|
p r o j e c t d e s c r i p t i o n
<br />NEW SIGNAGE ON AN EXISTING 3-STORY MEDICAL OFFICE BUILDING
<br />v i c i n i t y m a p
<br />W MACARTHUR BLVD
<br />S
<br />H
<br />A
<br />R
<br />B
<br />O
<br />R
<br />
<br />B
<br />L
<br />V
<br />D
<br />W MOORE AVE
<br />W GARRY AVE
<br />S
<br />C
<br />R
<br />O
<br />D
<br />D
<br />Y
<br />
<br />W
<br />A
<br />Y
<br />S
<br />S
<br />H
<br />A
<br />N
<br />N
<br />O
<br />N
<br />
<br />S
<br />T
<br />PROJECT
<br />SITE
<br />p r o j e c t d a t a
<br />PROJECT ADDRESS:
<br />CONSTRUCTION TYPE:
<br />NUMBER OF STORIES:
<br />OCCUPANCY:
<br />BUILDING AREA:
<br />ASSESSOR'S PARCEL NUMBER:
<br />LEGAL DESCRIPTION:
<br />3401 SOUTH HARBOR BOULEVARD
<br />SANTA ANA, CA 92704
<br />TYPE II-A, FULLY SPRINKLERED
<br />3
<br />GROUP B - OFFICE
<br />BUILDING TOTAL AREA: 80,000 SF
<br />414-262-08
<br />P BK 38 LPG 13 PAR 2 P.M. 38-13, PAR.2 PRO OF PAR AND WILLIAMS
<br />0 5'
<br />GRAPHIC SCALES:
<br />Issue Date
<br />1/16" = 1'-0"
<br />50'
<br />1/8" = 1'-0" 1/4" = 1'-0" 1/2" = 1'-0" 3/4" = 1'-0" 1" = 1'-0"1-1/2" = 1'-0" 3" = 1'-0"
<br />0 5'25'0 1' 12'0 1' 6'0 4'0 3'1'0 2'0 1'
<br />Chckd By
<br />Drwn By
<br />Scale
<br />Building ID:
<br />KP Proj. No.
<br />Permit No.
<br />Sheet
<br />SheetsOf
<br />Sheet Title
<br />Project
<br />Facility
<br />This document is the property of the Owner and is
<br />Project Architect Approval:
<br />Architect/Engineer Of Record:
<br />IF THIS SHEET IS NOT 30"x42" , IT IS
<br />A REDUCED PRINT - SCALE ACCORDINGLY
<br />National Facilities Services
<br />Post Office Box 12916
<br />Oakland California 94604
<br />not to be used without owner's written permission.
<br />Floor Lev:Section:
<br />Revisions
<br />By Appr.
<br />HGW Proj. No.
<br />©
<br />H
<br />G
<br />W
<br />
<br />A
<br />r
<br />c
<br />h
<br />i
<br />t
<br />e
<br />c
<br />t
<br />u
<br />r
<br />e
<br />,
<br />
<br />a
<br />l
<br />l
<br />
<br />r
<br />i
<br />g
<br />h
<br />t
<br />s
<br />
<br />r
<br />e
<br />s
<br />e
<br />r
<br />v
<br />e
<br />d
<br />.
<br />
<br />
<br />A
<br />n
<br />y
<br />
<br />u
<br />s
<br />e
<br />
<br />w
<br />i
<br />t
<br />ho
<br />u
<br />t
<br />
<br />p
<br />e
<br />r
<br />m
<br />i
<br />s
<br />s
<br />i
<br />o
<br />n
<br />
<br />i
<br />s
<br />
<br />e
<br />x
<br />p
<br />r
<br />e
<br />s
<br />s
<br />l
<br />y
<br />
<br />p
<br />r
<br />o
<br />h
<br />i
<br />b
<br />i
<br />t
<br />e
<br />d
<br />.
