PLUMBING SPECIFICATIONS <br />1.00 - GENERAL <br />1.01 DESCRIPTION OF WORK <br />FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND SERVICES REQUIRED FOR AND/OR REASONABLY INCIDENTAL TO THE <br />COMPLETION OF THE FOLLOWING WORK. <br />A. SANITARY WASTE AND VENT PIPING SYSTEM INCLUDING CONNECTIONS TO BUILDING SEWER AS SHOWN. <br />B. DOMESTIC HOT AND COLD WATER SYSTEMS INCLUDING WATER HEATER, AND RELATED ACCESSORIES AND CONTROLS. <br />CONNECTION TO BUILDING WATER AS SHOWN. <br />C. PLUMBING FIXTURES, TRIM AND ACCESSORIES INCLUDING INSTALLATION AND SUPPORT. <br />D. FLASHING AND SEALING OF ROOF AND EXTERIOR WALL PENETRATIONS FOR WATER TIGHTNESS. <br />E. CAULKING AND SEALING OF FLOOR AND WALL PENETRATIONS AND FORMED SHAFT PENETRATIONS. <br />F. BACKING FOR SECURING FIXTURES, TRIM AND PIPING. <br />G. ACCESS DOORS WHERE SHOWN OR REQUIRED BY CODE. <br />H. HANGERS, SUPPORTS, AND GUIDES. <br />I. CLEANUP OF DEBRIS AND FINAL CLEANUP OF DRAINS, FIXTURES AND EQUIPMENT. <br />J. RECORD DRAWINGS AND OPERATING MANUALS. <br />K. LICENSE, PERMITS AND ASSOCIATED FEES. <br />L. CUTTING, DRILLING AND PATCHING FOR ALL SURFACES IN RELATION TO PLUMBING WORK. <br />1.02 EXAMINATION OF SITE <br />A. VISIT SITE BEFORE SUBMITTING BID AND CHECK LOCATION OF ALL EXISTING CONDITIONS WHICH WILL AFFECT THIS WORK, <br />VERIFY DIMENSIONS AND LOCATIONS SHOWN ON DRAWINGS AND COVER ALL CONTRACTOR SHALL ASSUME REASONABLE <br />VARIATIONS OR MINOR OMISSIONS AND SHALL COMPLETE PROPOSED WORK WITHOUT ADDITIONAL COST. FAILURE TO VISIT SITE <br />WILL NOT LESSEN RESPONSIBILITY OR ENTITLE ADDITIONAL COMPENSATION FOR WORK NOT INCLUDED IN PROPOSAL. <br />B. VISIT SITE OF THE WORK, COMPARE IT WITH THE DRAWINGS AND SPECIFICATIONS AS TO THE CONDITIONS UNDER WHICH WORK <br />IS TO BE PERFORMED, ASCERTAIN AND CHECK ALL CONDITIONS AND ELEVATIONS AND TAKE ALL MEASUREMENTS WHICH MAY <br />AFFECT THE WORK. NO ALLOWANCE SHALL SUBSEQUENTLY BE MADE FOR ANY EXTRA EXPENSE OR CLAIMS DUE TO FAILURE OR <br />NEGLECT UNDER THIS REQUIREMENT TO MAKE SUCH EXAMINATION, INCLUDING EXAMINATION OF RESTRICTED WORKING <br />CONDITIONS OR SUCH OTHER DIFFICULTIES VISUALLY OBSERVED DURING SITE VISIT. CONTRACTOR IS RESPONSIBLE FOR <br />BECOMING COMPLETELY FAMILIAR WITH THE ARCHITECTURAL AND STRUCTURAL CONDITIONS AND LIMITATIONS WHICH WILL <br />EXIST IN THE BUILDING AND TO PROVIDE ALL LABOR, TOOLS AND MATERIALS REQUIRED TO PRODUCE A COMPLETELY <br />CONCEALED INSTALLATION AS INDICATED ON THE PLANS, SPECIFICATIONS, AND REQUIRED BY THE CODE. <br />C. A REDUCTION OF PIPE AREA THAT OFFERS AN OBSTRUCTION TO FLOW THROUGH THE DRAIN SHALL BE PROHIBITED. <br />1.03 DRAWINGS <br />THE ACCOMPANYING DRAWINGS SHALL BE CONSIDERED PART OF THESE SPECIFICATIONS. WORK AND MATERIALS SHOWN ON THE <br />DRAWINGS AND NOT MENTIONED IN THE SPECIFICATIONS AND VICE VERSA SHALL BE EXECUTED AS IF SPECIFICALLY MENTIONED OR <br />SHOWN IN BOTH. THE DRAWINGS SHALL BE CONSIDERED AS SCHEMATIC IN NATURE AND MINOR MODIFICATIONS OF THE WORK TO <br />COMPLY WITH THE STRUCTURE AS FOUND SHALL BE MADE. <br />1.04 RULES AND REGULATIONS <br />A. ALL WORK AND MATERIAL SHALL BE IN FULL ACCORDANCE WITH THE LATEST RULES AND REGULATIONS OF THE STATE FIRE <br />MARSHAL AND OTHER APPLICABLE STATE AND LOCAL RULES AND REGULATIONS. NOTHING IN THESE DRAWINGS OR <br />SPECIFICATIONS SHALL BE CONSTRUED TO PERMIT WORK NOT CONFORMING TO THESE CODES. <br />B. FURNISH WITHOUT ANY EXTRA CHARGE ANY ADDITIONAL MATERIAL AND LABOR WHEN REQUIRED TO COMPLY WITH THESE LAWS, <br />ORDINANCES AND CODES REGARDLESS OF WHETHER SHOWN OR MENTIONED IN THESE SPECIFICATIONS OF DRAWINGS. <br />C. ALL WORK AND MATERIAL SHALL BE IN ACCORDANCE WITH THE LANDLORD'S MECH/ELECT. DESIGN CRITERIA. ALL CONTRACTORS <br />SHALL OBTAIN A COPY FROM THE LANDLORD'S TENANT COORDINATOR OR MALL OPERATIONS MANAGER AND BECOME FAMILIAR <br />WITH THE REQUIREMENTS CONTAINED WITHIN PRIOR TO BIDDING THE JOB. WHERE LANDLORD'S REQUIREMENTS CONFLICT WITH <br />CODES OR ORDINANCES THE STRICTEST INTERPRETATION SHALL APPLY. <br />1.05 SUBMITTALS <br />A. SUBMIT FOR REVIEW TO THE OWNER A "COMPLETE AND ALL-INCLUSIVE" LIST OF EQUIPMENT AND MATERIALS PROPOSED FOR <br />USE (IN PDF), ACCOMPANIED BY MANUFACTURER'S DATA SHEETS. DATA SHALL BE FORWARDED IN A SINGLE PACKAGE WRITTEN <br />15 DAYS AFTER AWARD