My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
102106825 - Permit
PBA
>
Building
>
Permits
>
M
>
Maple St
>
1402 S Maple St
>
102106825 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2021 9:37:38 AM
Creation date
9/30/2021 4:23:55 PM
Metadata
Fields
Template:
Permit
Permit Number
102106825
Full Address
1402 S Maple St
Permit ID
275569
Master ID Number
2021-166449
Project Name
Principe Res. Alt
Street Number
001402
Street Direction
S
Street Name
Maple
Street Suffix
St
Building Use Code
Resid-1 unit
Job Types
Alteration
Permit Type
Building
Applied Date
6/1/2021
Issued Date
6/1/2021
Finalized Date
8/17/2021
Flood Zone
X-0602320276J
Description of Work
Legalize window change out throughout SFD and Garage. Approximately 14 windows. Owner-Builder form on file.
Nature of Work
N/V - Windows, W/H
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
[: X I.,I I)ITI- tI I'E RN4 I'I I'IIt IC [.\ \ J:OIilIr,IA I t - SCALE I)V SYSIEITS <br />N4 I c R.o- I N\/ [ ltt'[: tl. <br />The information in this guideline is intended to help localjurisdictions and contractors identify when PV system installations <br />are simple, needing only a basic review and when an installation is more complex. lt is likely that 50%-75% of all residential <br />sysrems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been <br />suggested to provide as a path to permit approval. <br />Required lnformation for Pennit : <br />I . Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it <br />should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings <br />with a 3'perimeter space at ridge and sides may not need separate fire service review. <br />2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, <br />required signs, and ac connection to building (see supplied standard electrical diagram). <br />3. Specification sheets and installation manuals (if available) for all manufactured components including. but not <br />limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. <br />Step 1 : Structural Review of PV Array Mounting System <br />Is the array to be mounted on a defined, permitted roof structure? Elyes EIno <br />I,f No due to non-compliant roo"f or a ground mount, submit completecl worksheet Jor the structure WKSI. <br />Roof Information: <br />l. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc...)Yes <br />If No,submitcompletedworksheetforroof structure\RSl (No = heavymasonry.slate,etc...). <br />2. Does the roof have a single roof coveringZ Zyes Euo <br />If No, submit completed worksheetfor roof sffucture WKSI. <br />3. Provide method and type of weatherproofing roof penetrations (e.g. flashing. caulk).- <br />M ount ing Sy st em Informat ion : <br />l. Is the mounting structure an engineegld product designed to mount PV modules with no more than an I8" gap <br />benearh the module frames? EIyes f]no <br />If No, provide details of structural attachment cerilrted by a design professional. <br />2. For manufactured mounting systems, fill out information on the mounting system below: <br />a.MountingSvstemManufacturer-ProductNameandModel# <br />b. Total Weight of PV Modules and Rails _lbs <br />c. Total Number of Attachment Points_ <br />d.WeightperAttachmentPoint(b+c)-Ibs(ifgreaterthan45lbs,seeWKS1) <br />e Maximum Spacing Between Attachment Points on a Rail nches (see product manual for <br />maximum spacing allowed based on maximum design wind speed) <br />f.TotalSurfaceAreaofPVModuIes(squarefee0-ft, <br />s.DiStributedWeightofPVModuleonRoof(b+l)-lbs/ft: <br />II distributed weight of the PV system is greater than 5lbsfP, see WKSI. <br />Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) <br />In order for a PV system to be considered for an expedited permit process, the following must apply: <br />I . PV modules. utility-interactive inverters, and combiner boxes are identified for use in PV systems. <br />2. The PV array is composed of 4 series strings or less per inverter. <br />3. The total inverter capacity has a continuous ac power output 13,44O Watts or less <br />4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). <br />5. One of the standard electrical diagrams (El.l, El.la, El.lb, or EI.lc) can be used to accurately represent the PV <br />system. lnteractive PDF diagrams are available at wwwsolarabcs.org/permirting. <br />Fill out rhe sttutdard electical clittgram contpletell' ,4 guide to the electrit'al diagrun is provided to help the ultplicunt <br />understancl each bltmk to.fill irt. If the electrical systern is nrore corttplex than the stanclard electrical cliagrtun can efJectively <br />cor.rtrttttt.rit'are. p't>vide un ulternafit'e diagrarn with appropridte derail. <br />2 EXI'[DI-t[TI I'ERIUIII PR()(]I:S5 FtIR I'V S\SI'I'I\IS - MICRTT.INVERI IR
The URL can be used to link to this page
Your browser does not support the video tag.