Laserfiche WebLink
Laboratory Report O46480.12.13-R1 <br />OMG, Inc. <br />Date of Issuance: 03/26/2014 <br />Page 3 of 9 <br /> <br />T RIN ITY |ERD <br /> <br />MAIN: 80 Yesler Way, Suite 200 Seattle, WA 98104 P: (206) 467 -0054 F: (206) 267-0272 <br />EAST: 353 Christian Street, Unit 13 Oxford, CT 06478 P: (203) 262 -9245 F: (203) 262-9243 <br />LAB: 10 Mauney Court Columbia, SC 29201 P: (803) 988 -8133 F: (803) 988-8111 <br />HI: 735 Bishop Street, Suite 430 Honolulu, HI 96813 P: (808) 535 -3144 F: (808) 535-3147 TL-199 Certified <br /> <br />1. STATIC TENSILE LOADING: <br />1.1 Sample Preparation: <br />1.1.1 Five specimens were prepared for each membrane type. The OMG PowerGrip Plus was secured to <br />dimensional lumber using eight (8) OMG #14 HD screws at equidistant pre-punched locations at the <br />perimeter of the 10.5-inch diameter coated metal plate. <br />1.2 Procedure: <br />1.2.1 The test specimen is secured in the tensile testing machine. Load is applied to the PowerGrip Plus <br />mount (threaded rod) at a vertical deflection rate of 2 in per min and the peak load at failure is <br />recorded. <br />1.3 Results: <br />TABLE 1A: STATIC TENSILE LOAD, SAMPLE “C” <br />Fastener Membrane <br />Test Data (lbf) <br />Specimen # Peak Load Ultimate Failure Mode <br />OMG PowerGrip™ <br />Plus “C” <br />1 2037 Membrane scrim coating delamination at center target weld <br />2 2092 Membrane scrim coating delamination at center target weld <br />3 2236 Membrane scrim coating delamination at center target weld <br />4 2098 Membrane scrim coating delamination at center target weld <br />5 2145 Membrane scrim coating delamination at center target weld <br />Results <br />Average: 2122 <br /> <br />St. Dev.: 75 <br />COV: 4% <br /> <br /> <br />33 <br />B