<br />
<br />
<br />P
<br />l
<br />o
<br />t
<br />t
<br />e
<br />d
<br />1955 Bacon Street. San Diego, CA 92107
<br />Office 619 523 8487
<br />www.hgwarchitecture.com
<br />KAISER PERMANENTE
<br />BUILDINGS ON BRAND
<br />12" = 1'-0"
<br />3/
<br />1
<br />8
<br />/
<br />2
<br />0
<br />2
<br />6
<br />
<br />1
<br />1
<br />:
<br />0
<br />8
<br />:
<br />1
<br />5
<br />
<br />A
<br />M
<br />03/17/2026
<br />Checker
<br />Author
<br />CAP030942
<br />T001.
<br />TITLE SHEET
<br />3401 South Harbor Boulevard,
<br />Santa Ana, CA 92704
<br />pl
<br />a
<br />n
<br />
<br />c
<br />h
<br />e
<br />c
<br />k
<br />
<br />r
<br />e
<br />s
<br />u
<br />b
<br />m
<br />i
<br />t
<br />t
<br />a
<br />l
<br />2441
<br />EXTERIOR SIGNAGE - HARBOR-MAC
<br />ARTHUR
<br />i n d e xf i r e d e p t . n o t e s
<br />ALL REQUIRED PERMITS MUST BE OBTAINED FROM FIRE PLAN CHECK BEFORE THE BUILDING IS OCCUPIED.
<br />STANDPIPE SYSTEMS SHALL COMPLY WITH THE REQUIREMENTS OF CBC SEC. 905
<br />PLANS FOR AUTOMATIC FIRE SPRINKLER SYSTEMS & CLASS I STANDPIPES MUST BE SUBMITTED AND
<br />APPROVED BY FIRE PLAN CHECK BEFORE THIS EQUIPMENT IS INSTALLED.
<br />VALVES CONTROLLING THE WATER SUPPLY FOR AUTOMATIC SPRINKLER SYSTEMS, PUMPS, TANKS, WATER
<br />LEVELS AND TEMPERATURES, CRITICAL AIR PRESSURES AND WATERFLOW SWITCHES ON ALL SPRINKLER
<br />SYSTEMS SHALL BE ELECTRICALLY SUPERVISED BY A LISTED FIRE ALARM CONTROL UNIT. (CBC SEC. 903.4)
<br />AN APPROVED AUDIBLE SPRINKLER FLOW ALARM SHALL BE PROVIDED ON THE EXTERIOR OF THE BUILDING
<br />IN AN APPROVED LOCATION PER (CBC SEC. 903.4.2). AN APPROVED AUDIBLE SPRINKLER FLOW ALARM TO
<br />ALERT THE OCCUPANTS SHALL BE INSTALLED IN THE INTERIORS IN A NORMALLY OCCUPIED LOCATION PER
<br />(CBC SEC. 904.3.4)
<br />PROVIDE TEMPORARY OR PERMANENT WATER SUPPLY FOR FIRE PROTECTION AS SOON AS COMBUSTIBLE
<br />MATERIALS ARRIVE ON SITE, AS REQUIRED AND APPROVED BY CORRESPONDANT FIRE DEPARTMENT
<br />FIRE PROTECTION, INCLUDING FIRE APPARATUS ACCESS ROADS AND WATER SUPPLIES FOR FIRE
<br />PROTECTION, SHALL BE INSTALLED AND MADE SERVICEABLE PRIOR TO AND DURING TIME OF
<br />CONSTRUCTION. (CFC 501.4)
<br />BUILDINGS UNDERGOING CONSTRUCTION ALTERATION OR DEMOLITION SHALL BE IN ACCORDANCE WITH CFC
<br />CHAPTER 33; CBC CHAPTER 33.
<br />ADDRESSES SHALL BE PROVIDED FOR ALL NEW AND EXISTING BUILDINGS IN A POSITION AS TO BE PLAINLY
<br />VISIBLE AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY.
