Laserfiche WebLink
Plan ning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA92702 <br />(71/r) 647-5800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIG <br />CHECKLIST <br />sol-01 cBC 2016 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11"x17" size. lf answerinq NO to any of the questions, olan check shall be required. <br />Project Address:'11'19 W Berkely St, Santa Ana CA 92707 <br />Contractor Company Name: <br />Contractor License Number <br />Solar Discount Group <br />1039520 <br />YES NO Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.1 1 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV anay be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the undersrde of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a Califomia <br />licensed professional engineer? (including prqect specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />1 trtr <br />2 trtr <br />3 ntr <br />4 trtr <br />Eltr <br />6 EE <br />7 tru <br />8 trtr <br />I Etr <br />10 ntr <br />I certify under penalty of periury under the laws of the State <br />:T'.print Name: Chris Chavez Signatu <br />PhoneNumber: 310-488-2148 <br />, solardiscountqroup@gmail.comEmarl Address: <br />Rev 8/29/19 <br />Date 1-26-21 <br />above e