Laserfiche WebLink
Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, C492702 <br />(714) 647-5800 <br />www.santa.ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL-o1 cBc 2016 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all seclions, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 1'1" x 17" size. lf answerinq NO to anv of the questions, plan check shall be required. <br />L lf! u <br />2 <br />3 <br />4 <br />6 <br />7 <br />Proj ect Address: 721 N. Linwood Ave. Santa Ana, CA 92701 <br />Contractor Company p".". Semper Solaris <br />Contractor License Number: 978152 B, C'10, C46 <br />YES NO Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.1 'l of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overiays? <br />Will the PV anay be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV syslem be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />trtr <br />trtr <br />8 <br />I <br />10 trtr <br />Will the PV system be installed without using any ballast system or counter-weighl <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/'16" lag screws be installed with a minimum ot 2-112inch <br />embedment into roof raflers (with pre-drilled holes) and ls this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />I certify under penalty of periury under the laws of the State of Ca rnia that <br />phone Number: 714-404-5063 Date 0211712021 <br />Email Address: sa nto.a nd rews@sempersolaris.com <br />trtr <br />Etrtrtr <br />trtr <br />Btr <br />tr <br />tr <br />X <br />Revr 8/29i 19 <br />he above is true <br />print Name: Santo Andrews Signature: