Laserfiche WebLink
1 FOUNDATION PLAN <br />S2.0 <br />FOUNDATION <br />PLAN <br />SHEET NUMBER <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />A <br />D <br />D <br />R <br />E <br />S <br />S <br />: <br />SHEETSOF <br />REVISIONS <br />DRAWN : <br />CHECKED : <br />DATE : <br />JOB NO. <br />MARK DATE <br />PROJECT: <br />25-259 <br />CARLOS <br />12 MAR 26 <br />. . <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />TITLE <br />AD <br />D <br />I <br />T <br />I <br />O <br />N <br />10 <br />4 <br />4 <br /> <br />F <br />A <br />I <br />R <br />B <br />R <br />O <br />O <br />K <br /> <br />L <br />N <br />, <br />3 <br />1 <br />2 <br />3 <br />ENGINEER: <br />Margarito Castillo, S.E. <br />CASTILLO ENGINEERING <br />10 <br />4 <br />4 <br /> <br />F <br />A <br />I <br />R <br />B <br />R <br />O <br />O <br />K <br /> <br />L <br />N <br />. <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br />C <br />A <br />. <br /> <br />9 <br />2 <br />7 <br />0 <br />6 <br />, <br />U <br />S <br />A <br />CONSTRUCTION SHALL CONFORM <br />TO THE ENGINEER. ALL <br />WORK. REPORT DISCREPANCIES <br />BEFORE PROCEEDING WITH THE <br />CHECK AND VERIFY ALL DIMENSIONS <br />TO THE C.B.C. <br />CRISTIAN