OF CONTRACT. SUBMIT SIX BLACKLINE PRINTS AND ONE REPRODUCIBLE SHOP DRAWING SHOWING <br />PROPOSED PLUMBING INSTALLATION. INCLUDE SIZES, LOCATIONS AND OTHER REQUIRED INFORMATION TO COORDINATE <br />INSTALLATION WITH OTHER TRADES. <br />B. WITHIN 5 DAYS AFTER AWARD OF CONTRACT, SUBMIT PDF OF A LETTER STATING ANY MATERIALS THAT CONTRACTOR WISHES TO <br />SUBSTITUTE, TO THE OWNER FOR APPROVAL. INCLUDE SUCH INFORMATION AS MANUFACTURER'S NAME, TYPE OF MATERIAL, <br />CERTIFIED RATINGS, OVERALL APPEARANCE, AND NECESSARY INFORMATION TO EXPLAIN FUNCTION AND OPERATION OF <br />MATERIAL. ALL PROPOSED SUBSTITUTIONS SHALL BE EQUAL IN QUALITY, DESIGN, UTILITY AND APPEARANCE TO MATERIAL, <br />EQUIPMENT OR METHOD SPECIFIED. <br />1.06 AS-BUILT DRAWINGS <br />A SET OF PLUMBING PLANS WILL BE FURNISHED TO THE CONTRACTOR ON WHICH THEY SHALL INDICATE THE INSTALLATION "AS- <br />BUILT" AS THE WORK PROGRESSES. UPON COMPLETION OF THE WORK, A SET OR REPRODUCIBLE DRAWINGS SHALL BE OBTAINED <br />FROM THE OWNER AT COST, AND ALL CHANGES AS NOTED ON THE RECORD SET OF PRINTS SHALL BE INCORPORATED THEREON. <br />THIS SET OF REPRODUCIBLE, ALONG WITH ONE SET OF BLUEPRINTS, SHALL BE DELIVERED TO THE OWNER UPON COMPLETION AND <br />BEFORE FINAL ACCEPTANCE OF THE PROJECT. <br />1.07 GUARANTEE <br />THE CONTRACTOR SHALL LEAVE THE ENTIRE INSTALLATION IN COMPLETE WORKING ORDER FREE FROM ANY DEFECTIVE MATERIAL, <br />WORKMANSHIP OR FINISH. THEY SHALL GUARANTEE TO REPAIR OR REPLACE, WITHOUT CHARGE, DEFECTS DUE TO FAULTY <br />WORKMANSHIP OR MATERIAL FOR A PERIOD OF ONE YEAR FROM THE DATE OF FILING OF THE NOTICE OF COMPLETION. <br />1.08 OPERATION MANUALS AND OWNER INSTRUCTIONS <br />A. PROVIDE COMPLETE OPERATION AND MAINTENANCE MANUALS COVERING ALL PLUMBING SYSTEMS AND EQUIPMENT THAT HAVE <br />BEEN INSTALLED. THREE (3) COPIES OF THE MANUAL SHALL BE BOUND IN HARDBACK BINDERS. <br />B. PROVIDE INSTRUCTIONS TO OWNER AS TO OPERATION OF ALL EQUIPMENT. INSTRUCTION PERIOD TO COMMENCE FOR MINIMUM <br />OF (2) HOURS AND SHALL BE SCHEDULED AT OWNER'S CONVENIENCE. <br />1.09 CUTTING AND PATCHING <br />A. THE CONTRACTOR SHALL DO ALL CUTTING, DRILLING AND PATCHING WHICH MAY BE REQUIRED FOR THE INSTALLATION OF THE <br />WORK UNDER THIS SECTION OF THE SPECIFICATIONS. <br />B. PATCHING SHALL BE OF THE SAME WORKMANSHIP, MATERIAL, AND FINISH AND SHALL MATCH ACCURATELY ALL SURROUNDING <br />CONSTRUCTION IN A MANNER SATISFACTORY TO THE OWNER. NO CUTTING OF THE STRUCTURE SHALL BE PERMITTED WITHOUT <br />WRITTEN APPROVAL OF THE OWNER. <br />2.00 - MATERIALS - PIPING <br />BUILDING DRAIN AND VENT PIPING MATERIALS SHALL COMPLY WITH THE LOCAL AUTHORITY HAVING JURISDICTION. ALL SANITARY <br />SYSTEM MATERIALS SHALL BE LISTED BY AN APPROVED LISTING AGENCY. <br />A. INTERIOR UNDERGROUND SANITARY AND WASTE PIPING: SERVICE WEIGHT CAST IRON NO-HUB C.I. PIPE AND FITTINGS, <br />COMPLYING WITH CISPI STANDARDS, OR ABS DWV SCH40 IF ALLOWED BY THE LOCAL AUTHORITY HAVING JURISDICTION. <br />B. INTERIOR DOMESTIC WATER PIPING ABOVE GROUND: 3" AND SMALLER - TYPE L HARD TEMPERED COPPER WITH SOLDER END <br />FITTINGS. 95-5 TIN AND ANTIMONY SOLDER JOINTING (LEAD-FREE). <br />C. DOMESTIC WATER PIPING BELOW GROUND: TYPE K COPPER PIPE SHALL BE USED. WHEN PIPING IS INSTALLED WITHIN A BUILDING <br />AND UNDER A CONCRETE SLAB, IT SHALL BE INSTALLED WITHOUT JOINTS. WHEN JOINTS ARE UNAVOIDABLE, THEY SHALL BE <br />BRAZED. <br />a. PROTECTIVE PIPE COVERING SHALL BE FACTORY OR FIELD APPLIED ACCORDINGLY TO MANUFACTURERS WRITTEN <br />INSTRUCTIONS. <br />b. 2 ½'' OR LARGER: PRODUCTS SHALL BE POLYKEN NO. 1027 PRIMER AND POLYKEN NO. 910 TAPE COATING, 10 MIL, MINIMUM 1'' <br />OVERLAP REQUIRED. <br />c. 2'' AND SMALLER: PRODUCTS SHALL BE 10 MIL PLASTIC SLEEVE PROTECTOR. <br />D. PLASTIC PIPE, PLASTIC PIPE FITTINGS, AND COMPONENTS OTHER THAN THOSE FOR GAS SHALL COMPLY WITH NSF 14. CAST-IRON <br />SOIL PIPE AND HUBLESS COUPLINGS SHALL BE THIRD PARTY CERTIFIED IN ACCORDANCE WITH ASTM C1277 AND CISPI 310. <br />2.01 PIPE FLASHING <br />4 LBS. LEAD WITH COUNTERFLASHING RING BY GLENCO, STONEMAN ENGINEERING OR APPROVED EQUAL. CONTRACTOR SHALL <br />VERIFY COMPATIBILITY WITH ROOFING MATERIALS. <br />2.02 VALVES <br />A. BALL VALVES: NIBCO 580-70 OR EQUAL, 3'' AND SMALLER. <br />2.03 PLUMBING FIXTURES AND TRIM: <br />A. PLUMBING