|
STUD AT JAMB, S. S. 4/ S6.0-2
<br />CONT. SEALANT AND
<br />BACKER ROD
<br />5/8" GYPSUM BD, PTD.
<br />CORNER BEAD, PTD.
<br />5/8" GYPSUM BD, PTD.
<br />THRESHOLD W/ MITERED RETURN
<br />DOOR & HARDWARE, SEE
<br />DOOR SCHEDULE
<br />2"
<br />4
<br />1
<br />/
<br />2
<br />"
<br />ALIGN
<br />PARTITION AS
<br />SCHEDULED, SEE PLANS
<br />FOR WALL TYPE
<br />PARTITION AS SCHEDULED,
<br />SEE PLAN FOR WALL TYPE
<br />ROOM INSIDE
<br />ROOM OUTSIDE
<br />FOR WALL THICKNESS,
<br />SEE FLOOR PLANS FOR
<br />TYPE & PARTITION
<br />SCHEDULE FOR
<br />ASSEBLY
<br />STUD AT JAMB, S. S. 4/
<br />S6.0-2
<br />DOOR FRAME.
<br />PAINTED
<br />SEE DOOR SCHEDULE
<br />FOR DOOR TYPE AND
<br />HARDWARE
<br />INSULATION, WHERE
<br />OCCURS
<br />1"
<br />1 1/2"
<br />1 1/2"
<br />1"
<br />FOR WALL THICKNESS,
<br />SEE FLOOR PLANS FOR
<br />TYPE & PARTITION
<br />SCHEDULE FOR
<br />ASSEBLY
<br />STUD AT HEADER, S. S. 2/
<br />S6.0-2
<br />DOOR FRAME.
<br />PAINTED
<br />SEE DOOR SCHEDULE
<br />FOR DOOR TYPE AND
<br />HARDWARE
<br />INSULATION, WHERE
<br />OCCURS
<br />1"
<br />1
<br />1
<br />/
<br />2
<br />"
<br />FLOOR TRANSITION AT CENTER OF DOOR
<br />1. FLOOR TRANSITION/ THRESHOLD= MAX. 1:2 RISE:RUN, TYP.
<br />2. SEE A9.2-1 FOR ADDITIONAL INFO ON FLOOR TRANSITIONS
<br />3. WHERE THERE IS NO CHANGE IN FINISH, NO THRESHOLD IS REQUIRED.
<br />DOOR JAMB MULLION
<br />BEYOND
<br />DOOR & HARDWARE,
<br />SEE DOOR SCHEDULE
<br />FLOOR FINISH, SEE
<br />FINISH PLAN &
<br />SCHEDULE, TRANSITION
<br />AT CL OF DOOR, UNLESS
<br />OTHERWISE NOTED
<br />DOOR THRESHOLD
<br />W/ MITERED
<br />RETURN, WHERE
<br />OCCURS
<br />PARTITION EDGE
<br />BEYOND, SEE PLANS
<br />FOR WALL TYPE
<br />3/4"1/2"3/4"
<br /> P
<br />E
<br />R
<br />
<br />S
<br />P
<br />E
<br />C
<br />S
<br />.
<br />UN
<br />D
<br />E
<br />R
<br />C
<br />U
<br />T
<br />STUD AT HEADER, S. S.
<br />2/ S6.0-2
<br />INT. DOOR HEAD
<br />MULLION
<br />CONT. SEALANT AND
<br />BACKER ROD, TYP.
<br />5/8" GYPSUM BD, PTD.
<br />CORNER BEAD, PTD.
<br />INSULATION, WHERE
<br />OCCURS, SEE WALL
<br />TYPE
<br />PARTITION AS
<br />SCHEDULED, SEE PLAN
<br />FOR WALL TYPE
<br />GLAZING, SEE DOOR
<br />SCHEDULE
<br />ROOM INSIDEROOM OUTSIDE
<br />AL
<br />I
<br />G
<br />N
<br />2"
<br />4 1/2"
<br />DOOR JAMB MULLION
<br />BEYOND
<br />DOOR, SEE SCHEDULE
<br />PARTITION EDGE
<br />BEYOND, SEE PLAN
<br />FOR WALL TYPE
<br />FLOOR TRANSITION AT CENTER OF DOOR
<br />5 1/4"2"
<br />1. FLOOR TRANSITION/ THRESHOLD= MAX. 1:2 RISE:RUN, TYP.
