My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3220 S Fairview St - Soils Report
PBA
>
Building
>
Soils Reports
>
F
>
Fairview St
>
3220 S Fairview St
>
3220 S Fairview St - Soils Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 11:14:54 AM
Creation date
9/16/2021 11:10:02 AM
Metadata
Fields
Template:
Soils Report
Full Address
3220 S Fairview St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESPO}iSIBILITY <br />I . The <br />o,rnert6 orpurpose of <br />Lhe soil <br />perforned <br />responsiblereport. <br />GRADING SPECIFICATIONS <br />GENERAL PROVISJONS <br />soils engi ne er end engineerlng geologlst sre the <br />bullder t s representative on the proJec E. For Ehe <br />these speclfica!ions, observBtion and testlng by <br />enBineer includes the observBtion and Eesting <br />by any persor, or persons employed by' and <br />to, the licensed civil engineer slgning the <br />2. All clearlng, 6iie preparatlonr or earthwork <br />performed on this proJect shal1 be conducted by the <br />contractor under the observatlon of the s o11 engineer. <br />3. It is the contractorrs responsibility to conform to <br />the Grading Specifications for the project and the <br />applicable grading ordinances for the jurlsdiction in vhich <br />the project is located. <br />CLEARI}iG <br />L all veBetable <br />sEuDps, 1ogs, <br />1. The site sha11 be cleared of <br />lncludlng but not limlted to trees' <br />hea vy weed grovth, and organic deposits. <br />2. A11 houses, barrrs, <br />r eoove d froo the site, <br />or oLher structures shal1 be <br />3. Unless otherL,ise approved, the f oun dat ion and slabs <br />left f roo the demolition of structures shail be renoved f rom <br />the s1te. lncluded ni th the renoval of foundatlons and slabs <br />shaIl be the removal of basenents, ce11ars, cisterns ' geptlc <br />tanks, paving, curbs , pi pes, a band oned ve11s, both vater and <br />petroLeuE, or other deleterious maLerlals. lio cavi t y left <br />from demolltion sha1l be backfilled until 1t has been <br />observed by the soi 1 engineer. <br />4. Unless oEhernise speclfied, all cleared materials <br />sha11 be reraoved f rom the boundarles of the ProJect to an <br />approved disposal slte. <br />7 /87 Page C <br />grovth <br />trash, <br />L <br />L <br />L <br />L
The URL can be used to link to this page
Your browser does not support the video tag.