FIXTURES TO BE FURNISHED AND INSTALLED UNDER THIS CONTRACT. SEE PLUMBING FIXTURE SCHEDULE. <br />B. ALL WATER CLOSETS SHALL NOT EXCEED 1.28 GALLONS PER FLUSH. DUAL-FLUSH WATER CLOSETS SHALL HAVE EFFECTIVE <br />VOLUME FLUSH NOT TO EXCEED 1.28 GPF. IT'S THE AVERAGE FLUSH VOLUME OF TWO REDUCED FLUSHES AND ONE FULL FLUSH. <br />C. WALL MOUNT URINALS SHALL NOT EXCEED 0.125 GALLONS PER FLUSH. <br />2.04 PIPE HANGERS AND SUPPORTS <br />A. SUPERSTRUT, GRINNELL, OR APPROVED EQUAL. <br />B. INSTALLATION PER MANUFACTURER'S RECOMMENDATIONS. <br />C. PIPE HANGERS SHALL HAVE NON-METALLIC FELT OR ELASTOMERIC LINER OR WRAP APPLIED TO THE PIPE FOR ELECTROLYTIC <br />PROTECTION WHERE HANGERS AND SUPPORTS ARE USED TO SUPPORT COPPER TUBING OR PIPE. THE LINER OR WRAP SHALL BE <br />DESIGNED TO ALLOW EXPANSION OR CONTRACTION OF THE PIPING. <br />2.05 PIPE SLEEVES <br />A. SHALL BE PROVIDED TO PROTECT ALL PIPING THROUGH CONCRETE AND MASONRY WALLS.ANNULAR SPACES BETWEEN SLEEVES <br />AND PIPES SHALL BE FILLED OR CAULKED IN AN APPROVED ANNULAR SPACES BETWEEN SLEEVES AND PIPES IN FIRE- <br />RESISTANCE-RATED ASSEMBLIES SHALL BE FILLED OR TIGHTLY CAULKED IN ACCORDANCE WITH THE BUILDING CODE. ALL <br />UNDERSLAB CAST IRON PIPING SHALL BE COVERED WITH POLYETHYLENE SLEEVE (POLYWRAP) AND CONTRACTOR MUST FOLLOW <br />MANUFACTURER'S MANUAL FOR PROPER INSTALLATION. <br />B. OPENINGS INTO A DRAINAGE OR VENT SYSTEM, EXCEPTING THOSE OPENINGS TO WHICH PLUMBING FIXTURES ARE PROPERLY <br />CONNECTED OR WHICH CONSTITUTE VENT TERMINALS, SHALL BE PERMANENTLY PLUGGED OR CAPPED IN AN APPROVED <br />MANNER, USING THE APPROPRIATE MATERIALS. <br />C. PIPING PASSING UNDER OR THROUGH WALLS SHALL BE PROTECTED FROM BREAKAGE. VOIDS AROUND PIPING PASSING <br />THROUGH CONCRETE FLOORS ON THE GROUND SHALL BE SEALED. SLEEVES SHALL BE PROVIDED TO PROTECT PIPING THROUGH <br />CONCRETE NO MASONRY WALLS, AND CONCRETE FLOORS. NO PLUMBING PIPING SHALL BE DIRECTLY EMBEDDED IN CONCRETE <br />OR MASONRY. IN EXTERIOR WALLS, ANNULAR SPACE BETWEEN SLEEVES AND PIPES SHALL BE SEALED AND MADE WATERTIGHT. <br />2.06 TEMPERATURE AND PRESSURE RELIEF VALVE <br />TEMPERATURE & PRESSURE RELIEF VALVE SHALL DISCHARGE FULL LINE SIZE TO AN APPROVED WASTE RECEPTOR THROUGH AN AIR <br />GAP AS INDICATED ON PLANS OR 6'' MINIMUM, 12'' MAXIMUM. <br />2.07 SCALD GUARD PROTECTION <br />PROVIDE AND INSTALL LAVATORY SCALD PROTECTION FOR WASTE PIPING AND HOT WATER PIPING IN COMPLIANCE WITH ASME <br />A112.18.9 . <br />2.08 DOMESTIC PIPING INSULATION <br />A. PROVIDE AND INSTALL "INSULATION PROTECTION SHIELD" FOR PIPING WITH FOAM OR FIBERGLASS INSULATION. <br />B. INSULATE ALL HOT WATER PIPING. THE INSULATION FOR HOT WATER PIPING SHALL HAVE A MINIMUM WALL THICKNESS OF NOT <br />LESS THAN 1" FOR A PIPE UP TO 1" DIAMETER, 1.25" FOR 1-1/4" PIPE, 1.5" FOR 1-1/2" PIPE, 2" FOR 2" PIPE OR MORE IN DIAMETER. <br />THE FIRST EIGHT FEET OF HOT AND COLD OUTLET PIPING, INCLUDING PIPING BETWEEN STORAGE TANK AND A HEAT TRAP, FOR A <br />NON-RECIRCULATING STORAGE SYSTEM. <br />C. PROVIDE AND INSTALL SCALD GUARD PROTECTION/INSULATION UNDER SINKS WITH EXPOSED P-TRAPS AND HOT WATER <br />SUPPLIES. <br />D. ABS PIPING EXPOSED TO SUNLIGHT THAT IS PROTECTED BY WATER BASED SYNTHETIC LATEX PAINTS. PVC PIPING SHALL NOT BE <br />EXPOSED TO DIRECT SUNLIGHT. PVC PIPING EXPOSED TO SUNLIGHT THAT IS PROTECTED BY WATER BASED SYNTHETIC LATEX <br />PAINTS. PVC PIPING WRAPPED WITH NOT LESS THAN 0.04 INCH THICK TAPE OR OTHERWISE PROTECTED FROM UV DEGRADATION. <br />E. PIPING SUBJECT TO OPERATION AT TEMPERATURES THAT WILL FORM CONDENSATION ON THE EXTERIOR OF THE PIPE SHALL BE <br />THERMALLY INSULATED. <br />F. PLASTIC PIPES IN PLENUM SPACES SHALL BE INSULATED WITH APPROVED FIRE BARRIER PLENUM WRAP. FIRE WRAP SHALL HAVE <br />FLAME SPREAD RATING OF 25 OR LESS AND SMOKE DEVELOPED RATING OF 50 OR LESS IN ACCORDANCE WITH ASTM E 84. <br />G. JACKETING SHALL BE REQUIRED ON ALL PIPING INSULATION UNLESS NOTED OTHERWISE IN THE PROJECT DOCUMENTATION. <br />JACKET SHALL BE ALUMINUM OR STAINLESS STEEL MILL FINISH INSTALLED WITH END AND LONGITUDINAL LAP JOINTS <br />CONFIGURED TO SHED WATER. JACKET SHALL BE HELD IN PLACE BY A CONTINUOUS FRICTION TYPE JOINT. PROVIDING A <br />POSITIVE WEATHER PROOF SEAL LOCK OVER THE ENTIRE LENGTH. FINISH CIRCUMFERENTIAL JOINTS WITH A