My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3220 S Fairview St - Soils Report
PBA
>
Building
>
Soils Reports
>
F
>
Fairview St
>
3220 S Fairview St
>
3220 S Fairview St - Soils Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 11:14:54 AM
Creation date
9/16/2021 11:10:02 AM
Metadata
Fields
Template:
Soils Report
Full Address
3220 S Fairview St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Job No. 48 71 <br />over a 6 nl1 plastic nenbrane. The plastic menbrane should <br />be properly lapped, sealed, and proEected uit.h sand . <br />IE ls cauEioned that concrete slabs ln areas to recelve <br />ceramlc tlle or other crack sensitive floor coverlngs nust <br />be deslgned and consEructed Eo Einlmlze hairline cracklng. <br />Expanslon <br />The results of tests indicate that the solls existlng <br />the site possess Low expanslon potential. The results are <br />f o11ows: <br />on <br />as <br />Source <br />Location <br />Maximum <br />Densi.ty <br />0ptinun <br />MoisEure <br />Expanslon <br />Index <br />Huntington Beach l2l .5 <br />Oso Parkvay <br />Mission Vie jo <br />12.2 <br />consEruction <br />t4 <br />As a result, <br />necessary for expans <br />os <br />ve soll purposes on this <br />Limlts of Re ortin <br />Thls report covers the gradlng <br />lndustrial buildtng betveen Ehe dates <br />!hrough January 25, 1988. <br />perforned f orof January 7, <br />the <br />1988 <br />General <br />The grading performed on thls aite uas done ln anacceptable Eanner and in confornance wLEh the GeotechnlcalInvestlgatlon. The results of testing lndicaEe EhaE the fillhas been compacted to at least 90 percent of maximundenslty. Based on test results and observations made by thisflrn, 1t ls the oplnlon of thls englneer Ehat this proJect <br />is suiEable for the constructlotr of the Kleenline fndustrial <br />Bul1dlng. <br />Page 3 <br />Soluble Sulf ares <br />The soils exlstlng on the sLte contaln a soluble sulfatecontent less than O.2O percent whlch 1s not considereddetrlmental to ,standard concreEe 01xes. As a result, no <br />s&ec1al, ce-EearY type or consLruction 1s consldered necessal!for soluble sulfates for this project. <br />neg. <br />is consldered <br />pro ject. <br />I <br />I <br />I <br />I
The URL can be used to link to this page
Your browser does not support the video tag.