My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3800 3%4 S Fairview WCC02 - Plan
PBA
>
Building
>
ProjectDox
>
F
>
Fairview St
>
3800 3/4 S Fairview St Unit# WCC02
>
3800 3%4 S Fairview WCC02 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2026 5:00:09 AM
Creation date
4/14/2026 5:00:05 AM
Metadata
Fields
Template:
Plan
Permit Number
20188160
Full Address
3800 3/4 S Fairview St Unit# WCC02
Street Number
3800
Partial
3/4
Street Direction
S
Street Name
Fairview
Street Suffix
St
Unit Number
WCC02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1C4 <br />SHEET #:REVISION: <br />SHEET TITLE: <br />REV.DATE DESCRIPTION <br />ISSUED FOR CONSTRUCTION <br />REVISIONS <br />APPROVED BY: <br />CHECKED BY: <br />DRAWN BY: <br />CW <br />MEW <br />FIN <br />PROJECT INFORMATION: <br />IE82063A <br />3800 S. FAIRVIEW STREET <br />SANTA ANA, CA 92704 <br />THE INFORMATION CONTAINED IN THIS <br />SET OF DOCUMENTS IS PROPRIETARY BY <br />NATURE. ANY USE OR DISCLOSURE <br />OTHER THAN THAT WHICH RELATES TO <br />THE CLIENT IS STRICTLY PROHIBITED. <br />1200 CONCORD AVENUE <br />CONCORD, CA 94520 <br />PREPARED FOR: <br />RMobileT <br />0 07/14/25 <br />A&E FIRM: <br />1355 WINDWARD CONCOURSE, SUITE 410 <br />ALPHARETTA, GA 30005 <br />TEL: 678-990-2338 <br />ISSUED FOR CONSTRUCTION101/14/26 <br />BATTERY SPECS <br />NOTES: <br />1.BATTERY TERMINALS - ELECTRICAL CONNECTION BETWEEN CELLS ON SEPARATE <br />LEVELS OR RACKS SHALL NOT PUT MECHANICAL STRAIN ON THE BATTERY TERMINALS. <br />2.VENTS - EACH VENT CELL SHALL BE EQUIPPED WITH A FLAME ARRESTOR. <br />3.SEALED CELLS - WHERE A BATTERY IS CONSTRUCTED SUCH THAT EXCESSIVE <br />ACCUMULATION OF PRESSURE COULD OCCUR WITHIN THE CELL DURING OPERATION, A <br />PRESSURE RELIEF VENT SHALL BE PROVIDED. <br />4.VENTILATION - PROVISION APPROPRIATE TO THE BATTERY'S TECHNOLOGY SHALL BE <br />MADE FOR SUFFICIENT DIFFUSION AND VENTILATION AND GASSES FROM THE BATTERY, <br />IF PRESENT, TO PREVENT THE ACCUMULATION OF AN EXPLOSIVE MIXTURE. <br />01/14/26 <br />s<s<.J-b.J-b,,.a=,,.a=--------
The URL can be used to link to this page
Your browser does not support the video tag.