAL <br />As indicated <br />11/19/2024 3:20:22 PM <br />R1.S0.09 <br />SPECIAL INSPECTIONS AND <br />STRUCTURAL TESTING <br />S21043.00 <br />1 12.10.2021 REISSUE FOR PLAN CHECK <br />A 06.10.2022 REISSUE FOR PLAN CHECK <br />1/7/25