PREFABRICATED <br />ALUMINUM OR STAINLESS STEEL BANDING STRAP. <br />2.09 CLEANOUT <br />A. ACCESSIBLE CLEANOUT SHALL BE PROVIDED AT THE BASE OF EACH WASTE STACK ANDRAINWATER LEADERS. ADDITIONAL <br />CLEANOUT SHALL BE PROVIDED IN A DRAINAGE LINE FOR EACH HORIZONTAL CHANGE OF DIRECTION EXCEEDING 135 DEGREES. <br />CLEANOUT MUST BE PROVIDED ON A HORIZONTAL DRAIN LINE EXCEEDING 5FT OR MORE IN LENGTH SERVING SINKS OR URINALS. <br />AN APPROVED TYPE OF 2-WAY CLEANOUT FITTING SHALL BE INSTALLED OUTSIDE OF A BUILDING AT THE LOWER END OF A <br />BUILDING DRAIN AND EXTENDED TO GRADE. CLEANOUT SHALL HAVE A CLEARANCE OF NOT LESS THAN 24'' BY 24'' IN FRONT OF <br />THE CLEANOUT. CLEANOUT SHALL BE PROVIDED FOR PRESSURE DRAINAGE SYSTEMS. <br />2.10 TRENCHING <br />A. TRENCHES DEEPER THAN THE FOOTING OF A BUILDING OR STRUCTURE, AND PARALLELING THE SAME, SHALL BE LOCATED NOT <br />LESS THAN 45 DEGREES FROM THE BOTTOM EXTERIOR EDGE OF THE FOOTING. <br />3.00 - INSTALLATION AND EXECUTION <br />3.01 GENERAL <br />A. CAST-IRON HUBLESS WITH STAINLESS STEEL SHIELDED COUPLING SHALL BE SUPPORTED HORIZONTALLY AT EVERY OTHER <br />JOINT, UNLESS OVER 4 FEET, THEN SUPPORT EACH JOINT ADJACENT TO JOINT, NOT TO EXCEED 18'', BRACE AT NOT MORE THAN <br />40FT INTERVALS, SUPPORT AT EACH HORIZONTAL BRANCH CONNECTION. HANGERS SHALL NOT BE PLACED ON THE COUPLING. <br />SUPPORT VERTICAL PIPES AT THE BASE AND EACH FLOOR NOT TO EXCEED 15FT. HANGERS AND SUPPORTS FOR ALL PIPING <br />SHALL COMPLY WITH THE LATEST STATE PLUMBING CODE. <br />3.02 SPECIAL REQUIREMENTS, RESPONSIBILITIES AND TESTING <br />A. INSTALL PIPING GENERALLY LEVEL, FREE OF TRAPS AND UNNECESSARY BENDS, TO CONFORM WITH BUILDING REQUIREMENTS. <br />PIPE TO BE FREE OF DEFECTS, AND INSTALLED TO AVOID ANY POSSIBLE GALVANIC ACTION BY ISOLATING DISSIMILAR METALS. <br />B. TEST AND RECORD AVAILABLE DOMESTIC WATER PRESSURE IN STATIC AND DYNAMIC CONDITIONS FOR DYNAMIC TESTING <br />RECORD PRESSURE AND FLOW RATE IN GALLONS PER MINUTE. TRANSMIT THIS INFORMATION TO THE ENGINEER BEFORE <br />PROCEEDING WITH THE WORK. <br />C. PROVIDE ALL TESTS SPECIFIED HEREINAFTER AND AS OTHERWISE REQUIRED. PROVIDE ALL TEST EQUIPMENT, INCLUDING TEST <br />PUMPS, GAUGES, INSTRUMENTS AND OTHER EQUIPMENT REQUIRED. PRESSURE GAUGES USED SHALL BE GRADUATED IN <br />INCREMENTS NOT GREATER THAN 5 POUNDS PER SQUARE INCH.. NO PLUMBING OR DRAINAGE SYSTEM OR PART THEREOF SHALL <br />BE COVERED, CONCEALED, OR PUT INTO USE UNLESS IT HAS BEEN SPECIFIED. CONDUCT ALL TESTS IN THE PRESENCE OF THE <br />OWNER'S REPRESENTATIVE, AND OBTAIN THE NECESSARY JURISDICTIONAL AUTHORITY INSPECTION <br />D. APPLY A WATER TEST TO THE WASTE, AND VENT SYSTEMS WHETHER IN ITS ENTIRETY OR IN SECTIONS; IF APPLIED TO THE <br />ENTIRE SYSTEM, TIGHTLY CLOSE ALL OPENINGS IN THE PIPING EXCEPT THE HIGHEST OPENING, AND FILL THE SYSTEM WITH <br />WATER TO THE POINT OF OVERFLOW. IF THE SYSTEM IS TESTED IN SECTIONS, TIGHTLY PLUG EACH OPENING EXCEPT FOR THE <br />HIGHEST OPENING OF THE SECTION UNDER TEST, AND FILL EACH SECTION WITH WATER, BUT TEST WITH NO LESS THAN A 10' <br />HEAD OF WATER. IN TESTING SUCCESSIVE SECTIONS, TEST AT LEAST THE UPPER 10' OF THE NEXT PRECEDING SECTION SO THAT <br />NO JOINT OR PIPE IN THE BUILDING (EXCEPT THE UPPERMOST 10' OF THE SYSTEM) SHALL HAVE BEEN SUBMITTED TO A TEST OF <br />LESS THAN A 10' HEAD OF WATER. KEEP WATER IN THE SYSTEM OR IN THE PORTION UNDER TEST FOR AT LEAST 24 HOURS <br />BEFORE INSPECTION STARTS, WITH THE SYSTEM TIGHT AT ALL POINTS. <br />E. DOMESTIC WATER SYSTEM SHALL BE TESTED AND PROVED TIGHT UNDER A PRESSURE OF NOT LESS THAN 120 PSI. PIPING MUST <br />STAND THE TEST FOR A PERIOD OF 24 HOURS WITHOUT LEAKING.CHLORINATION OF THE DOMESTIC COLD AND HOT WATER <br />PIPING SYSTEMS IN ACCORDANCE WITH STANDARD TESTING PROCEDURES AND LOCAL HEALTH DEPARTMENT REQUIREMENTS. <br />TESTING BY A FIRM SUCH AS BENNET-MARINE OR EQUAL. SUBMIT CERTIFICATE OF SATISFACTORY TEST RESULTS. <br />F. UPON COMPLETION OF TESTING, CERTIFY TO THE ARCHITECT, IN WRITING THAT THE SPECIFIED TESTS HAVE BEEN PERFORMED <br />AND THAT THE INSTALLATION COMPLIES WITH THE SPECIFIED REQUIREMENTS. <br />G. NO PLUMBING OR DRAINAGE SYSTEM, BUILDING SEWER, PRIVATE SEWER DISPOSAL SYSTEM, OR PART THEREOF, SHALL BE <br />COVERED, CONCEALED, OR PUT INTO USE UNTIL IT HAS BEEN