Laserfiche WebLink
<br /> <br /> Page 23 of 111 <br /> <br />Report No.: 2410B0143SHA-001 <br /> <br />TRF No. ANSI/CAN/UL 9540A_Unit <br /> <br />ANSI/CAN/UL 9540A <br />Clause Requirement – Test Result - Remark Verdict <br />of the BESS; <br /> • battery system complies with UL 1973 or not. Certificate was not provided N/A <br />5.3.3 Any fire detection and suppression systems that are an <br />integral part of the BESS. <br />Smoke detector and temperature <br />sensor Pass <br />5.3.4 Further details included in the unit level and if <br />applicable, installation level test reports. N/A <br />5.4 Flow Batteries -- <br />5.4.1 For flow batteries, to include the following info: N/A <br /> • the chemistry; Not flow battery N/A <br /> • a generic description of the electrolyte (s); Not flow battery N/A <br /> • the overall dimensions of the individual stack; Not flow battery N/A <br /> • the electrical rating in capacity and nominal voltage <br />of the cell stack. Not flow battery N/A <br /> And the Information of the complete flow battery system: N/A <br /> • the manufacturer's name and model number of the <br />system; Not flow battery system N/A <br /> • the electrical rating in volts and rated storage <br />capacity in Ah or Wh; Not flow battery system N/A <br /> • the number of cells and stacks in the system; Not flow battery system N/A <br /> • the maximum volume of electrolyte(s) for the <br />system. Not flow battery system N/A <br />5.4.2 The flow battery system complies with UL 1973 or not. Not flow battery system N/A <br />5.4.3 Further details included in the flow battery thermal <br />runaway determination level test report. Not flow battery system N/A <br />6 Performance – General <br />6.1 <br />The tests in this standard are extreme abuse <br />conditions conducted on electrochemical energy <br />storage devices, which may result in various kind of <br />hazards. <br />Complied Pass <br />6.2 At the conclusion of testing, samples discharged in <br />accordance with the manufacturer' specifications. Complied Pass <br /> All samples disposed of in accordance with local <br />regulations. Complied Pass <br />9 Unit Level <br />9.1 Sample and test configuration -- <br />9.1.1 <br />The unit level test shall be conducted with BESS units <br />installed as described in the manufacturer's <br />instructions and this section. <br />Complied <br />See attachment 3 Pass