Laserfiche WebLink
Planning & Building Agency <br />Building Safety Division <br />20 Civlc Centsr Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-5E00 <br />www.aanta-ana.o19 <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL-01 cBc 2016 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the len questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. lf answerinq NO to any of ths questions, plan chack shal! be rllquired. <br />Proj sct Address: 325 N FIGUEROA ST <br />Contractor Company |t|6mg; Vivint Solar <br />Contractor Licen5s Num6g7; 973756 <br />YES NO Are the following applicable to the proposed proiect? <br />Will the PV system layout provide th6 required three-foot wide clear accsss pathways <br />per Section 605.1 I of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overla)rs? <br />Will the PV anay be flush mounted to lhe existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV syslem be instialled where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2' minimum lo 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch <br />embedment inlo roof rafters (with pre{rilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a Califomia <br />licensed professional engineer? (including proiect specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacture/s PV support information.) <br />trtr <br />2 tr <br />3 Eu <br />trtrtrtr <br />trtr <br />Etr <br />4 <br />5 <br />6 <br />7 <br />8 tr <br />I EID <br />10. B fl <br />I certify under penalty of perjury under the laws of the State of California that the <br />print Name. Kayla Horta Signature: <br />phone Number: 951 -496-2292 <br />Email Address: kayla.horta@surrun.qom <br />Rev 8/29/19 <br />gag. 12117120 <br />is lrue: <br />l\