<br />2. SEE A9.2-1 FOR ADDITIONAL INFO ON FLOOR TRANSITIONS
<br />FLOOR FINISH, SEE
<br />FINISH PLAN &
<br />SCHEDULE,
<br />TRANSITION AT CL OF
<br />DOOR, UNLESS
<br />OTHERWISE NOTED
<br />DOOR THRESHOLD W/
<br />MITERED RETURN,
<br />WHERE OCCURS
<br />0' - 0 1/2" MIN.
<br />1/
<br />4
<br />"
<br />
<br />M
<br />A
<br />X
<br />.
<br />1/2" MIN.
<br />1/
<br />4
<br />"
<br />
<br />M
<br />A
<br />X
<br />.
<br />GLAZING, SEE DOOR
<br />SCHEDULE
<br />WALL STUD DEPTH X 25 GA. MET.
<br />STUDS 16" O.C.
<br />STUD AT HEADER, S. S. 2/ S6.0-2
<br />5/8" GYP. BD., PTD.
<br />ALUM. SNAP-ON CASING
<br />ALUM. DOOR FRAME
<br />DOOR, SEE SCHEDULE
<br />DOOR STOP
<br />INSULATION, WHERE
<br />OCCURS
<br />STUD AT JAMB, S. S. 4/ S6.0-2
<br />INSULATION PER PARTITION
<br />SCHEDULE
<br />GYP. BD., PTD.
<br />PARTITION AS SCHEDULED
<br />ALUM. SNAP-ON CASING
<br />ALUM. DOOR FRAME W/ DOOR
<br />STOP
<br />DOOR, SEE SCHEDULE
<br />1 1/2"
<br />DOOR, SEE SCHEDULE
<br />ALUM. DOOR FRAME W/ DOOR STOP
<br />ALUM. SNAP-ON CASING
<br />STUD AT JAMB, S. S. 4/ S6.0-2
<br />INSULATION PER PARTITION
<br />SCHEDULE
<br />GYP. BD., PTD.
<br />STUD DEPTH X 25 GA. STUDS
<br />@ 16" O.C.
<br />1 1/2"
<br />1. FLOOR TRANSITION/ THRESHOLD= MAX. 1:2 RISE:RUN, TYP.
<br />2. SEE A9.0-6 FOR ADDITIONAL INFO ON FLOOR TRANSITIONS
<br />3. WHERE THERE IS NO CHANGE IN FINISH, NO THRESHOLD IS REQUIRED.
<br />DOOR JAMB MULLION BEYOND
<br />DOOR, SEE SCHEDULE
<br />FLOOR FINISH, SEE FINISH PLAN &
<br />SCHEDULE, TRANSITION AT CL OF
<br />DOOR, UNLESS OTHERWISE NOTED
<br />DOOR THRESHOLD W/ MITERED
<br />RETURN, WHERE OCCURS.
<br />FLOOR TRANSITION AT CENTER OF DOOR
<br />3/4"3/4"3/4"
<br />1/
<br />2
<br />"
<br />
<br />M
<br />A
<br />X
<br />.
<br />4 1/2"
<br />DOOR, SEE SCHEDULE
<br />ALUM. DOOR FRAME W/ DOOR STOP
<br />ALUM. SNAP-ON CASING
<br />STUD AT JAMB, S. S. 4/ S6.0-2
<br />INSULATION PER PARTITION
<br />SCHEDULE
<br />GYP. BD., PTD.
<br />STUD DEPTH X 25 GA. STUDS
<br />@ 16" O.C.
<br />STUD AT JAMB, S. S. 4/ S6.0-2
<br />INSULATION PER PARTITION
<br />SCHEDULE
<br />GYP. BD., PTD.
<br />PARTITION AS SCHEDULED
<br />ALUM. SNAP-ON CASING
<br />ALUM. DOOR FRAME W/ DOOR
<br />STOP
<br />DOOR, SEE SCHEDULE
<br />ST
<br />09-30-2027
<br />O
<br />ARCHITECT
<br />FOFCALE
<br />REN.
