Laserfiche WebLink
Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(7141 647-5800 <br />w\ nir.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL-01 cBC 2016 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. lf answerinq NO to anv of the questions. plan check shall be required. <br />Project Address l?/'2-"- S, ?o{t4r. Sir . 9<xa l\nc, , (1* q ?1t7i <br />Contractor Company Name:Ca ? tg frI+<a rrcltiv\oS <br />Contractor License Number: b ttt 1 5 :+'< <br />Are the following applicable to the proposed proiect? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-112inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />I certify under penalty of perjury under the laws of the State of Ga the above tru e: <br />Print Namei 6\LaWz+h ++lt Signature <br />Phone Number: ( ul l5; '' 'i-co= Date: <br />Email Address: cAa er{D A*tCl 4 l+<rnaliues , o t?^?. <br />YES NO <br />trtr1 <br />2. <br />3. <br />4. <br />5. <br />6. <br />trtr <br />Ftr <br />7 atr <br />B trtr <br />e Eltr <br />Eltr <br />trtr <br />Eltr <br />tru <br />10 <br />0 ( <br />Rev: Bl29l19 <br />q