Laserfiche WebLink
mobility corp. <br />SHEET TITLE <br />SHEET NUMBER <br />DRAWN BY: <br />CHECKED BY: - <br />JS <br />1452 EDINGER AVE. <br />TUSTIN, CA 92780 <br />PROJECT NO: <br />AT&T SITE NO:CLL03413 <br />10086996 <br />90% CD'S FOR REVIEW <br />EXPIRATION DATE: 06/30/2027 <br />APPLICANT: <br />CLL03413 <br />MAIN / DYER <br />2621 & 2621 3/4 SOUTH BIRCH STREET <br />SANTA ANA, CA 92707 <br />JS03/17/2025A <br />ENGINEER: <br />GN-1 <br />PLANS PREPARED BY: <br />DATE SIGNED: 12/11/2025 <br />95% CD'S - CLIENT RLs RDL05/01/2025B <br />100% CD'S FOR SUBMITTAL DS12/11/20250 <br />GENERAL CONSTRUCTION NOTES: <br />1. FOR THE PURPOSE OF CONSTRUCTION DRAWINGS, THE FOLLOWING DEFINITIONS SHALL <br />APPLY: <br />GENERAL CONTRACTOR - GENERAL CONTRACTOR <br />SUBCONTRACTOR - CONTRACTOR (CONSTRUCTION) <br />OWNER - AT&T <br />2. ALL SITE WORK SHALL BE COMPLETED AS INDICATED ON THE DRAWINGS AND AT&T PROJECT <br />SPECIFICATIONS. <br />3. GENERAL CONTRACTOR AND SUBCONTRACTOR SHALL VISIT THE SITE AND SHALL FAMILIARIZE <br />HIMSELF WITH ALL CONDITIONS AFFECTING THE NEW WORK AND SHALL MAKE PROVISIONS. <br />GENERAL CONTRACTOR AND SUBCONTRACTOR SHALL BE RESPONSIBLE FOR FAMILIARIZING <br />HIMSELF WITH ALL CONTRACT DOCUMENTS, FIELD CONDITIONS, DIMENSIONS, AND <br />CONFIRMING THAT THE WORK MAY BE ACCOMPLISHED AS SHOWN PRIOR TO PROCEEDING <br />WITH CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE <br />ARCHITECT/ENGINEER PRIOR TO THE COMMENCEMENT OF WORK. <br />4. ALL MATERIALS FURNISHED AND INSTALLED SHALL BE IN STRICT ACCORDANCE WITH ALL <br />APPLICABLE CODES, REGULATIONS, AND ORDINANCES. GENERAL CONTRACTOR SHALL ISSUE <br />ALL APPROPRIATE NOTICES AND COMPLY WITH ALL LAT&T, ORDINANCES, RULES, <br />REGULATIONS, AND LAWFUL ORDERS OF ANY PUBLIC AUTHORITY REGARDING THE <br />PERFORMANCE OF WORK. <br />5. ALL WORK CARRIED OUT SHALL COMPLY WITH ALL APPLICABLE MUNICIPAL AND UTILITY <br />COMPANY SPECIFICATIONS AND LOCAL JURISDICTIONAL CODES, ORDINANCES, AND <br />APPLICABLE REGULATIONS. <br />6. UNLESS NOTED OTHERWISE, THE WORK SHALL INCLUDE FURNISHING MATERIALS, EQUIPMENT, <br />APPURTENANCES, AND LABOR NECESSARY TO COMPLETE ALL INSTALLATIONS AS INDICATED <br />ON THE DRAWINGS. <br />7. PLANS ARE NOT TO BE SCALED. THESE PLANS ARE INTENDED TO BE A DIAGRAMMATIC <br />OUTLINE ONLY UNLESS OTHERWISE NOTED. DIMENSIONS SHOWN ARE TO FINISH SURFACES <br />UNLESS OTHERWISE NOTED. SPACING BETWEEN EQUIPMENT IS THE MINIMUM REQUIRED <br />CLEARANCE. THEREFORE, IT IS CRITICAL TO FIELD VERIFY DIMENSIONS, SHOULD THERE BE <br />ANY QUESTIONS REGARDING THE CONTRACT DOCUMENTS, THE SUBCONTRACTOR SHALL BE <br />RESPONSIBLE FOR OBTAINING A CLARIFICATION FROM THE ARCHITECT/ENGINEER PRIOR TO <br />PROCEEDING WITH THE WORK. DETAILS ARE INTENDED TO SHOWN DESIGN INTENT. <br />MODIFICATIONS MAY BE REQUIRED TO SUIT JOB DIMENSIONS OR CONDITIONS AND SUCH <br />MODIFICATIONS SHALL BE INCLUDED AS PART OF WORK AND PREPARED BY THE <br />ARCHITECT/ENGINEER PRIOR TO PROCEEDING WITH WORK. <br />8. THE SUBCONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH <br />MANUFACTURER'S RECOMMENDATIONS UNLESS SPECIFICALLY STATED OTHERWISE. <br />9. IF THE SPECIFIED EQUIPMENT CANNOT BE INSTALLED AS SHOWN ON THESE DRAWINGS. THE <br />SUBCONTRACTOR SHALL PROPOSE AN ALTERNATIVE SPACE FOR APPROVAL BY THE <br />ARCHITECT/ENGINEER PRIOR TO PROCEEDING. <br />10. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFETY OF WORK AREA, ADJACENT <br />AREAS AND BUILDING OCCUPANTS THAT ARE LIKELY TO BE AFFECTED BY THE WORK UNDER <br />THIS CONTRACT. WORK SHALL CONFORM TO ALL OSHA REQUIREMENTS AND THE LOCAL <br />JURISDICTION. <br />11. GENERAL CONTRACTOR SHALL COORDINATE WORK AND SCHEDULE WORK ACTIVITIES WITH <br />OTHER DISCIPLINES. <br />12. ERECTION SHALL BE DONE IN A WORKMANLIKE MANNER BY COMPETENT EXPERIENCED <br />WORKMAN IN ACCORDANCE WITH APPLICABLE CODES AND THE BEST ACCEPTED PRACTICE. <br />ALL MEMBERS SHALL BE LAID PLUMB AND TRUE AS INDICATED ON THE DRAWINGS. <br />13. SEAL PENETRATIONS THROUGH FIRE RATED AREAS WITH UL LISTED MATERIALS APPROVED BY <br />LOCAL JURISDICTION. SUBCONTRACTOR SHALL KEEP AREA CLEAN, HAZARD FREE, AND <br />DISPOSE OF ALL DEBRIS. <br />14. WORK PREVIOUSLY COMPLETED IS REPRESENTED BY LIGHT SHADED LINES AND NOTES. THE <br />SCOPE OF WORK FOR THIS PROJECT IS REPRESENTED BY DARK SHADED LINES AND NOTES. <br />SUBCONTRACTOR SHALL NOTIFY THE GENERAL CONTRACTOR OF ANY EXISTING CONDITIONS <br />THAT DEVIATE FROM THE DRAWINGS PRIOR TO THE BEGINNING CONSTRUCTION. <br />15. SUBCONTRACTOR SHALL PROVIDE WRITTEN NOTICE TO THE CONSTRUCTION MANAGER 48 <br />HOURS PRIOR TO COMMENCEMENT OF WORK. <br />16. THE SUBCONTRACTOR SHALL PROTECT EXISTING IMPROVEMENTS, PAVEMENTS, CURBS, <br />LANDSCAPING AND STRUCTURES. ANY DAMAGED PART SHALL BE REPAIRED AT <br />SUBCONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE OWNER. <br />17. THE SUBCONTRACTOR SHALL CONTACT UTILITY LOCATING SERVICES PRIOR TO THE START OF <br />CONSTRUCTION. <br />18. GENERAL CONTRACTOR SHALL COORDINATE AND MAINTAIN ACCESS FOR ALL TRADES AND <br />SUBCONTRACTORS TO THE SITE AND/OR BUILDING. <br />19. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SECURITY OF THE SITE FOR THE <br />DURATION OF CONSTRUCTION UNTIL JOB COMPLETION. <br />20. THE GENERAL CONTRACTOR SHALL MAINTAIN IN GOOD CONDITION ONE COMPLETE SET OF <br />PLANS WITH ALL REVISIONS, ADDENDA, AND CHANGE ORDERS ON THE PREMISES AT ALL <br />TIMES. <br />21. THE GENERAL CONTRACTOR AND SUBCONTRACTOR SHALL PROVIDE PORTABLE FIRE <br />EXTINGUISHERS WITH A RATING OF NOT LESS THAN 2-A OT 2-A:10-B:C AND SHALL BE WITHIN 25 <br />FEET OF TRAVEL DISTANCE TO ALL PORTIONS OF WHERE THE WORK IS BEING COMPLETED <br />DURING CONSTRUCTION. <br />22. ALL EXISTING ACTIVE