Laserfiche WebLink
1 <br />. ExPEDITED PERMIT PRoCESS FoR SUIII.SCALE PV SySTTmS <br />MICnO-INVERTER <br />The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations <br />are simple, needing only a basic review, and when an installation is more complex. lt is likely that 50%-75% of all residential <br />systems will comply with these simple criteria. For projects that fail to meet che simple criteria, resolution sceps have been <br />suggested to provide as a path to permit approval. <br />Re qub e d Information for Permit : <br />l. Site plan showing location of major components on the property. This drawing need not be exactty to scale, but it <br />should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings <br />with a 3' perimeter space at ridge and sides may not need separate fire service review. <br />2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, <br />required signs, and ac connection to building (see supplied standard electrical diagram). <br />3. Specification sheets and insnllation manuals (if available) for all manufactured components including, but not <br />limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. <br />Step 1: Structural Review of PV Array Mounting System <br />Is the array to be mounted on a defined, permitted roof structuret Elyes Dtlo <br />I,f No due to non-compltant rooJ or a ground mounL submit completed worksheet.for the structure WKS 1 . <br />Roof Information: <br />1. Is the roofing type lightweight (Yes : composition, lightweight masonry, metal, etc ) Yes <br />M ounting Sy stem Infonn"ation: <br />I . Is the mounting structure an <br />beneath the module frames? <br />IJ No, submit completed worksheetJor rooJ structure WKSI (No = heavy masonry, slate, etc...). <br />2. Does the roof have a single roof coveringZ EYes Euo <br />IJ No, submit completed worhsheetJor rooJ structure WRSI. <br />3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk)flashing, caulk <br />product designed to mount PV modules with no more chan an l8" gap <br />Yes fl r,lo <br />If No, provide details oJ structural attachment certified by a design professional. <br />2. For manufactured mounting systems, fill out information on the mounting system below: <br />a. Mounting Svstem Manufacturer ouickMountPV'rronRidsc Product Name and Model#E-Mount QMSE-LAG-A-1 2, XR-1 00-204 Rail <br />b. Total Weight of PV Modules and Rails 816.34 I bs <br />c. Toul Number of Attachment Points 30 <br />d. Weighr per Attachment Poinr (b + c)27.2't lbs (if greater than 45 lbs, see WKS I ) <br />e. Maximum Spacing Between Attachment Points on a Rai | 72" OC inches (see product manual for <br />maximum spacing allowed based on maximum design wind speed) <br />f. Total Surface Area of PV Modules (square feetl 302.95 6gz <br />g. Distributed Weight oF PV Module on Roof (b +2.69 <br />IJ distributed wetght of the Pv system is greater than 5 lbs$P, see WXSI. <br />Step 2: Electrical Review of PV System (Calculations lor Electrical Diagram) <br />In order for a PV system to be considered for an expedited permit process, the following must apply: <br />l. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. <br />2. The PV array is composed of 4 series strings or less per inverter. <br />3. The total inverter capacity has a continuous ac power output 13,440 Watts or less <br />4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). <br />5. Oneof thestandardelectrical diagrams(El.l,E1.1a,El.lb,orEl.1c)canbeusedtoaccuratelyrepresentthePV <br />system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. <br />Fill out the standard electrical diagram completely. A guide to the electical diagram is provided to help the applicant <br />understand each blanh turtU in. If the electrical system is more complex than the standard electrical diagram can efJectively <br />communicate, provide an alternative diagram with appropriate detail. <br />2 TXPEDITED PERMIT PRoCEss FoR PV SYSTEMS - MICRo-INVERTER <br />lbs/ft2