Laserfiche WebLink
N'HI <br />JOB MEMORANDUM <br />Date: June 14,2019 <br />Project Name: 500 West Wamer Ave., Santa Ana, CA 92707 <br />Building permit number: 10199744 <br />From: James Kramer Of: N,IHP <br />To; Jakob Kulik Of: Premier Design + Build Group <br />cc: JeffHall Ot: SPS <br />Ph:562.985.3200 <br />Ph:949.333.2261 <br />Ph: - <br />Email: <br />Email; <br />Email: <br />Projecl Number: 17-0285-01 <br />Page 1 of '1 <br />jkramer@mhpse.com <br />jacob.kulik@pdbgroup.com <br />jhall@spsconslruction.com <br />Subject: STRUCTURAL OBSERVATION <br />A structural observation was performed for the above job on the morning of Wednesday June <br />10, 2019 by James Kramer, SE of our office. Structurally observed was; seismic wall <br />anchorage and roof framing strengthening for the north third of the project (grids 28 to 42, Alo <br />R). <br />With the exception of the items noted below, all observed construction appeared to be in <br />general conformance with the construction documents. <br />At the time of the observation, 100% of the wall anchorage and 100% of roof strengthening in <br />the area reviewed had been completed. <br />On-Site General Contractor - Jakob Kulik, Premier Design and Build Group <br />On-Site Sub-Contractor - Jeff Hall, SPS <br />Specific ltems Noted and discussed on-site - <br />- None <br />U, <br />(9 <br />e <br />* <br />sE <br />rtr <br />t <br />l9o0 Cover Sreci LonS 8ca.h CA 90808 562 985l20O P 562985 l0llF Mhhpsc.om