SEWER, WATER, GAS, ELECTRIC, AND OTHER UTILITIES SHALL BE <br />PROTECTED AT ALL TIMES, AND WHERE REQUIRED FOR THE PROPER EXECUTION OF THE <br />WORK, SHALL BE RELOCATED AS DIRECTED BY THE ARCHITECT/ENGINEER. EXTREME CAUTION <br />SHOULD BE USED BY THE SUBCONTRACTOR WHEN EXCAVATING OR DRILLING PIERS AROUND <br />OR NEAR UTILITIES. SUBCONTRACTOR SHALL PROVIDE SAFETY TRAINING FOR THE WORKING <br />CREW. THIS SHALL INCLUDE BUT NOT BE LIMITED TO A) FALL PROTECTION, B) CONFINED <br />SPACE, C) ELECTRICAL SAFETY, D) TRENCHING & EXCAVATION. <br />23. ALL EXISTING INACTIVE SEWER, WATER, GAS, ELECTRIC, AND OTHER UTILITIES, WHICH <br />INTERFERE WITH THE EXECUTION OF THE WORK, SHALL BE REMOVED, CAPPED, PLUGGED OR <br />OTHERWISE DISCONNECTED AT POINTS WHICH WILL NOT INTERFERE WITH THE EXECUTION OF <br />THE WORK, AS DIRECTED BY THE RESPONSIBLE ARCHITECT/ENGINEER, AND SUBJECT TO THE <br />APPROVAL OF THE OWNER AND/OR LOCAL UTILITIES. <br />24. THE AREAS OF THE OWNER'S PROPERTY DISTURBED BY THE WORK AND NOT COVERED BY <br />THE TOWER, EQUIPMENT OR DRIVEWAY, SHALL BE GRADED TO A UNIFORM SLOPE, AND <br />STABILIZED TO PREVENT EROSION. <br />25. SUBCONTRACTOR SHALL MINIMIZE DISTURBANCE TO THE EXISTING SITE DURING <br />CONSTRUCTION. EROSION CONTROL MEASURES, IF REQUIRED DURING CONSTRUCTION, <br />SHALL BE IN CONFORMANCE WITH THE FEDERAL AND LOCAL JURISDICTION FOR EROSION AND <br />SEDIMENT CONTROL. <br />26. NO FILL OR EMBANKMENT MATERIAL SHALL BE PLACED ON FROZEN GROUNDING. FROZEN <br />MATERIALS, SNOW OR ICE SHALL NOT BE PLACED IN ANY FILL OR EMBANKMENT. <br />27. THE SUBGRADE SHALL BE BROUGHT TO A SMOOTH UNIFORM GRADE AND COMPACTED TO 95 <br />PERCENT STANDARD PROCTOR DENSITY UNDER PAVEMENT AND STRUCTURES AND 80 <br />PERCENT STANDARD PROCTOR DENSITY IN OPEN SPACE. ALL TRENCHES IN PUBLIC RIGHT OF <br />WAY SHALL BE BACKFILLED WITH FLOWABLE FILL OR OTHER MATERIAL PRE-APPROVED BY <br />THE LOCAL JURISDICTION. <br />28. ALL NECESSARY RUBBISH, STUMPS, DEBRIS, STICKS, STONES, AND OTHER REFUSE SHALL BE <br />REMOVED FROM THE SITE AND DISPOSED OF IN A LAWFUL MANNER. <br />29. ALL BROCHURES, OPERATING AND MAINTENANCE MANUALS, CATALOGS, SHOP DRAWINGS, <br />AND OTHER DOCUMENTS SHALL BE TURNED OVER TO THE GENERAL CONTRACTOR AT <br />COMPLETION OF CONSTRUCTION AND PRIOR TO PAYMENT. <br />30. SUBCONTRACTOR SHALL SUBMIT A COMPLETE SET OF AS-BUILT REDLINES TO THE GENERAL <br />CONTRACTOR UPON COMPLETION OF PROJECT AND PRIOR TO FINAL PAYMENT. <br />31. SUBCONTRACTOR SHALL LEAVE PREMISES IN A CLEAN CONDITION. <br />32. THE NEW FACILITY WILL BE UNMANNED AND DOES NOT REQUIRE POTABLE WATER OR SEWER <br />SERVICE, AND IS NOT FOR HUMAN HABITAT (NO HANDICAP ACCESS REQUIRED). <br />33. OCCUPANCY IS LIMITED TO PERIODIC MAINTENANCE AND INSPECTION, APPROXIMATELY 2 <br />TIMES PER MONTH, BY AT&T TECHNICIANS. <br />34. NO OUTDOOR STORAGE OR SOLID WASTE CONTAINERS ARE PROPOSED . <br />35. ALL MATERIAL SHALL BE FURNISHED AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH <br />THE LATEST REVISION AT&T MOBILITY GROUNDING STANDARD "TECHNICAL SPECIFICATION <br />FOR CONSTRUCTION OF GSM/GPRS WIRELESS SITES" AND "TECHNICAL SPECIFICATION FOR <br />FACILITY GROUNDING". IN CASE OF A CONFLICT BETWEEN THE CONSTRUCTION SPECIFICATION <br />AND THE DRAWINGS, THE DRAWINGS SHALL GOVERN. <br />36. SUBCONTRACTORS SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS AND INSPECTIONS <br />REQUIRED FOR CONSTRUCTION. IF SUBCONTRACTOR CANNOT OBTAIN A PERMIT, THEY MUST <br />NOTIFY THE GENERAL CONTRACTOR IMMEDIATELY. <br />37. SUBCONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE SITE ON A DAILY BASIS. <br />38. INFORMATION SHOWN ON THESE DRAWINGS WAS OBTAINED FROM SITE VISITS AND/OR <br />DRAWINGS PROVIDED BY THE SITE OWNER. CONTRACTORS SHALL NOTIFY THE ENGINEER OF <br />ANY DISCREPANCIES PRIOR TO ORDERING MATERIAL OR PROCEEDING WITH CONSTRUCTION. <br />39. NO WHITE STROBIC LIGHTS ARE PERMITTED. LIGHTING IF REQUIRED, WILL MEET FAA <br />STANDARDS AND REQUIREMENTS. <br />40. ALL COAXIAL CABLE INSTALLATIONS TO FOLLOW MANUFACTURER'S INSTRUCTIONS AND <br />RECOMMENDATIONS. <br />41. NO NOISE, SMOKE, DUST, OR VIBRATIONS WILL RESULT FROM THIS FACILITY. <br />(DELETE THIS NOTE IF THE SITE WILL HAVE A GENERATOR). <br />42. NO ADDITIONAL PARKING TO BE PROPOSED . EXISTING ACCESS AND PARKING TO REMAIN. <br />(REVISE THIS NOTE ACCORDING TO THE SITE CONFIGURATION). <br />43. NO LANDSCAPING IS NEW AT THIS SITE, UNLESS NOTED OTHERWISE. <br />(REVISE THIS NOTE ACCORDING TO THE SITE CONFIGURATION). <br />44. CONTRACTOR SHALL ASSESS & REPAIR ANY DAMAGED AND/ OR MISSING CABLE TRAY <br />COVERS, SLEEPERS, AND/ OR COVER CLAMPS. <br />45. CONTRACTOR SHALL ASSESS AND REPLACE ANY MISSING OR DAMAGED COLOR CODED, <br />CONTINUOUS, PHOTO-LUMINESCENT/REFLECTIVE MARKING ON ALL EXISTING CABLE TRAY. <br />46. CONTRACTOR SHALL ASSESS AND REPLACE ANY MISSING OR DAMAGED ANTENNA <br />"TRANSMITTER" LABELS & ENSURE MARKING ARE AFFIXED TO ANY EXISTING & NEW ANTENNA. <br />ANTENNA MOUNT OR CONSPICUOUS LOCATION NEAR THE ANTENNA. <br />47. THE PROPOSED MODIFICATIONS WILL NOT RESULT IN AN INCREASE IN THE HEIGHT OF THE <br />EXISTING STRUCTURE. <br />48. THE PROPOSED MODIFICATIONS WILL NOT REQUIRE THE EXTENSION OF THE SITE BOUNDARY. <br />49. THE PROPOSED MODIFICATIONS WILL NOT INCREASE NOISE LEVELS AT THE FACILITY BY SIX <br />DECIBELS OR MORE OR TWO LEVELS THAT EXCEED STATE AND LOCAL CRITERIA. <br />50. THE OPERATION OF THE REPLACEMENT ANTENNAS WILL NOT INCREASE RADIO FREQUENCY <br />EMISSIONS AT THE FACILITY TO A LEVEL AT OR ABOVE THE FEDERAL COMMUNICATIONS <br />COMMISSION SAFETY STANDARD. <br />51. THE PROPOSED MODIFICATION WILL NOT CAUSE A CHANGE OR ALTERATION IN THE PHYSICAL <br />OR ENVIRONMENTAL CHARACTERISTICS OF THE SITE. <br />GENERAL NOTES