Laserfiche WebLink
1. ALL FIXTURES SHALL HAVE APPROPRIATE U.L. LABEL, DAMP, OR WET AS <br />REQUIRED BY LOCAL CODES. <br />2. ALL FIXTURES SHALL INCLUDE ALL ACCESSORIES FOR INSTALLATION <br />ACCORDING TO ALL CALIFORNIA ELECTRICAL CODES. <br />3. PRIOR TO ORDERING ANY LIGHTING EQUIPMENT, THE CONTRACTOR SHALL <br />VERIFY ALL LOCATIONS AND RECESS DEPTHS. <br />4. ALL LAMPS SHALL BE INSTALLED ACCORDING TO THE ATTACHED FIXTURE <br />SCHEDULE. <br />5. CONTRACTOR SHALL VERIFY FINAL VOLTAGES AND CEILING TRIM <br />COMPATIBILITY PRIOR TO ORDERING FIXTURES. <br />6. CEILING THICKNESS IN EXCESS OF 3/4" SHALL BE IDENTIFIED IN WRITING BY <br />CONTRACT. <br />7. PROVIDE APPROVED FIRE-RATED ENCLOSURES FOR ALL LIGHTING <br />FIXTURES LOCATED IN A FIRE-RATED CEILING. <br />8. WALLS DIRECTLY ILLUMINATED SHALL BE INSTALLED AND FINISHED IN A <br />MANNER TO ELIMINATE SHADOWS OR BLEMISHES (I.E. HANG DRY WALL <br />VERTICALLY). <br />9. ANY FIXTURE SUBSTITUTIONS MUST BE APPROVED BY THE ARCHITECT AND <br />OWNER'S REPRESENTATIVE PRIOR TO BID. CONTRACTOR MUST BE <br />PREPARED TO SUPPLY A SAMPLE AND/OR PHOTOMETRIC DATA IF <br />REQUESTED. <br />10. OUTDOOR LIGHTING FIXTURES THAT ARE USED TO ILLUMINATE A <br />PREMISES, ARCHITECTURAL FEATURE OR LANDSCAPE FEATURE ON <br />PRIVATE PROPERTY SHALL BE DIRECTED, SHIELDED, OR LOCATED IN SUCH A <br />MANNER THAT THE LIGHT SOURCE IS NOT VISIBLE OFFSITE, TO MINIMIZE <br />LIGHT EMISSION ABOVE THE HORIZONTAL PLANE AND SO THAT LIGHT DOES <br />NOT FALL ONTO SURROUNDING PROPERTIES OR CREATE GLARE HAZARDS <br />WITHIN PUBLIC RIGHTS-OF-WAY. <br />11. ALL EMERGENCY BATTERY PACKS SHALL BE FURNISHED WITH 90-MIN <br />MINIMUM BACK UP CAPABILITY AND PROVIDE NO LESS THAN 1/3 OF THE FULL <br />LUMEN OUTPUT OF ANY INDIVIDUAL LAMP. LED LIT, TEST SWITCHES TO BE <br />INTEGRAL TO FIXTURE, NOT REMOTE MOUNTED. CONTRACTOR SHALL <br />ENSURE THAT A MINIMUM OF 1-FOOTCANDLE IS PROVIDED AT FLOOR LEVEL <br />ALONG PATH OF EGRESS. <br />12. LIGHTING INSTALLED IN CORRIDORS AND STAIRWELLS SHALL BE <br />CONTROLLED BY OCCUPANT SENSING CONTROLS THAT SEPARATELY <br />REDUCE THE LIGHTING POWER BY AT LEAST 50% WHEN THE SPACE IS <br />UNOCCUPIED. <br />13. LIGHTING CONTROL DEVICES AND SYSTEMS, BALLASTS AND LUMINARIES <br />SHALL COMPLY TO 2022 CENC, SECTION 110.9. <br />14. SHADED FIXTURE INDICATES EGRESS FIXTURE WITH 90 MIN. BATTERY <br />BACKUP OR CONNECTED TO BUILDING LIGHTING INVERTER. <br />15. EXIT SIGNS SHALL BE INTERNALLY OR EXTERNALLY ILLUMINATED. (CBC <br />1013.3) <br />16. ELECTRICALLY POWERED EXIT SIGNS SHALL BE LISTED AND LABELED IN <br />ACCORDANCE WITH UL 924. (CBC SECTION 1013.5 <br />17. THE EMERGENCY POWER SYSTEM SHALL PROVIDE POWER FOR A <br />DURATION OF NOT LESS THAN 90 MINUTES AND SHALL CONSIST OF <br />STORAGE BATTERIES, UNIT EQUIPMENT OR AN ON-SITE GENERATOR. THE <br />INSTALLATION OF THE EMERGENCY POWER SYSTEM SHALL BE IN <br />ACCORDANCE WITH SECTION 2702. <br />I <br />U <br />E <br />I <br />H <br />U <br />9 <br />AS.O <br />A <br />FRANCN <br />4 0 8 0 <br />H <br />I <br />N <br />S <br />L11 <br />AL <br />E <br />CR <br />NDEN VA <br />,N I N G <br />CRAE <br />TCEI T <br />SC <br />S <br />N <br />N <br />G R O U P <br />7 <br />S <br />5 06 <br />C <br />07 18 <br />2 <br />P <br />R <br />A <br />O <br />90 <br />A <br />EU <br />C <br />+ <br />ER <br />4 <br />SHEET TITLE AND NO. <br />ISSUE DATE <br />PROJECT: <br />CA REG. <br />Project Arch.