<br />AT ARN
<br />NO.
<br />SE
<br />LICNE
<br />C-27893
<br />D
<br />T
<br />EC
<br />HIT
<br />ARC
<br />DAVID SCHNEE
<br />I
<br />U
<br />E
<br />I
<br />H
<br />U
<br />9
<br />AS.O
<br />A
<br />F R A N CN
<br />4 0 8 0
<br />H
<br />I
<br />N
<br />S
<br />L11
<br />AL
<br />E
<br />CR
<br />N D E N VA
<br />,N I N G
<br />CRAE
<br />TCEIT
<br />S C
<br />S
<br />N
<br />N
<br />G R O U P
<br />7
<br />S
<br />5 06
<br />C
<br />0718
<br />2
<br />P
<br />R
<br />A
<br />O
<br />90
<br />A
<br />EU
<br />C
<br />+
<br />ER
<br />4
<br />SHEET TITLE AND NO.
<br />SHEET NOTES
<br />ISSUE DATE
<br />PROJECT:
<br />CA REG.
<br />Project Arch.----
<br />----
<br />PERMIT SET 1ST ISSUANCE
<br />BID SET
<br />FINAL PERMIT/CONFORM SET
<br />09/29/2023
<br />04/30/2024
<br />08/02/2024
<br />22575-01
<br />26 CIVIC CENTER
<br />PLAZA
<br />SANTA ANA
<br />CA 92701
<br />SANTA ANA
<br />LIBRARY
<br />RENOVATION
<br />CITY OF SANTA ANA
<br />26 CIVIC CENTER PLAZA
<br />SANTA ANA, CA 92701
<br />REV # DESCRIPTION DATE
<br />1 BACKCHECK REV-1 03.01.2024
<br />2 CITY REVIEW REV-1 08.02.2024
<br />3 CITY REVIEW REV-2 10.18.2024
<br />4 CITY REVIEW REV-3 01.27.2025
<br />5 CITY REVIEW REV-4 04.07.2025
<br />6 CITY REVIEW REV-5 06.27.2025
<br />7 CITY REVIEW REV-6 10.24.2025
<br />8 CITY REVIEW REV-7 02.06.2026
<br /> REVIEWED FOR CONSTRUCTABILITY:
<br /> 80470
<br />SEAN THOMAS. P.E. RCE NO:
<br />PRINCIPAL CIVIL ENGINEER
<br />DATE:
<br />RECOMMENDED FOR CONSTRUCTION:
<br /> 62968
<br />JASON GABRIEL. P.E. RCE NO:
<br />PRINCIPAL CIVIL ENGINEER
<br />DATE:
<br />A9.1-1
<br />INTERIOR DETAILS
<br />- DOORS
<br /> 6" = 1'-0"08 IDR - INT. STOREFRONT DOOR JAMB @ GYP. WALL
<br /> 6" = 1'-0"04 IDR - HM. DOOR JAMB
<br /> 6" = 1'-0"02 IDR - HM. DOOR FRAME HEAD, TYP.
<br /> 6" = 1'-0"01 IDR - INT. DOOR THRESHOLD
<br /> 6" = 1'-0"06 IDR - INT. STOREFRONT DOOR HEAD
<br /> 6" = 1'-0"05 IDR - INT. STOREFRONT DOOR SILL
<br /> 6" = 1'-0"10 IDR - INT. WIN. DOOR HEAD
<br /> 6" = 1'-0"12 IDR - INT. WIN. DOOR JAMB STRIKE
<br /> 6" = 1'-0"16 IDR - INT. WIN. DOOR JAMB HINGE
<br /> 6" = 1'-0"09 IDR - INT. WIN. DOOR SILL
<br /> 6" = 1'-0"15 IDR - INT. WIN. DOOR JAMB HINGE AT STUD TRANSFER
<br /> 6" = 1'-0"14 IDR - INT. WIN. DOOR JAMB STRIKE AT STUD TRANSFER
<br />#349
<br />RFI
|