Laserfiche WebLink
<br /> <br />STRUCTURAL CALCULATIONS FOR PLAN CHECK <br /> <br /> <br /> <br />MATERIAL LIFT <br />COLLECTOR’S UNIVERSE PHASE 04 TI <br />1601 E. ST. ANDREWS PLACE <br />SANTA ANA, CA 90705 <br /> <br />ASE PROJECT NO. 24026.2 <br /> <br />4 PAGES <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />January 31, 2026 <br />YourSpreadsheets <br />Address line 1 and line 2 <br />Telephone line 1 and Fax <br />A GROUND BEAM GB2 REVISED.D <br />B <br />REMOVED GB32. ADDED NEW <br />REINFORCEMENT TO GB4 AND <br />GB12. ADDED NEW GB48. <br />D <br />C NEW LINKS ADDED TO GB23.D