TESTED, INSPECTED, AND ACCEPTED. <br />H. WHERE PIPES ARE INSTALLED IN CEILINGS ABOVE SUCH AREAS, THE CEILING SHALL BE OF THE REMOVABLE TYPE, OR SHALL BE <br />PROVIDED WITH ACCESS PANELS IN ORDER TO FORM A READY ACCESS FOR INSPECTION OF PIPING. <br />I. ALL PIPING SHALL BE VIBRATION ISOLATED FROM THE STRUCTURE. <br />J. PIPING CONNECTIONS SHALL NOT BE SUBJECT TO UNDUE STRAINS OR STRESSES AND PROVISIONS SHALL BE MADE FOR <br />EXPANSION, CONTRACTION AND STRUCTURAL SETTLEMENT TO PREVENT SEPARATION OF THE JOINT OR PHYSICAL DAMAGE. AN <br />APPROVED EXPANSION OR FLEXIBLE PIPE FITTINGS SHALL BE PROVIDED AND ACCESSIBLE. <br />K. WHERE LOCAL CONDITIONS INCLUDE EARTHQUAKE, TORNADO, UNSTABLE GROUND, OR FLOOD HAZARDS, SPECIAL <br />CONSIDERATION SHALL BE PROVIDED TO INCREASE STRENGTH AND FLEXIBILITY OF PIPING SUPPORTS AND CONNECTIONS. <br />3.03 PIPING INSTALLATION <br />A. MAKE CHANGES IN SIZE OF PIPE WITH REDUCING FITTINGS; BUSHINGS WILL NOT BE PERMITTED EXCEPT FOR BELL SHAPED <br />COPPER BUSHINGS. <br />B. INSTALL DIELECTRIC INSULATING UNIONS IN WATER PIPING BETWEEN COPPER PIPING AND FERROUS PIPING OR EQUIPMENT - <br />EPCO, OR EQUAL. <br />C. INSTALL EXPOSED POLISHED CHROME CONNECTIONS FROM FIXTURES OR EQUIPMENT WITH SPECIAL CARE. SHOW NO TOOL <br />MARKS OR THREADS AT FITTINGS. <br />D. CAP OPENINGS IN PIPING DURING CONSTRUCTION. <br />E. PROVIDE 85% RED BRASS PIPE IPS, IN CONNECTION TO FAUCETS, FLUSH VALVES, HOSE BIBBS OR SIMILAR ITEMS REQUIRING <br />RIGID PIPING. EXTEND BRASS PIPE FROM FIXTURE TO POINT WHERE PIPING CAN BE SECURELY FASTENED TO BUILDING <br />CONSTRUCTION. ALL EXPOSED PIPING AND STOP VALVES IN CONNECTION TO FIXTURES SHALL BE CHROME PLATED BRASS. <br />F. INSTALL UNIONS ADJACENT TO VALVES AND WHERE NECESSARY TO FACILITATE DISASSEMBLY OF PIPING. <br />G. ESCUTCHEONS: FIT EXPOSED PIPES PASSING THROUGH FLOORS, WALLS OR CEILINGS WITH ESCUTCHEONS. MANUFACTURE <br />SPECIAL SIZES OF ESCUTCHEONS FROM STEEL AND PRIME COAT CUT IN ROUND, RECTANGULAR OR SQUARE SPACE TO PROVIDE <br />A CLEAN APPEARANCE ACCEPTABLE TO THE ARCHITECT. <br />A. SUPPORT PIPING INDEPENDENTLY OF EQUIPMENT TO WHICH IT IS CONNECTED. <br />B. MAKE COPPER SOLDER JOINTS WITH 95/5 SOLDER, OR SILFOS; CLEAN SURFACES TO BE JOINED FREE OF OIL, GREASE, RUST OR <br />OXIDES AND APPLY FLUX TO EACH JOINT BEFORE HEATING ASSEMBLY. <br />C. ROUGH-IN AND MAKE FINAL CONNECTIONS TO ALL OTHER EQUIPMENT FURNISHED UNDER OTHER DIVISIONS, REQUIRING <br />PLUMBING CONNECTIONS. <br />D. ALL PIPING SHALL BE VIBRATION ISOLATED FROM THE STRUCTURE. <br />E. NO WATER SUPPLY SYSTEM OR PORTION THEREOF SHALL BE COVERED OR CONCEALED UNTIL IT FIRST HAS BEEN TESTED, <br />INSPECTED, AND APPROVED. <br />3.04 SUBSTITUTIONS <br />A. ONE OR MORE MAKES OF MATERIALS AND METHODS MAY HAVE BEEN SPECIFIED TO ESTABLISH THE STANDARD OF QUALITY, <br />WORKMANSHIP, FINISH AND DESIGN REQUIRED, BUT OTHER MATERIALS OR METHODS EQUAL OR BETTER IN QUALITY, <br />WORKMANSHIP, FINISH, DESIGN, AND GUARANTEED PERFORMANCE, MAY BE SUBMITTED FOR REVIEW AND APPROVAL AS <br />SUBSTITUTION. ALL SUBSTITUTIONS ARE SUBJECT TO REVIEW AND APPROVAL BY ARCHITECT, ENGINEER, AND OWNER. <br />B. SUBSTITUTIONS SHALL BE REQUESTED IN A WRITTEN FORM AND SHALL BE ACCOMPANIED WITH A SIGNED STATEMENT THAT <br />PROPOSED SUBSTITUTION IS EQUAL, OR BETTER THAN SPECIFIED. ADDITIONAL DOCUMENTATION TO SUBSTANTIATED PROPOSED <br />SUBSTITUTION MAY BE REQUIRED BY OWNER, ARCHITECT, AND ENGINEER. CONTRACTOR SHALL SUBMIT AS DIRECTED. <br />C. CONTRACTOR SHALL ACCOMPANY REQUEST FOR SUBSTITUTION LETTER WITH A COMPLETED SUBSTITUTION FORM INCLUDE THE <br />COMPARISON FOR FOLLOWING: <br />a. PERFORMANCE DATA <br />b. DIMENSIONS <br />c. COSTS AND DELIVERY SCHEDULE <br />d. LISTED AND APPROVED <br />D. A WRITTEN SIGNED STATEMENT FROM THE GENERAL CONTRACTOR SHALL ACCOMPANY SUBSTITUTION REQUEST FORM <br />ASSURING THAT: <br />a. DIMENSIONS HAVE BEEN VERIFIED WITH PROJECT CONDITIONS AND HAS COORDINATED WITH OTHER SUBSTITUTION DOES <br />NOT AFFECT DIMENSIONS SHOWN ON DRAWINGS. <br />b. THEY SHALL PAY AND BURDEN THE COSTS FOR CHANGES TO THE PROJECT INCLUDING REDESIGN, REENGINEERING AND <br />REVIEW OF SUBSTITUTION. ONLY ONE ENGINEERING REVIEW TIME IS ALLOWED FOR EACH PRODUCT SUBSTITUTION. <br />CONTRACTOR SHALL BE RESPONSIBLE FOR ADDITIONAL REVIEW TIME AND