Laserfiche WebLink
CIT\ OISANM <br />NAJl{ilffi <br />a <br />Planning & Building Agency <br />Building Safety Division <br />20 Glvlc Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(7141 647-5800 <br />w\irw.santa-ana,org <br />RESIDENTIAL <br />PHOTOVOLTAIG <br />CHECKLIST <br />sol-01 cBC 2013 <br />Sotar Photovoltaac (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />tnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. lf answerinq NO to anv of the ouestions. plan check shall be required. <br />Project Address 2910 S- Rita wav- Santa Ana- CA 92704 <br />1 <br />Contractor Company Name: <br />Gontractor License Number: <br />YES NO <br />tr tr <br />trtr <br />trtr <br />Brisht Planet Solar <br />1020761 c-10 <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.'1 1 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-112inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />2. <br />3. <br />4. <br />5. <br />6. <br />7 <br />I <br />I <br />trtr <br />trtr <br />trtrtrtr <br />trtr <br />trtr <br />10 trtr <br />I certify under penalty of perJury under the laws of the State of California that the above is true: <br />Print Name:Kevin Pham Signature: <br />Phone Number: 8889974469 <br />Email Address <br />Rev: 1111912015 <br />Date:7lt6l2t <br />Kerro An*