---- <br />---- <br />22575-01 <br />26 CIVIC CENTER <br />PLAZA <br />SANTA ANA <br />CA 92701 <br />SANTA ANA <br />LIBRARY <br />RENOVATION <br />CITY OF SANTA ANA <br />26 CIVIC CENTER PLAZA <br />SANTA ANA, CA 92701 <br />ELECTRICAL-PLMUMBING-MECHANICAL <br />1920 MAIN STREET, SUITE 820 <br />IRVINE, CA92614 <br />TEL: 949.516.6480 <br />BID SET <br />FINAL PERMIT/CONFORM <br />SET <br />04/30/2024 <br />08/02/2024 <br />E0.1-2 <br />NEW SINGLE <br />DIAGRAM <br />GENERAL NOTES <br />KEY NOTES <br />1 PROVIDE 36"X36"X24"D NEMA 3R PULLBOX. CONTRACTOR TO PROVIDE <br />IRRIVERSABLE SPLICE INSIDE NEW NEMA 3R PULLBOX TO EXTEND 480V, <br />600A, 3-PHASE, 3-WIRE SYSTEM TO NEW "MSA". <br />2 3000 PSI CONCRETE PAD, MINIMUM THICKNESS OF 4 INCHES OR <br />THICKNESS AS REQUIRED TO SUPPORT SWITCHBOARD. CONDUIT SLOT <br />WITHIN PAD SHALL BE PROVIDED TO ACCOMMODATE ALL FEEDERS. <br />3 PROVIDE BUILDING POWER SYSTEM GROUND BUS BAR, LOCATED <br />ADJACENT TO MAIN ELECTRICAL EQUIPMENT. <br />4 PROVIDE 1"C -1# 4/0 TO GROUND RODS. <br />5 NEW SWITCHBOARD WITH AUXILIARY CONTACT FOR ELEVATOR <br />SWITCHBOARD. <br />MS-A <br />600A, 480V, 3PHASE, 3W, 65kAIC <br />600A/3P <br />60A/3P <br />3P <br />2 <br />350A/3P <br />3P <br />3 <br />XFMR "T1" <br />225KVA <br />480V <br />208Y/120V <br />DISTRIBUTION BOARD "DB-2" <br />800A, 208Y/120V, 3PHASE, 4W, 25kAIC <br />800A/3P <br />100A/3P <br />3P <br />4 <br />F <br />40A FLA <br />30HP <br />70A/3P <br />3P <br />6 <br />F <br />VFD <br />AHU-B-1 <br />59.1 A = FLA <br />20A/3P <br />3P <br />5 <br />F <br />VFD <br />CHWP <br />1.1 <br />5 <br />15A/3P <br />3P <br />9 <br />F <br />VFD <br />HWP <br />1.2 <br />1 <br />SPARE <br />15A/3P <br />3P <br />10 SPARE <br />15A/3P <br />3P <br />15A/3P <br />3P 3P <br />SPARE <br />20A/3P <br />3P <br />15 <br />x2 SPACE <br />SPARE <br />30A/3P <br />3P <br />16 <br />175A <br />3P <br />1 <br />"LBA" <br />POWER <br />PNL <br />175A <br />3P <br />2 <br />"LBB" <br />POWER <br />PNL <br />200A <br />3P <br />3 <br />"LBL" <br />LTG <br />PNL <br />200A <br />3P <br />4 <br />"LBM" <br />MECH. <br />PNL <br />175A <br />3P <br />5 <br />"L1A" <br />POWER <br />PNL <br />175A <br />3P <br />6 <br />"L1B" <br />POWER <br />PNL <br />100A <br />3P <br />7 <br />"L1L" <br />LTG <br />PNL <br />175A <br />3P <br />8 <br />"L2A" <br />POWER <br />PNL <br />175A <br />3P <br />9 <br />"L2M" <br />POWER <br />PNL <br />100A <br />3P <br />10 <br />"L2L" <br />LTG <br />PNL <br />30A <br />3P <br />12 SPARE <br />175A <br />3P <br />13 SPARE <br />175A <br />3P <br />14 SPARE <br />125A <br />3P <br />15 <br />x2 SPACE <br />SPARE <br />100A <br />3P <br />16 <br />SECOND FLOOR <br />F <br />VFD <br />AHU-1_1 <br />6.6A = FLA <br />FIRST FLOOR <br />1 <br />600 A <br />600 A <br />3P <br />CLASS L <br />IN CITY HALL <br />CITY HALL ELECTRICAL SYSTEM <br />IN EXISTING LIBRARY <br />UNDERGROUND VAULT <br />(E) MAIN SWITCH SERVING <br />THE LIBRARY LOCATED <br />IN CITY HALL <br />(E) 5''C, 6#500MCM & 1 #3/0 GND <br />(E) (2-SETS)4''C, 3# <br />500MCM & 1 #3/0 GND <br />(2-SETS)4''C, 3#500MCM & 1 #3/0 GND <br />1''C - 1#4/0 <br />GROUND BUS BAR 3 <br />1''C - 1#4/0 CONCRETE ENCASED ELECTRODE (UFER GROUND) <br />1''C - 1#4/0 TO MAIN COLD WATER PIPE <br />4 <br />BASEMENT FLOOR <br />5 ELEV. <br />CONT <br />1''C - 1#3/0 GND <br />SPD <br />6 PROVIDE ARC FLASH AND COORDINATION STUDY. <br />6 <br />6 <br />7 SURGE PROTECTION. TVSS SHALL BE TYPE 1. <br />7 <br />8 PROVIDE FULL FUNCTION ELECTRONIC TRIP, 100% RATED CIRCUIT <br />BREAKER WITH RMS SENSING. FIELD REPLACEABLE ELECTRONIC TRIP <br />WITH COMMUNICATION PORT, AND THE FOLLOWING FIELD ADJUSTABLE <br />SETTINGS: <br /> a) LONG AND SHORT TIME PICKUP LEVELS. <br /> b) LONG AND SHORT TIME ADJUSTMENTS. <br />8 <br />8 <br />60A/3P <br />3P <br />F <br />34 FLA <br />25HP <br />(E) ELEV. <br />CONT <br />(E) <br />00 <br />0 <br />00 <br />1 <br />00 <br />2 <br />00 <br />3 <br />00 <br />4 <br />00 <br />5 <br />00 <br />8 <br />01 <br />0 <br />01 <br />1 <br />01 <br />2 <br />01 <br />3 <br />01 <br />4 <br />01 <br />5 <br />01 <br />6 <br />01 <br />7 <br />01 <br />8 <br />01 <br />9 <br />02 <br />0 <br />02 <br />1 <br />9 CONTRACTOR SHALL CHANGE CIRCUITING ON ELEVATOR CONTROLLER <br />FROM 240V, 3-PHASE TO 480V, 3-PHASE. IF ELEVATOR CONTRACTOR <br />DEEMS THIS NOT POSSIBLE ELECTRICAL CONTRACTOR SHALL PROVIDE <br />STEP-DOWN TRANSFORMER FOR ELEVATOR. COORDINATE EXACT <br />LOCATION AND SIZE OF STEP-DOWN TRANSFORMER IN THE FIELD WITH <br />ELEVATOR CONTRACTOR. <br />10 PROVIDE NEW 100AS/50AF 480V, 3-PHASE + GROUND FUSED DISCONNECT <br />SWITCH TO CONNECT EXISTING ELEVATOR CONTROLLER <br />11 PROVIDE PANELBOARD WITH PROVISION FOR FUTURE CIRCUIT BREAKER <br />MONITORING. <br />11 <br />11 <br />LSI <br />(N) PULLBOX 1 <br />(E) <br />10 <br />9 <br />ELEV #2 ELEV #1 <br />L= <br />1 <br />0 <br />5 <br />' <br /> <br />; <br /> <br />V <br />d <br />= <br />0 <br />. <br />3 <br />0 <br />% <br />L=400' ; Vd=0.78% <br />L= <br />5 <br />' <br /> <br />; <br /> <br />V <br />d <br />= <br />0 <br />. <br />0 <br />1 <br />% <br />L= <br />3 <br />5 <br />' <br /> <br />; <br /> <br />V <br />d <br />= <br />0 <br />. <br />0 <br />8 <br />% <br />L= <br />6 <br />0 <br />' <br /> <br />; <br /> <br />V <br />d <br />= <br />0 <br />. <br />2 <br />5 <br />% <br />L= <br />6 <br />0 <br />' <br /> <br />; <br /> <br />V <br />d <br />= <br />0 <br />. <br />0 <br />3 <br />% <br />L= <br />6 <br />0 <br />' <br /> <br />; <br /> <br />V <br />d <br />= <br />0 <br />. <br />0 <br />1 <br />% <br />L= <br />1 <br />1 <br />5 <br />' <br /> <br />; <br /> <br />V <br />d <br />= <br />0 <br />. <br />2 <br />2 <br />% <br />L= <br />1 <br />2 <br />0 <br />' <br /> <br />; <br /> <br />V <br />d <br />= <br />0 <br />. <br />0 <br />6 <br />% <br />L= <br />2 <br />5 <br />' <br /> <br />; <br /> <br />V <br />d <br />= <br />0 <br />. <br />1 <br />0 <br />% <br />L= <br />3 <br />5 <br />' <br /> <br />; <br /> <br />V <br />d <br />= <br />0 <br />. <br />2 <br />7 <br />% <br />L= <br />4 <br />0 <br />' <br /> <br />; <br /> <br />V <br />d <br />= <br />0 <br />. <br />1 <br />5 <br />% <br />L= <br />4 <br />5 <br />' <br /> <br />; <br /> <br />V <br />d <br />= <br />0 <br />. <br />1 <br />4 <br />% <br />L= <br />6 <br />0 <br />' <br /> <br />; <br /> <br />V <br />d <br />= <br />0 <br />. <br />1 <br />4 <br />% <br />L= <br />3 <br />0 <br />' <br /> <br />; <br /> <br />V <br />d <br />= <br />0 <br />. <br />1 <br />1 <br />% <br />L= <br />1 <br />1 <br />0 <br />' <br /> <br />; <br /> <br />V <br />d <br />= <br />0 <br />. <br />4 <br />0 <br />% <br />L= <br />1 <br />2 <br />0 <br />' <br /> <br />; <br /> <br />V <br />d <br />= <br />0 <br />. <br />3 <br />8 <br />% <br />L= <br />1 <br />3 <br />0 <br />' <br /> <br />; <br /> <br />V <br />d <br />= <br />0 <br />. <br />6 <br />8 <br />% <br />L= <br />1 <br />3 <br />0 <br />' <br /> <br />; <br /> <br />V <br />d <br />= <br />0 <br />. <br />6 <br />8 <br />% <br />L= <br />1 <br />3 <br />0 <br />' <br /> <br />; <br /> <br />V <br />d <br />= <br />0 <br />. <br />8 <br />2 <br />% <br />SPARE <br />20A/3 <br />3P <br />7 <br />F <br />VFD <br />CHWP <br />1.2 <br />5 <br />L= <br />6 <br />0 <br />' <br /> <br />; <br /> <br />V <br />d <br />= <br />0 <br />. <br />0 <br />3 <br />% <br />15A/3P <br />3P <br />8 <br />F <br />VFD <br />HWP <br />1.1 <br />1 <br />00 <br />7 <br />L= <br />6 <br />0 <br />' <br /> <br />; <br /> <br />V <br />d <br />= <br />0 <br />. <br />0 <br />1 <br />% <br />11 13 1412 <br />00 <br />6 <br />00 <br />9 <br />DRAWING LEGEND <br />EXISTING TO REMAIN <br />NEW SCOPE OF WORK <br />12 NO WORK TO BE COMPLETED IN THE CITY HALL. CITY HALL IS FOR THE <br />CONTRACTOR TO SAFE OFF/LOCK-OFF/TAG-OFF THE ELECTRICAL <br />SERVICE TO THE LIBRARY. <br />12 <br />INV-1 (LP) <br />LTG <br />PNL <br />13 PROVIDE MYERS 7.5kVA EMERGENCY POWER SYSTEMS ILLUMINATOR IE <br />EMERGENCY LIGHTING INVERTER SYSTEM, 208 -120V WITH 90 MIN <br />BATTERY BACKUP: 3-I-07-S-BA2015-S-T-Z-BAC-2YWT. <br />13 <br />INV-2 <br />13 <br />1"C - 1#4/0 TO TELECOM GROUND BUS BAR IN FIRST FLOOR IT ROOM <br />00 <br />#99 <br />RFI <br />REV # DESCRIPTION DATE <br />#99 RFI 03.21.2025 <br />#187 RFI 12.15.2025 <br />25A/3P <br />02 <br />3 <br />L= <br />8 <br />5 <br />' <br /> <br />; <br /> <br />V <br />d <br />= <br />0 <br />. <br />0 <br />6 <br />% <br />F <br />CU-B1-1 <br />16.6A = FLA <br />14 <br />#187 <br />RFI <br />14 PROVIDE NEW NEMA 3R, 30AS/25AF 480V, 3-PHASE + GROUND FUSED <br />DISCONNECT SWITCH TO SERVE NEW EXTERIOR CONDENSING UNIT. <br />#187 <br />RFI <br />#187 <br />RFI