SHALL PAY ARCHITECT AND ENGINEER'S TIME AT <br />THEIR PROFESSIONAL RATE SCHEDULE. <br />c. THEY HAVE CONFIRMED THAT THE PROPOSED SUBSTITUTION WILL HAVE NO ADVERSE AFFECT ON OTHER TRADES, THE <br />CONSTRUCTION SCHEDULE, OR SPECIFIED WARRANTY REQUIREMENTS. <br />d. THEY HAVE CONFIRMED THAT MAINTENANCE AND SERVICE PARTS WILL BE LOCALLY AVAILABLE FOR THE PROPOSED <br />SUBSTITUTION. COST SAVINGS RESULTING FROM SUBSTITUTION SHALL BE RETURNED TO THE CONTRACT OR THE OWNER IF <br />THE SUBSTITUTION IS PERMITTED. <br />E. NO WORK INVOLVING MATERIALS SUBMITTED FOR SUBSTITUTION SHALL PROCEED UNTIL WRITTEN ACCEPTANCE IS RECEIVED <br />FROM THE OWNER. THE OWNER IS THE FINAL JUDGE OF ACCEPTABILITY OF PREFERRED SUBSTITUTIONS. <br />3.05 COORDINATION <br />A. COORDINATE WORK WITH OTHER TRADES TO AVOID CONFLICT AND TO PROVIDE CORRECT ROUGH-IN AND CONNECTION FOR <br />EQUIPMENT FURNISHED UNDER OTHER TRADES THAT REQUIRE PLUMBING CONNECTIONS. INFORM CONTRACTORS OF OTHER <br />TRADES OF THE REQUIRED ACCESS TO AND CLEARANCES AROUND EQUIPMENT TO MAINTAIN SERVICE ABILITY AND CODE <br />COMPLIANCE. <br />B. VERIFY EQUIPMENT DIMENSIONS AND REQUIREMENTS WITH PROVISIONS SPECIFIED UNDER THIS SECTION. CHECK ACTUAL JOB <br />CONDITIONS BEFORE FABRICATING WORK. REPORT NECESSARY CHANGES IN TIME TO PREVENT NEEDLESS WORK. CHANGES OR <br />ADDITIONS, SUBJECT TO ADDITIONAL COMPENSATION, WHICH ARE MADE WITHOUT WRITTEN AUTHORIZATION AND AN AGREED <br />PRICE, SHALL BE AT THE CONTRACTOR'S RISK AND EXPENSE. <br />3.06 MARKING AND IDENTIFICATION <br />ALL DOMESTIC COLD WATER, HOT WATER, SANITARY SEWER, SANITARY VENT, CONDENSATE DRAIN, AND NATURAL GAS PIPING <br />SHALL HAVE VISIBLE PERMANENT LABELS AT EVERY 20 FEET, THE DIRECTION OF NORMAL FLOW SHALL BE CLEARLY SHOWN, AT <br />LEAST ONCE PER ROOM, AND SHALL BE VISIBLE FROM THE FLOOR LEVEL. THE MINIMUM SIZE OF THE LETTERS SHOWN ON TABLE 6-1 <br />BELOW. VALVES SHALL BE LABELED WITH STENCILED OR STAMPED METAL TAGS BEARING THE NAME OF THE SYSTEM THEY <br />CARRY.TABLE 6-1 <br />PIPE SIZE (INCHES) SIZE OF LETTER (INCHES) <br />1/2 - 1 1/4 1/2 <br />1 1/2 - 2 3/4 <br />1.00 - GENERAL <br />1.01 DESCRIPTION OF WORK <br />FURNISH AND INSTALL COMPLETE AND OPERATIONAL HVAC SYSTEM AS SHOWN ON THE DRAWING AND SPECIFIED HEREIN. WORK <br />SHALL INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING: <br />A. POWER VENTILATORS. <br />B. AIR DISTRIBUTION METAL DUCTS. <br />C. HANGERS AND SUPPORTS FOR DUCTWORK, PIPING AND HVAC EQUIPMENT. <br />D. SEISMIC RESTRAINTS AND BRACING. <br />E. AUTOMATIC TEMPERATURE CONTROL SYSTEM. <br />1.02 EXAMINATION OF SITE <br />VISIT SITE BEFORE SUBMITTING BID AND CHECK LOCATION OF ALL EXISTING CONDITIONS WHICH WILL AFFECT THIS WORK, VERIFY <br />DIMENSIONS AND LOCATIONS SHOWN ON DRAWINGS AND COVER ALL COSTS. CONTRACTOR SHALL ASSUME REASONABLE <br />VARIATIONS OR MINOR OMISSIONS AND SHALL COMPLETED PROPOSED WORK WITHOUT ADDITIONAL COST. FAILURE TO VISIT SITE <br />WILL NOT LESSEN RESPONSIBILITY OR ENTITLE ADDITIONAL COMPENSATION FOR WORK NOT INCLUDED IN PROPOSAL. <br />1.03 DRAWINGS <br />THE ACCOMPANYING DRAWINGS SHALL BE CONSIDERED PART OF THESE SPECIFICATIONS. WORK AND MATERIALS SHOWN ON THE <br />DRAWINGS AND NOT MENTIONED IN THE SPECIFICATIONS AND VICE VERSA SHALL BE EXECUTED AS IF SPECIFICALLY MENTIONED OR <br />SHOWN IN BOTH. THE DRAWINGS SHALL BE CONSIDERED AS SCHEMATIC IN NATURE AND MINOR MODIFICATIONS OF THE WORK TO <br />COMPLY WITH THE STRUCTURE AS FOUND SHALL BE MADE. <br />1.04 RULES AND REGULATIONS <br />A. ALL WORK AND MATERIAL SHALL BE IN FULL ACCORDANCE WITH THE LATEST RULES AND REGULATIONS OF THE STATE FIRE <br />MARSHAL AND OTHER APPLICABLE STATE AND LOCAL RULES AND REGULATIONS. <br />B. NOTHING IN THESE DRAWINGS OR SPECIFICATIONS SHALL BE CONSTRUED TO PERMIT WORK NOT CONFORMING TO THESE <br />CODES. <br />C. FURNISH WITHOUT ANY EXTRA CHARGE ANY ADDITIONAL MATERIAL AND LABOR WHEN REQUIRED TO COMPLY WITH THESE LAWS, <br />ORDINANCES AND CODES REGARDLESS OF WHETHER SHOWN OR MENTIONED IN THESE SPECIFICATIONS OF DRAWINGS. <br />1.05 SUBMITTALS <br />A. SUBMIT FOR REVIEW A COMPLETE AND ALL-INCLUSIVE LIST OF EQUIPMENT AND MATERIALS PROPOSED FOR USE; (1) SOFT COPY, <br />ACCOMPANIED BY MANUFACTURER'S DATA SHEETS. DATA SHALL BE FORWARDED IN A SINGLE PACKAGE WITHIN 15 DAYS AFTER <br />AWARD OF CONTRACT. SUBMIT PORTABLE DOCUMENT FORMAT (PDF) AND ONE REPRODUCIBLE SHOP DRAWING SHOWING <br />PROPOSED DUCTWORK INSTALLATION. INCLUDE SIZES, LOCATIONS AND OTHER REQUIRED INFORMATION TO COORDINATE <br />INSTALLATION WITH OTHER TRADES. <br />B. WITHIN 5 DAYS AFTER AWARD OF CONTRACT, SUBMIT PDF & A COPY OF A LETTER STATING ANY MATERIALS THAT CONTRACTOR <br />WISHES TO SUBSTITUTE, TO THE OWNER FOR APPROVAL. INCLUDE SUCH INFORMATION AS MANUFACTURER'S NAME, TYPE OF <br />MATERIAL, CERTIFIED RATINGS, OVERALL APPEARANCE, AND NECESSARY INFORMATION TO EXPLAIN FUNCTION AND OPERATION <br />OF MATERIAL. ALL PROPOSED SUBSTITUTIONS SHALL BE EQUAL IN QUALITY, DESIGN, UTILITY AND APPEARANCE TO MATERIAL, <br />EQUIPMENT OR METHOD SPECIFIED. <br />1.06 AS-BUILT DRAWINGS <br />A. SET OF HVAC PRINTS OR ACCESS TO A PRINT SHOP/PDFS WILL BE FURNISHED TO THE CONTRACTOR ON WHICH HE/SHE SHALL <br />INDICATE THE INSTALLATION "AS-BUILT" AS THE WORK PROGRESSES. UPON COMPLETION OF THE WORK, A SET OF <br />REPRODUCIBLE DRAWINGS SHALL BE OBTAINED FROM THE OWNER AT COST, AND ALL CHANGES AS NOTED ON THE RECORD SET <br />OF PRINTS SHALL BE INCORPORATED THEREON. THIS SET OF REPRODUCIBLES, ALONG WITH ONE SET OF PDF'S, SHALL BE <br />DELIVERED TO THE OWNER UPON COMPLETION AND BEFORE FINAL ACCEPTANCE OF THE PROJECT. <br />1.07 GUARANTEE <br />THE CONTRACTOR SHALL LEAVE THE ENTIRE INSTALLATION IN COMPLETE WORKING ORDER FREE FROM ANY DEFECTIVE MATERIAL, <br />WORKMANSHIP OR HE SHALL GUARANTEE TO REPAIR OR REPLACE, WITHOUT CHARGE, DEFECTS DUE TO FAULTY WORKMANSHIP OR <br />MATERIAL FOR A PERIOD OF ONE YEAR FROM THE DATE OF FILING OF THE NOTICE OF COMPLETION. <br />1.08 OPERATION MANUALS AND OWNER INSTRUCTIONS <br />A. PROVIDE COMPLETE OPERATION AND MAINTENANCE MANUALS COVERING ALL MECHANICAL SYSTEMS AND EQUIPMENT THAT <br />HAVE BEEN INSTALLED. A HARD COPY & SOFT COPY OF THE MANUAL SHALL BE PROVIDED TO AN OWNER. <br />B. PROVIDE INSTRUCTIONS TO STORE PERSONNEL AS TO OPERATION OF ALL HVAC EQUIPMENT AND THERMOSTATS. INSTRUCTION <br />PERIOD TO COMMENCE FOR MINIMUM OF (2) HOURS AND SHALL BE SCHEDULED AT OWNER'S CONVENIENCE. ALSO, PROVIDE <br />STORE MANAGER WITH OPERATION MANUAL. <br />1.09 CUTTING AND PATCHING <br />A. CONTRACTOR SHALL DO ALL CUTTING, DRILLING AND PATCHING WHICH MAY BE REQUIRED FOR THE INSTALLATION OF THE WORK <br />UNDER THIS SECTION OF THE SPECIFICATIONS. <br />B. PATCHING SHALL BE OF THE SAME WORKMANSHIP, MATERIAL, AND FINISH AND SHALL MATCH ACCURATELY ALL SURROUNDING <br />CONSTRUCTION IN A MANNER SATISFACTORY TO THE OWNER. NO CUTTING OF THE STRUCTURE SHALL BE PERMITTED WITHOUT <br />WRITTEN APPROVAL OF THE OWNER. <br />2.00 - EQUIPMENT <br />2.01 GENERAL EXHAUST FAN (ROOF-MOUNTED UPBLAST) <br />A. FURNISH AND INSTALL EXHAUST FAN(S) AS SPECIFIED ON THE DRAWINGS AND IN EQUIPMENT SCHEDULES. <br />B. GENERAL DESCRIPTION: <br />a. UPBLAST FAN SHALL BE FOR ROOF MOUNTED APPLICATIONS <br />b. EACH FAN SHALL BEAR A PERMANENTLY AFFIXED MANUFACTURER'S ENGRAVED METAL NAMEPLATE CONTAINING THE MODEL <br />NUMBER AND INDIVIDUAL SERIAL NUMBER. <br />C. WHEEL: <br />a. CONSTRUCTED OF ALUMINUM <br />b. NON-OVERLOADING, BACKWARD INCLINED CENTRIFUGAL <br />c. STATICALLY AND DYNAMICALLY BALANCED IN ACCORDANCE WITH AMCA STANDARD 204-05 <br />d. THE WHEEL CONE AND FAN INLET WILL BE MATCHED AND SHALL HAVE PRECISE RUNNING TOLERANCES FOR MAXIMUM <br />PERFORMANCE AND OPERATING EFFICIENCY. <br />D. MOTORS: <br />a. AC INDUCTION MOTOR <br />b. MOTOR ENCLOSURE: TOTALLY ENCLOSED FAN COOLED <br />c. MOTORS ARE PERMANENTLY LUBRICATED, HEAVY DUTY BALL BEARING TYPE TO MATCH WITH THE FAN LOAD AND FURNISHED <br />AT THE SPECIFIC VOLTAGE AND PHASE FOR FAN SIZES 90 AND LARGER. FAN SIZES 60-80 USE SLEEVE BEARING. <br />d. MOUNTED ON VIBRATION ISOLATORS, OUT OF AIRSTREAM <br />e. FOR MOTOR COOLING THERE SHALL BE FRESH AIR DRAWN INTO THE MOTOR COMPARTMENT THROUGH AN AREA FREE OF <br />DISCHARGE CONTAMINANTS <br />f. ACCESSIBLE FOR MAINTENANCE <br />E. HOUSING: <br />a. MOTOR COVER, SHROUD, CURB CAP, AND LOWER WINDBAND SHALL BE CONSTRUCTED OF HEAVY GAUGE ALUMINUM <br />b. SHROUD SHALL HAVE AN INTEGRAL ROLLED BEAD FOR EXTRA STRENGTH <br />c. SHROUD SHALL BE DRAWN FROM A DISC AND DIRECT AIR DOWNWARD <br />d. LOWER WINDBAND SHALL HAVE A FORMED EDGE FOR ADDED STRENGTH <br />e. MOTOR COVER