Laserfiche WebLink
R09R10R11R12R13R14R15R16R17 <br />RF <br />RG <br />RH <br />RJ <br />RK <br />RL <br />01 <br />R1.A3.101 <br />________________ <br />01 <br />R1.A3.102 <br />________________01 <br />R1.A3.105 <br />________________01 <br />R1.A3.106 <br />________________ <br />R07 <br />VESTIBULE <br />R03H09 <br />R08 <br />________________04 <br />R1.A6.107 <br />R11' <br />VESTIBULE <br />R03H11 <br />ELEVATOR <br />LOBBY <br />R03H10 <br />MEP ROOM <br />R03J10 <br />STAIR 01 <br />ELEVATOR <br />01 <br />ELEVATOR <br />02 <br />ELEVATOR <br />03 <br />STAIR 02 <br />R112 <br />PT10 <br />PT10 <br />PT10PT10 <br />STORAGE <br />R04G15 <br />VESTIBULE <br />R04H15 <br />FSAE <br />LOBBY <br />R04H14 <br />PT10 <br />8' - 0" <br />PT10 <br />8' - 0" <br />CF10 <br />CF10 <br />SHEET NOTES GENERAL NOTES KEY PLAN <br />NORTH <br />© Gensler <br />Date Description <br />Project Name <br />Project Number <br />Description <br />Scale <br />Seal / Signature <br />2021 <br />Tel 949.863.9434 <br />Fax 949-553-1676 <br />4675 MacArthur Court <br />Suite 100 <br />Newport Beach, CA <br />92600 <br />USA <br />1/8" = 1'-0" <br />9/23/2024 11:07:45 AM <br />BIM 360://007.3757.000 - Caribou Industries - 3rd & Broadway/3RD-B_ARCH_WEST_R20.rvt <br />R1.A1.203 <br />REFLECTED CEILING PLAN - LEVEL <br />03 <br />07.3757.400 <br />3rd & Broadway Residential <br />Tower Core & Shell <br />301 N. Broadway, Santa Ana, CA <br />SCALE:1/8" = 1'-0" <br />REFLECTED CEILING PLAN - LEVEL 031 <br />09/21/2021 Issue for Plan Check <br />A 12/10/2021 Reissue for Plan Check <br />E 06/10/2022 Reissue for Plan Check <br />H 06/17/2024 Revision to Permit <br />H <br />1 INTERIOR LAYOUTS ARE BY OTHERS AND <br />SHOWN FOR GENERAL SHELL/CORE <br />SYSTEMS COORDINATION ONLY. <br />2 REFER TO ELECTRICAL LIGHTING SHEETS <br />FOR LIGHTING FIXTURE PLACEMENT, <br />LIGHTING FIXTURE SCHEDULE AND <br />PHOTMETRICS. <br />3 TENANT SPACES TO MAINTIAIN 1FC FOR <br />EGRESS LIGHTING <br />1/7/25