Laserfiche WebLink
ExpTDITEO PSRMIT PROCESS FOR SUnII-SCALE PV SySTeuS <br />MICRO-INVTRTER <br />The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations <br />are simple, needing only a basic review and when an insmllation is more complex. It is likely that 50%-75% of all residential <br />systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been <br />suggested to provide as a path to permit approval. <br />Required Information for Permit : <br />t. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it <br />should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings <br />with a 3' perimeter space at ridge and sides may not need separate fire service review. <br />2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, <br />required signs, and ac connection to building (see supplied standard electrical diagram). <br />3. Specifrcation sheets and installation manuals (if available) for all manufactured components including, but not <br />limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. <br />Step 1: Structural Review o[ PV Array Mounting System <br />Is the array to be mounted on a defrned, permitted roof structuref Eyes flno <br />I! No due to non-compliant rooJ or a groundmount, submit completed worksheetJor the sffucture Wr(Sr. <br />Roof Information: <br />l. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc CONCRETE TILE <br />If No,submitcornpletedworksheetJorroof sffuctureWKSI (No = heavymctsonry,slate,etc...). <br />2. Does the roof have a single roof coveringz EIyes Eno <br />If No, submit completedworksheetJor roof stucture WKSI. <br />3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk)FLASHING AND CAULKING <br />Mounting Sy stem InJormation: <br />l. ls the mounting structure an engineered product designed to mount PV modules with no more than an I8" gap <br />beneath the module frames? EIyes Etlo <br />$ No, provide details of strucfiral attachment certified $t a design proJessional. <br />2. For manufactured mounting systems, fill out information on the mounting system below: <br />a. Mountin$ System Manufacturer so.ARwAREHot'sE Product Name and Model# ROOF HOOK (MR-SW-RF5.8LPB) <br />b. Total Weioht of PV Modules 3n6 X311s 734.6 lbs <br />c. Total Number of Attachment Points 34 <br />d.Weif,htperAttachmentPointtb_c>?-lbs(ifgreaterthan45lbs,seeWKSl) <br />e. Maximum Spacing Between Attachment Points on a Rail 48 nches (see product manual for <br />maximum spacing allowed based on maximum design wind speed) <br />f. Total Surface Area oF PV Modules (square Feet'1270.4 y <br />g Distributed Weight of PV Module on Roof tU *02'6 lbs/ft2 <br />Ij distributedweight of the Pv system is greater than 5lbsfff , see WI(S,. <br />Step 2: Electrical Review of PV System (Calculations [or Electrical Diagram) <br />In order for a PV system to be considered for an expedited permit pnocess, the following must apply: <br />l. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. <br />2. The PV array is composed of 4 series strings or less per inverter. <br />3. The total inverter capacity has a continuous ac power output 13,44O Watts or less <br />4. The ac interconnection point is on the load side of service disconnecting means (690.64(8)). <br />5. One of the standard electrical diagrams (El.l, El.la, E1.lb, or El.lc) can be used to accurately represent the PV <br />system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. <br />Fill ottt tlw standard electrical cliagrant cotnpletely. A guide to the electrical diagratn is provided to help tlrc applicart <br />understand each blank to fill in. lf the electrical system is more contplex than the standard electrical diaE arn can ef.fectively <br />communicate. provide an alternative diagratn wtth appropriate detatl. <br />2 IXI,EDII.ED PERI\4I-I. PROCESS FOR PV SysT"t,IuTs - I\4ICRO-INVERTER