My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1900 E Deere Ave - Plan
PBA
>
Building
>
ProjectDox
>
D
>
Deere Ave
>
1900 E Deere Ave
>
1900 E Deere Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2026 5:00:13 AM
Creation date
3/11/2026 5:00:06 AM
Metadata
Fields
Template:
Plan
Permit Number
20187494
101125872
Full Address
1900 E Deere Ave
Street Number
1900
Street Direction
E
Street Name
Deere
Street Suffix
Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(N) EVSE-1 <br />EVDP-1 <br />17, 19 <br />EVDP-1 <br />13, 15 <br />EVDP-1 <br />9, 11 <br />EVDP-1 <br />5, 7 <br />EVDP-1 <br />1, 3 (N) EVSE-2 <br />(N) EVSE-3 <br />(N) EVSE-4 <br />(N) EVSE-5 <br />EVDP-1 <br />21, 23 <br />(N) EVSE-6 <br />(E) MAIN SECTION CH2-1 <br />UNUSED SERVICE <br />DISCONNECT GARAGE <br />ENTRANCE/EXIT <br />(N) T-EVDP-1 <br />(N) EVDP-1 <br />(N) MNB-1 <br />M <br />(N) EVDP-1 SUBMETER <br />(E) UTILITY <br />TRANSFORMER <br />(N) 4" DIAMETER BOLLARD <br />(E) COLUMN (TYP.) <br />(E) FENCE (TYP.) <br />(N) 4" DIAMETER BOLLARD <br />EVDP-1 <br />30 <br />(E) RACKING TO REMAIN <br />(E) RACKING TO REMAIN <br />(E) FENCE (TYP.) <br />PARKING SPACE IS <br />11' x 24' (TYP.) <br />2" YELLOW SUPERIOR MARK <br />FLOOR MARKING TAPE (TYP.) <br />(N) 4" DIAMETER BOLLARD <br />EV PEDESTAL <br />EV PEDESTAL (TYP. FOR EVSE-1 <br />THROUGH EVSE-5) <br />(E) COMM ROOM <br />2" YELLOW SUPERIOR MARK <br />FLOOR MARKING TAPE (TYP.) <br />(E) OFFICE <br />(E) RACKING TO REMAIN <br />(E) RACKING TO REMAIN <br />(N) STORAGE CABINET <br />(N) DS-T1 <br />1 <br />EV-03 <br />SANTA ANA EV BUILDING PLAN <br />3/32" = 1'-0" <br />GENERAL NOTES: <br />1.EVSE SHALL BE INSTALLED IN ACCORDANCE WITH <br />MANUFACTURER'S INSTALLATION INSTRUCTIONS. <br />2.MAINTAIN NEC CLEARANCES AROUND EVSE AND ELECTRICAL <br />EQUIPMENT. REMOVE AND OR RELOCATE EQUIPMENT AS <br />REQUIRED. <br />3.SEE SHEET EV-04 FOR SINGLE LINE DIAGRAM AND FEEDER <br />SCHEDULE. <br />4.FOR EV CHARGERS SEE DETAIL 2/EV-08 FOR 48A EVSE <br />DATASHEET. <br />5.EVSE VOLTAGE DROP SHALL BE 3% MAXIMUM FROM PANEL TO <br />EVSE. ELECTRICAL CONTRACTOR SHALL ADJUST CONDUIT <br />AND WIRE SIZES AS REQUIRED TO MAINTAIN VOLTAGE DROP. <br />6.COORDINATE EVSE LOCATIONS WITH RESTRIPING PLAN. <br />7.ALL PENETRATIONS THROUGH CONCRETE STRUCTURAL <br />FLOORING SHALL BE SCANNED WITH GROUND PENETRATING <br />RADAR (GPR). SUBMIT FINDINGS TO ENGINEER FOR <br />APPROVAL PRIOR TO PENETRATION. <br />8.THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, <br />ELEVATIONS, AND SITE CONDITIONS PRIOR TO THE START OF <br />CONSTRUCTION AND NOTIFY THE ENGINEERING IMMEDIATELY <br />OF ANY DISCREPANCIES OR