<br />DECORATIVE MATERIALS SHALL BE MAINTAINED IN A FLAME RETARDANT CONDITION. (CODE REGS. TIT. 19,
<br />SEC. 3.08, 3.21, CFC 807)
<br />AT LEAST ONE FIRE EXTINGUISHER WITH A MINIMUM RATING OF 2-A-10B:C SHALL BE PROVIDED WITHIN 75
<br />FEET MAXIMUM TRAVEL DISTANCE FOR EACH 6,000 S.F. OR PORTION THEREOF ON EACH FLOOR. (CFC 1002,
<br />UFC STANDARD 10-1, CAL. CODE REGS, TIT. 19, SEC. 3.29)
<br />AT LEAST ONE FIRE EXTINGUISHER WITH A MINIMUM RATING OF 2-A-10B:C SHALL BE PROVIDED WITHIN 75
<br />FEET MAXIMUM TRAVEL DISTANCE PER CALIFORNIA CODE OF REGULATIONS, TITLE 19, DIVISION 1, SECTION
<br />568, TABLE 2. (CFC 906.3)
<br />COMPLETE PLANS AND SPECIFICATIONS FOR ALL FIRE ALARM SYSTEMS, FIRE EXTINGUISHING SYSTEMS,
<br />INCLUDING AUTOMATIC SPRINKLERS AND WET DRY STANDPIPES, HALON SYSTEMS AND OTHER SPECIAL
<br />TYPES OF AUTOMATIC FIRE EXTINGUISHING SYSTEMS, BASEMENT PIPE INLETS AND OTHER FIRE PROTECTION
<br />SYSTEMS AND APPURTENANCES THERETO SHALL BE SUBMITTED TO FIRE AND SAFETY FOR REVIEW AND
<br />APPROVAL PRIOR TO INSTALLATION. (CFC 901.2)
<br />FIRE EXTINGUISHING SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH CBC SEC. 906 AND COMPLY
<br />WITH STANDARDS 9-1 AND 9-2.
<br />INSTALLATION OF FIRE ALARM SYSTEMS SHALL BE IN ACCORDANCE WITH CFC SEC. 907 WITH NOT LESS
<br />THAN ONE STANDPIPE FOR USE DURING CONSTRUCTION INSTALLED IN ACCORDANCE WITH CBC SEC. 3314
<br />COMPLETE SITE SAFETY PLANS AND SPECIFICATIONS AT THE PROJECT SITE APPLICABLE THROUGHOUT ALL
<br />PHASES OF THE CONSTRUCTION, REPAIR, ALTERATION OR DEMOLITION WORK SHALL BE SUBMITTED TO FIRE
<br />AND LIFE SAFETY DEPARTMENT FOR REVIEW AND APPROVAL BUILDING PERMIT IS ISSUE CFC SEC. 3303
<br />FIRE HYDRANT LOCATIONS SHALL COMPLY WITH FIRE AND LIFE SAFETY FPB POLICY F-96-01 FOR ON SITE
<br />FIRE HYDRANTS
<br />FIRE HYDRANTS SHALL BE IDENTIFIED BY THE INSTALLATION OF REFLECTIVE MARKERS
<br />1.
<br />2.
<br />3.
<br />4.
<br />5.
<br />6.
<br />7.
<br />8.
<br />9.
<br />10.
<br />11.
<br />12.
<br />13.
<br />14.
<br />15.
<br />16.
<br />17.
<br />18.
<br />g o v e r n i n g c o d e s
<br />ALL WORK SHALL CONFORM TO THE CURRENT EDITIONS OF NATIONAL, STATE, AND LOCAL CODES, AND OTHER
<br />REGULATING AGENCIES WHICH HAVE AUTHORITY OVER ANY PORTION OF THE WORK. ALL CONTRACTORS AND
<br />SUBCONTRACTORS PERFORMING GENERAL CONSTRUCTION, MECHANICAL, ELECTRICAL, PLUMBING, OR RELATED
<br />WORK, SHALL COMPLY WITH APPLICABLE SECTIONS OF THE CODES THAT HAVE JURISDICTION.