SHALL BE DRAWN FROM A DISC <br />f. ALL HOUSING COMPONENTS SHALL HAVE FINAL THICKNESS EQUAL TO OR GREATER THAN PREFORMED THICKNESS <br />g. CURB CAP SHALL HAVE PRE-PUNCHED MOUNTING HOLES TO ENSURE CORRECT ATTACHMENT <br />h. RIGID INTERNAL SUPPORT STRUCTURE <br />i. LEAK PROOF <br />F. HOUSING SUPPORTS AND DRIVE FRAME: <br />a. DRIVE FRAME ASSEMBLIES SHALL BE CONSTRUCTED OF HEAVY GAUGE STEEL AND MOUNTED ON VIBRATION ISOLATORS <br />G. VIBRATION ISOLATION: <br />a. RUBBER ISOLATORS <br />b. SIZED TO MATCH THE WEIGHT OF EACH FAN <br />H. DISCONNECT SWITCHES: <br />a. NEMA RATED: 4 <br />b. POSITIVE ELECTRICAL SHUT-OFF <br />c. WIRED FROM FAN MOTOR TO JUNCTION BOX <br />INSTALLED WITHIN MOTOR COMPARTMENT <br />d. OPTIONS/ACCESSORIES: AS SPECIFIED IN EQUIPMENT <br />SCHEDULES <br />MECHANICAL SPECIFICATIONS <br />H AINROFILACFOETATS <br />REENIGNELANOISSEFORPDERETSIGERNo. 37151 <br />EXP. 12-31-2026 <br />BRIAN E .GRAHAM <br />MEC LACINA <br />©2 <br />0 <br />2 <br />5 <br /> <br />M <br />T <br />N <br /> <br />E <br />n <br />g <br />i <br />n <br />e <br />e <br />r <br />i <br />n <br />g <br />. <br /> <br />A <br />l <br />l <br /> <br />R <br />i <br />g <br />h <br />t <br />s <br /> <br />R <br />e <br />s <br />e <br />r <br />v <br />e <br />d <br />. <br /> <br />N <br />o <br /> <br />p <br />a <br />r <br />t <br /> o <br />f <br /> <br />t <br />h <br />i <br />s <br /> <br />d <br />o <br />c <br />u <br />m <br />e <br />n <br />t <br /> <br />m <br />a <br />y <br /> <br />b <br />e <br /> <br />re <br />p <br />r <br />o <br />d <br />u <br />c <br />e <br />d <br /> <br />i <br />n <br /> <br />a <br />n <br />y <br /> <br />f <br />o <br />r <br />m <br /> <br />o <br />f <br /> <br />b <br />y <br /> <br />a <br />n <br />y <br /> <br />m <br />e <br />a <br />n <br />s <br /> <br />w <br />i <br />t <br />h <br />o <br />u <br />t <br /> <br />p <br />e <br />r <br />m <br />is <br />s <br />i <br />o <br />n <br /> <br />f <br />r <br />o <br />m <br /> <br />M <br />T <br />N <br /> <br />E <br />n <br />g <br />i <br />n <br />e <br />e <br />r <br />i <br />n <br />g <br />. <br />DESIGNED: BG LM BG <br />MECHANICAL ENGINEER <br />DRAWN: CHECKED: <br />PORTOLA PARK <br />SPLASH PAD <br />X <br />BENCHMARK DESCRIPTION: <br />OCS BM SA-253-70 <br />FD 3 3/4" OCS ALUMINUM BENCH MARK DISK STAMPED "SA-253-70", SET IN NW'LY CORNER OF A 3.5FT X 16FT <br />CONCRETE CATCH BASIN. MONUMENT IS LOCATED IN THE NE'LY CORNER OF THE INTERSECTION OF GRAND AVE <br />AND SANTA CLARA AVE, 87FT N'LY OF THE CENTERLINE OF SANTA CLARA AVE AND 39FT E'LY OF THE CENTERLINE <br />OF GRAND AVE. MONUMENT IS SET LEVEL WITH THE SIDEWALK <br />PRINCIPAL CIVIL ENGINEER <br />PRINCIPAL CIVIL ENGINEER25-2401 <br />NUMBER DATE INITIALS DESCRIPTION <br />PREPARED UNDER THE <br />SUPERVISION OF: <br />CITY OF SANTA ANA <br />FILE NO.: <br />INSTALLEDAPPROVED <br />CONSTRUCTION COMPLETED: <br />BENCHMARK NO.: SA-253-70 <br />RECOMMENDED FOR <br />CONSTRUCTION: <br />REFERENCES <br />PUBLIC WORKS AGENCY <br />RCE NO.: <br />ELEV.: 176.00 (2010) <br />REVISIONS <br />SHEET OF <br />REVIEWED FOR <br />CONSTRUCTABLITY: <br />RCE NO.: <br />BRIAN GRAHAM <br />1700 E. SANTA CLARA AVENUE, SANTA ANA, CA 92705 <br />Z: <br />\ <br />S <br />h <br />a <br />r <br />e <br />d <br />\ <br />0 <br />2 <br /> <br />- <br /> <br />P <br />r <br />o <br />j <br />e <br />c <br />t <br />s <br />\ <br />2 <br />0 <br />2 <br />5 <br /> <br />P <br />r <br />o <br />j <br />e <br />c <br />t <br />s <br />\ <br />2 <br />5 <br />- <br />0 <br />0 <br />5 <br /> <br />S <br />a <br />n <br />t <br />a <br /> <br />An <br />a <br /> <br />P <br />o <br />r <br />t <br />o <br />l <br />a <br /> <br />P <br />a <br />r <br />k <br /> <br />R <br />e <br />s <br />t <br />r <br />o <br />o <br />m <br />\ <br />0 <br />2 <br /> <br />- <br /> <br />C <br />A <br />D <br /> <br />F <br />i <br />l <br />e <br />s <br />\ <br />S <br />a <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br /> <br />Po <br />r <br />t <br />o <br />l <br />a <br /> <br />P <br />a <br />r <br />k <br /> <br />R <br />e <br />s <br />t <br />r <br />o <br />o <br />m <br />s <br />. <br />r <br />v <br />t <br />MECHANICAL/PLUMBING SPECIFICATIONS MP3.0 <br />PS-25-2401 <br />57 57