INCONSISTENCIES. <br />9.FURNISH AND INSTALL STRIPPING FOR PARKING SPACES, <br />UTILIZE SUPERIOR MARK FLOOR MARKING TAPE. COORDINATE <br />EXACT DIMENSIONS AND LOCATIONS WITH RED BULL AND <br />ELECTRADA. <br />ELECTRICAL KEY NOTES: <br />1.MOUNT EVSE AND CABLE HOLSTER TO PEDESTAL. PEDESTAL <br />HEIGHT 65". SEE DETAIL 1/EV-10. <br />2.PROVIDE 1" CONDUIT WITH (1) UNSHIELDED CAT6A CABLE <br />BACK TO COMM ROOM. <br />3.CONTRACTOR SHALL PROVIDE BOLLARDS AS SHOWN FOR <br />EACH COMPONENT BEING PROTECTED AS PER DETAIL 1/EV-09. <br />SUBMIT DETAILS PRIOR TO INSTALLATION. <br />4.PROVIDE FOR DATA CONNECTION RUN BACK TO MNB. <br />5.EYEWASH STATION AND FORKLIFT CHARGER ARE CURRENTLY <br />EXISTING IN THIS LOCATION, AND ARE BEING RELOCATED <br />(LOCATION TO BE DETERMINED). <br /># <br />J: <br />\ <br />2 <br />0 <br />2 <br />4 <br />b <br />\ <br />2 <br />0 <br />2 <br />4 <br />- <br />0 <br />0 <br />6 <br />7 <br />. <br />1 <br />1 <br />- <br />r <br />e <br />d <br />_ <br />b <br />u <br />l <br />l <br />_ <br />e <br />l <br />e <br />c <br />t <br />r <br />a <br />d <br />a <br />_ <br />s <br />a <br />n <br />t <br />a <br />_ <br />a <br />n <br />a <br />\ <br />1 <br />0 <br />- <br />d <br />e <br />s <br />i <br />g <br />n <br />\ <br />D <br />r <br />a <br />w <br />i <br />n <br />g <br />s <br />\ <br />w <br />o <br />r <br />k <br />i <br />n <br />g <br />d <br />o <br />c <br />u <br />m <br />e <br />n <br />t <br />s <br />\ <br />S <br />H <br />E <br />E <br />T <br />S <br />\ <br />L <br />A <br /> <br />M <br />I <br />R <br />A <br />D <br />A <br />\ <br />E <br />L <br />E <br />C <br />T <br />R <br />I <br />C <br />A <br />L <br />\ <br />E <br />V <br />- <br />0 <br />3 <br />. <br />d <br />w <br />g <br /> <br /> <br />2 <br />0 <br />2 <br />6 <br />- <br />0 <br />1 <br />- <br />1 <br />4 <br />Project Title: <br />Drawing Title: <br />RevisionDateNo. <br />Date: <br />Drawn: <br />Checked: <br />Job No: <br />Scale: <br />Drawing No: <br />SHT:OF <br />BURNS ENGINEERING, INC. | 310-439-5643 <br />300 NORTH CONTINENTAL BLVD SUITE 540 <br />EL SEGUNDO, CA 90245 <br />10 <br />RED BULL <br />ELECTRADA <br />EV CHARGING <br />SANTA ANA <br />1900 EAST DEERE AVE, SANTA ANA, CA92705 <br />ADDRESS: <br />1 06/24/2025 CD30 <br />2 07/02/2025 CD90 <br />3 07/15/2025 ISSUE FOR PERMIT <br />4 01/14/2026 PLAN CHECK COMMENTS <br />EV SITE PLAN <br />1/14/2026 <br />AS NOTED <br />CS <br />IB <br />2024.0067.11 <br />EV-03 <br />EV <br />- <br />0 <br />3 <br />. <br />D <br />W <br />G <br />3 <br />N
The URL can be used to link to this page
Your browser does not support the video tag.