Laserfiche WebLink
UTILITY: SOUTHERN CALIFORNIA <br />EDISON <br />METER #: 222013-192843 <br />AHJ: SANTA ANA CITY (CA) <br />SHEET SIZE: <br />ANSI B <br />17" X 11" <br />LEGACY INSTALLATION SERVICES, LLC <br />3333 DIGITAL DR #600, LEHI, <br />UT 84043, UNITED STATES <br />855-353-4899 <br />dba LGCY ELECTRIC <br />RESERVED FOR ENGINEERING STAMP <br />(IF APPLICABLE) <br />DRAWN BY: <br />ESR <br />DATE: <br /> 26 NOV 2025 <br />DE JESUS GARCIA <br />RESIDENCE <br />1410 W RIVER LN, <br />SANTA ANA <br />CA, 92706 <br />PROJECT ID: LIS53750 <br />SYSTEM SIZE: <br />7310W DC - 11500W AC (6693W CEC AC) <br />MODULES:(17) QCELLS Q.TRON BLK <br />M-G2.H+_003 430 <br />SHEET INDEX: <br />PV-1 - COVER SHEET <br />PV-2 - PROJECT NOTES <br />PV-3 - PROPERTY PLAN <br />PV-4 - SITE PLAN <br />PV-5 - ELEVATION VIEW <br />PV-6 - ATTACHMENT DETAILS <br />PV-7 - THREE LINE DIAGRAM <br />PV-8 - ELECTRICAL CALCS <br />PV-9 - ELEC. LOAD CALC <br />PV-10 - LABELS & PLACARD <br />PV-11 - JOB HAZARD SHEET <br />PV-12 - FIELD CHANGE SHEET <br />PV-13 (+)- DATASHEETS <br /> <br />INVERTER+BATTERY: <br />TESLA POWERWALL 3 1707000-21 <br />INVERTER/W INTEGRATED BATTERY (240V) <br />RSD (S): (6) TESLA MCI-2 <br />RAPID SHUTDOWN DEVICE <br />CONTRACTORS LICENSE #: 1099095 <br />CLASSIFICATION: C-10 ELECTRICAL <br />MARK NIELSON CRAM <br />GENERAL NOTES <br />1.THIS PHOTOVOLTAIC (PV) AND/OR ESS SYSTEM SHALL COMPLY WITH THE MOST <br />RECENTLY ADOPTED ELECTRICAL CODE, ALL MANUFACTURER’S LISTING AND <br />INSTALLATION INSTRUCTIONS, AND OTHER RELEVANT CODES AS SPECIFIED BY <br />THE AUTHORITY HAVING JURISDICTION’S (AHJ) APPLICABLE CODES. <br />2.THE UTILITY INTERCONNECTION APPLICATION MUST BE APPROVED AND THE PV <br />SYSTEM MUST BE INSPECTED PRIOR TO OPERATION. <br />3.ALL PV SYSTEM COMPONENTS; MODULES, UTILITY-INTERACTIVE INVERTERS, <br />AND SOURCE CIRCUIT COMBINER BOXES ARE IDENTIFIED AND LISTED FOR USE <br />IN PHOTOVOLTAIC SYSTEMS AS REQUIRED BY GOVERNING CODES, AND SHALL <br />BE INSTALLED ONLY BY QUALIFIED PERSONNEL. <br />4.ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE. IF <br />EXPOSED TO SUNLIGHT, IT SHALL BE UV RESISTANT. ALL PLAQUES AND <br />SIGNAGE WILL BE INSTALLED AS REQUIRED BY THE ELECTRICAL CODE AND <br />AHJ. <br />5.FOR ROOF MOUNTED PROJECTS, ROOF ACCESS SHALL BE PROVIDED FROM <br />POINTS WHERE A LADDER WOULD NOT OBSTRUCT WINDOWS OR DOORS NOR <br />BE OBSTRUCTED BY TREES, WIRES, ETC. <br />SITE NOTES <br />1.A LADDER (MINIMUM TYPE I WITH A 250LB. RATING, IN GOOD CONDITION) WILL <br />BE IN PLACE FOR INSPECTION IN ACCORDANCE WITH OSHA REGULATIONS. <br />2.THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS A <br />UTILITY INTERACTIVE SYSTEM . <br />3.THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING, <br />MECHANICAL, OR BUILDING ROOF VENTS. <br />4.ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN <br />ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S <br />INSTRUCTIONS SUCH THAT THE ROOF COVERING SERVES TO PROTECT THE <br />BUILDING OR STRUCTURE. <br />EQUIPMENT LOCATIONS <br />1.ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS IN ACCORDANCE WITH NEC <br />110.26. <br />2.WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR <br />EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY NEC 690.31 (A),(C) AND <br />NEC TABLES 310.15 (B)(1) AND 310.15 (B)(3)(a). <br />3.JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES IN <br />ACCORDANCE WITH NEC 690.34, UNLESS NOTED OTHERWISE. <br />4.ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL <br />IN ACCORDANCE WITH APPLICABLE CODES. <br />5.ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR <br />OUTDOOR USAGE WHEN APPROPRIATE. <br />STRUCTURAL NOTES <br />1.THE EXISTING BUILDING'S STRUCTURE SHALL BE VERIFIED AS PROPERLY <br />CONSTRUCTED AND MAINTAINED IN GOOD CONDITION. NO ALLOWANCE HAS <br />BEEN MADE FOR ANY EXISTING DEFICIENCY IN DESIGN, MATERIAL, <br />CONSTRUCTION, OR LACK OF MAINTENANCE FOR THE EXISTING STRUCTURE <br />OR PROPOSED EQUIPMENT. CONTRACTOR SHALL FIELD VERIFY EXISTING <br />CONDITIONS, PROPER FIT, AND CLEARANCES IN THE FIELD. <br />2.FOR ROOF MOUNTED PV SYSTEMS, CONTRACTOR SHALL VERIFY THE ROOF <br />STRUCTURE WILL WITHSTAND THE NEW LOAD COMBINATION. <br />3.IF ANY CONDITION THROUGHOUT THE ASSOCIATED REPORT OR PERMIT <br />DRAWINGS IS NOT REPRESENTED ON-SITE, CONTRACTOR SHALL NOTIFY THE <br />ENGINEER OF RECORD (EOR) OF ANY DISCREPANCIES AND RECEIVE WRITTEN <br />APPROVAL FROM THE EOR BEFORE PROCEEDING WITH INSTALLATION. <br />4.MISCELLANEOUS ITEMS NOT EXPLICITLY NAMED AND SHOWN IN THESE <br />DRAWINGS HAVE NOT BEEN DESIGNED. IT IS RECOMMENDED THAT MATERIAL <br />OF SUITABLE SIZE & STRENGTH BE OBTAINED FROM A REPUTABLE <br />MANUFACTURER FOR MISCELLANEOUS ITEMS. <br />5.CONTRACTOR SHALL BE RESPONSIBLE TO COMPLETE, SEAL, AND <br />WATERPROOF ROOFTOP PENETRATION FOR SOLAR RACKING. <br />6.CONTRACTOR TO PROVIDE MINIMUM 1/4" GAP BETWEEN ALL SOLAR PANELS. <br />7.PROJECT WINDSPEED IS BASIC WIND SPEED PER CODE UNLESS NOTED <br />OTHERWISE. <br />8.RACKING SYSTEM & PV ARRAY WILL BE INSTALLED IN ACCORDANCE WITH THE <br />CODE-COMPLIANT INSTALLATION MANUAL. TOP CLAMPS REQUIRE A <br />DESIGNATED SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND A <br />MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY/SUBARRAY, IN <br />ACCORDANCE WITH RAIL MANUFACTURER’S INSTALLATION PRACTICES. <br />9.JUNCTION BOX WILL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. IF <br />ROOF-PENETRATING TYPE, IT SHALL BE FLASHED & SEALED PER LOCAL <br />REQUIREMENTS. <br />10.ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED <br />PER CODE BY A LICENSED CONTRACTOR. <br />11.ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE <br />SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER OR <br />PROFESSIONAL ENGINEERING GUIDANCE. <br />WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE <br />STAGGERED AMONGST THE ROOF FRAMING MEMBERS. <br />WIRING & CONDUIT NOTES <br />1.ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. <br />CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE <br />REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. <br />2.CONDUCTORS HAVE BEEN SIZED IN ACCORDANCE WITH THE ADOPTED <br />ELECTRICAL CODE. <br />3.AC CONDUCTORS TO BE COLORED OR MARKED PER CODE. <br />4.LISTED OR LABELED EQUIPMENT SHALL BE INSTALLED AND USED IN <br />ACCORDANCE WITH ANY INSTRUCTIONS INCLUDED IN THE LISTING OR <br />LABELING. <br />5.NM CABLE (IF ANY) TO ONLY BE INSTALLED IN DRY LOCATIONS (ATTIC, WALLS, <br />ETC) [CEC 334.10 & 334.12]. <br />GROUNDING NOTES <br />1.GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, <br />AND GROUNDING DEVICES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR <br />SUCH USE. <br />2.PV EQUIPMENT SHALL BE GROUNDED IN ACCORDANCE WITH NEC 690.43 AND <br />NEC TABLE 250.122. <br />3.METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES <br />CONSIDERED GROUNDED IN ACCORDANCE WITH NEC 250.134 AND 250.136. <br />4.EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED IN ACCORDANCE WITH <br />NEC 690.45 AND INVERTER MANUFACTURER'S INSTALLATION PRACTICES. <br />5.EACH MODULE WILL BE GROUNDED AS SHOWN IN MANUFACTURER <br />DOCUMENTATION AND APPROVED BY THE AHJ. <br />6.THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT <br />THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING <br />CONDUCTOR TO ANOTHER MODULE. <br />7.GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED <br />GREEN OR MARKED GREEN IF #4 AWG OR LARGER PER NEC 250.119 <br />8.THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH NEC 690.47 AND NEC <br />250.50 THROUGH 250.106. IF EXISTING SYSTEM IS INACCESSIBLE, OR <br />INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED IN ACCORDANCE <br />WITH NEC 250, NEC 690.47 AND THE AHJ. <br />9.GROUND-FAULT DETECTION SHALL COMPLY WITH NEC 690.41(B)(1) AND (2) TO <br />REDUCE FIRE HAZARDS. <br />DISCONNECTION AND OVERCURRENT PROTECTION NOTES <br />1.DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS <br />OPENED THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE <br />TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS). <br />2.DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE <br />LOCKABLE, AND TO INCLUDE A VISIBLE-BREAK. <br />3.PV SYSTEM CIRCUITS INSTALLED ON OR IN HABITABLE BUILDINGS SHALL <br />INCLUDE A RAPID SHUTDOWN FUNCTION TO REDUCE SHOCK HAZARD FOR <br />EMERGENCY RESPONDERS IN ACCORDANCE WITH 690.12 <br />4.ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO NEC 690.8, 690.9, <br />705.28, 705.30, AND 240. <br />5.INVERTER ON-GRID BRANCHES SHALL BE CONNECTED TO A SINGLE BREAKER <br />OR GROUPED FUSE DISCONNECT(S) IN ACCORDANCE WITH NEC 110.3(B). <br />6.INVERTER(S) SHALL BE COMPLIANT WITH 690.11. <br />NOTES <br />PV-2 <br />PROJECT NOTES <br />STRUCTURAL ONLY <br />11/26/2025