Laserfiche WebLink
Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-1 9) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL-01 cBc 2016 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESTDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size NO heck <br />Project Address:f cd) <br />Contractor Company Name: <br />Contractor License Number:?c <br />1 <br />YES/,NOtrtr <br />'ptr <br />@,e <br />Wu <br />Etr <br />#trr' <br />9.#- <br />/I <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontalspacing shown on the plans? <br />will the minimum 5/16" lag screws be installed with a minimum of 2-1t2inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a california <br />licensed professional engineer? (including project specific site plan, pV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />of under the laws of the State of above is true: <br />o u9ru s ignatu re: <br />Date <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />10 <br />! certify under <br />Print Name: <br />Phone Number: <br />Email Address: <br />Rev: 8129119