Laserfiche WebLink
R.EDLI <br />I.IECHANICA <br />HE}\IING . VENTTLAIION . AIR CONDITIONING <br />lO !O, laagl . AflAH€Ol. CA liBl, <br />Test and Bolonce Analysis Report <br />Project: St Gertrude Dispensa4', <br />Address: 1327 E St Gertrude Pl, Sonto Ana <br />Sub Contractor; Redline lllechanical Inc <br />General Contractor: lllar Yista Construction <br />Mechanical Engineer: Kris K Sha <br />Certification: <br />Air distribution system has been completely balanced with the Alnor loFlo <br />Balam <br />listcd. <br />eter as per requirements of s d results of tc'sts herein <br />Approved by: <br />Date: 6.8. l6 <br />General Notes: <br />I ) All ceiling supply registers. retum grills, and exhaust grills were <br />tested with a volume flow balancer. <br />2) Code Type <br />CSD Ceiling Supply Diftuser <br />DNL Data Not Listed <br />CRR Ceiling Retum Register <br />ER Exhaust Register <br />OSA Outside Air <br />LR Linear Register <br />)I 1 <br />c <br />o <br />VAC <br />o <br />9 <br />(, <br />E <br />o fLc <br />Phone'.714.994.5800 Fax'.714.994.5806 <br />c20-sdo4t1