<br />APPLICABLE CODES:
<br />2022 CALIFORNIA BUILDING CODE (CBC) PART 1, PART 2, TITLE 24, CCR
<br />2022 CALIFORNIA PLUMBING CODE PART 5, TITLE 24, CCR
<br />2022 CALIFORNIA MECHANICAL CODE PART 4, TITLE 24, CCR
<br />2022 CALIFORNIA FIRE CODE PART 9, TITLE 24, CCR
<br />2022 NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
<br />2022 BUILDING STANDARDS ADMINISTRATIVE CODE PART 1, TITLE 24, CCR
<br />2022 CALIFORNIA ELECTRICAL CODE PART 3, TITLE 24, CCR
<br />2022 CALIFORNIA ENERGY CODE PART 6, TITLE 24, CCR
<br />2022 CALIFORNIA GREEN BUILDING STANDARDS (CALGreen), PART 11, TITLE 24 CCR
<br />2022 CALIFORNIA REFERENCED STANDARDS, PART 12, TITLE 24, CCR
<br />2022 CALIFORNIA EXISTING BUILDING CODE (CEBC)
<br />2010 ADA STANDARDS FOR ACCESSIBLE DESIGN
<br />o w n e r / p e r m i t t e e :
<br />KAISER PERMANENTE
<br />74 NORTH PASADENA AVENUE, 8TH FLOOR
<br />PASADENA, CA 91103
<br />WORK: (626)372-4258
<br />AGNES C. HERRERA (Agnes.C.Herrera@kp.org)
<br />-
<br />-
<br />-
<br />a r c h i t e c t :
<br />HGW ARCHITECTURE
<br />1955 BACON STREET
<br />SAN DIEGO, CA 92107
<br />WORK: 619.523.8485
<br />RANDY HANNA (randy@hgwarchitecture.com)
<br />ERIC WENDLANDT (eric@hgwarchitecture.com)
<br />d i r e c t o r y
<br />m e p e n g i n e e r :
<br />IMEG
<br />222 S. HARBOR BLVD., SUITE 800
<br />ANAHEIM, CA 92805
<br />WORK: (714) 507-1613
<br />TIM PHAM (tim.g.pham@imegcorp.com)
<br />MIRA SOPHOCLIS GEORGY (mira.sophoclis-georgy@imegcorp.com)
<br />3401 SOUTH HARBOR BOULEVARD
<br />SANTA ANA, CA 92704
<br />TITLE
<br />T001. TITLE SHEET
<br />T301 SITE PLAN
<br />SIGNAGE & GRAPHICS
<br />SG200 EXTERIOR SIGNAGE - PAGES 1 THRU 4
<br />SG201 EXTERIOR SIGNAGE - PAGES 5 THRU 8
<br />SG202 EXTERIOR SIGNAGE - PAGES 9 THRU 12
<br />SG203 EXTERIOR SIGNAGE - PAGE 13
<br />ELECTRICAL
<br />ES001 ELECTRICAL COVERSHEET
<br />ES002 ELECTRICAL SPECIFICATIONS
<br />ES003 ELECTRICAL SPECIFICATIONS
<br />ES004 ELECTRICAL SPECIFICATIONS
<br />ES102 LEVEL 02-ELECTRICAL PLAN-OVERALL
<br />ES103 LEVEL 03-ELECTRICAL PLAN-OVERALL
<br />ES122 LEVEL 02-ENLARGED POWER PLAN
<br />ES123 LEVEL 03-ENLARGED POWER PLAN
<br />ES400 PARTIAL SINGLE LINE DIAGRAM, PANEL SCHEDULES, LOAD CALCULATIONS, & DETAILS
<br />No. Revisions Date
<br />1 SD 06/05/2025
<br />2 DD 07/03/2025
<br />3 90% CD 08/15/2025
<br />4 Plan Check Submittal 09/19/2025
<br />12 Plan Check Resubmittal 02/25/2026
<br />AREA PROVIDED FOR CITY APPROVED STAMPS
|