Laserfiche WebLink
*-SANTA <br />NA-ffi <br />Planning & Building Agency <br />Building Safety Dlvision <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(71/r) 647-s800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all seclions, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. lf answerinq NOtoanvof the questions, plan check shall be required. <br />Project Address:1140 S. TOWNER ST, SANTA ANA, CA 92707 <br />Contractor Company Name:SOUTHWEST SUN SOLAR, INC <br />contractorLicenseNumbei: 1004667 <br />YES NO <br />E tr1 <br />2 Etr <br />8D <br />tstr <br />Eltr <br />Etr <br />trtr <br />6 <br />7 <br />Are the following applicable to the proposed projecl? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />p€r Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roollng layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel lo lhe plane of the roof.) <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to l0" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feel <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stamped and signad by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />3 <br />4 <br />I <br />Etr <br />Etr <br />10. E El <br />I cerlify under penalty of periury undsr the laws of th <br />print Name: MlMl NGO <br />Phone Number: <br />"^u"^rti,e State of <br />Signature <br />Date:)/ <br />Email Address <br />Rev:8/17/2015 <br />PERMIT@SOUTHWESTSUNSOLAR,COM <br />the is true: <br />sol-01 GBC 2013 <br />8. <br />714 582 3909