Laserfiche WebLink
Roof <br />Member Name Results (Max UTIL <br />%) <br />Current Solution Comments <br />Roof Joist RJ-1 Passed (67% ΔT)1 piece(s) 2 x 6 DF No.2 @ 16" OC <br />Roof Joist RJ-2 Passed (33% M)1 piece(s) 2 x 4 DF No.2 @ 16" OC <br />Hip Beam (HB-1)Passed (92% M)1 piece(s) 4 x 10 DF No.2 <br />Hip Beam (HB-2)Passed (20% R)1 piece(s) 4 x 8 DF No.2 <br />Hip Beam (HB-3)Passed (40% M)1 piece(s) 2 x 8 DF No.2 <br />Ceiling <br />Member Name Results (Max UTIL <br />%) <br />Current Solution Comments <br />Ceiling Joist CJ-1 Passed (61% M)1 piece(s) 2 x 6 DF No.1 @ 16" OC <br />Ceiling Joist CJ-2 Passed (76% ΔT)1 piece(s) 2 x 8 DF No.1 @ 16" OC <br />Flush Beam (B-1)Passed (68% M)1 piece(s) 4 x 10 DF No.1 <br />Flush Beam (B-2)Passed (70% M)1 piece(s) 4 x 8 DF No.1 <br />Flush Beam (B-3)Passed (99% ΔL)1 piece(s) 3 1/2" x 11 1/4" 2.0E Parallam® PSL <br />Header (HD-1)Passed (95% M)1 piece(s) 4 x 6 DF No.2 <br />Header (HD-2)Passed (83% M)1 piece(s) 4 x 6 DF No.2 <br />Beam (B-4)Passed (85% ΔL)1 piece(s) 3 1/2" x 11 1/4" 2.0E Parallam® PSL <br />1133 S Austin St. Unit 2 SA- Addition +Detached ADU <br />JOB SUMMARY REPORT <br />ForteWEB Software Operator Job Notes 3/6/2024 4:09:08 AM UTC <br />Hoang Pham <br />HD Engineering Construction Inc. <br />(714) 495-0056 <br />hdanpham@gmail.com <br />ForteWEB v3.7 <br />File Name: 1133 S Austin St. Unit 2 SA- Addition +Detached <br />ADU <br />Page 1 / 15