My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20173267 - Permit
PBA
>
Building
>
Permits
>
T
>
Twenty-First St
>
1522 E Twenty-First St
>
20173267 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2021 9:37:44 AM
Creation date
9/30/2021 4:24:13 PM
Metadata
Fields
Template:
Permit
Permit Number
20173267
Full Address
1522 E Twenty-First St
Permit ID
274866
Master ID Number
2021-166002
Project Name
Miscellaneous Counter1 Permit
Street Number
001522
Street Direction
E
Street Name
Twenty-First
Street Suffix
St
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
5/7/2021
Issued Date
5/7/2021
Flood Zone
X-0602320163J
Description of Work
Installation of roof mounted PV system. Worksheet attached to plans. All fees paid on # 101106611
Nature of Work
***CANCELLED***Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXPEDITED PERTTzIIT PROCESS FOR SITnEII-SCALE PV SYSTEMS <br />STnNDARD STRINC SyslrpI <br />The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations <br />are simple, needing only a basic review and when an installation is more complex. It is likely that 50%-75 % of all residential <br />systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been <br />suggested to provide as a path to permit approval. <br />Re quired Information for Permit : <br />I . Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it <br />should represent relative location oi components at site (see supplied example site plan). PV arrays on dwellings <br />with a 5' perimeter space at rid$e and sides may not need separate fire service review. <br />2. Electrical diagram showing PV array configuration, wirin$ system, overcurrent protection, inverter, disconnects, <br />required signs, and ac connection to building (see supplied standard electrical diagram). <br />3. Specification sheets and installation manuals (il available) for all manufactured components including, but not <br />limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. <br />Step 1 : Structural Review of PV Array Mounting System <br />Is the array to be mounted on a defined, permitted roof structuret Elyes Eno <br />IJ No due to non-compliant rooJ or a ground mount, submit completed worksheetJor the structure WKSI. <br />Roof Information: <br />l. Is the roofing type lightweight (Yes : composition, lightweight masonry, metal, etc YES <br />If No,submitcompletedworksheetforroof structureWKS( (No = heavymasonry,slate,etc...). <br />2. Does the roof have a single roof coveringZ Eyes ! no <br />If No, submit completed worksheet.for roof structure WKSI . <br />3. Provide method and type of weatherproohng roof penetrations (e.g. flashing, caulk)Flashing, geocell sealant <br />M ounting Sy stem Information : <br />I . Is the mounting structure an elgineered product designed to mount PV modules with no more than an 18" gap <br />beneath the module frames? Ll yes Ll tlo <br />$ No, provide details of structural attachment certirfied by a design professional. <br />2. For manufactured mounting systems, frll out information on the mounting system below: <br />a. Mountind Svstem Manuflacturer Zep Procluct Name ancl Moclel# comp Mount Type c <br />b. Total Weigh t of PV Modules and Rails 569 lbs <br />c. Total Number of Attachment Poin tc 51 <br />d. Weight per Attachment Point (b+c) 11.16 lbs (if greater than 45 lbs, see WKSI) <br />e. Maximum Spacing Between Attachment Points on a Rail 24 inches (see product manual for <br />maximum spacing allowed based on maximum design wind speed) <br />f. Total Surface Area of PV Modules (square leet)472 tr' <br />g Distributed Weight oF PV Module on Roof tO + f\ 1-2 lbs/[t2 <br />If distributed weight of the PV system is greater than 5 lbslft2, see WKSI. <br />Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) <br />In order for a PV system to be considered for an expedited permit process, the followingl must apply: <br />I. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. <br />2. The PV array is composed of 4 series strings or less per inverter. <br />3. The total inverter capacity has a continuous ac power outpuL 13,44O Watts or less <br />4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). <br />5. One of the standard electrical diagrams (El.l, El.la, El.lb, or El.lc) can be used to accurately represent the PV <br />system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. <br />Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant <br />understand each blank tofill in. If the electrical system is more complex than the standard electrical diagram can effectively <br />communicate, provide an alternative diagram with appropriate detail. <br />2 Exl,EDtrED l,ERMlr pRocESs FoR pv sysrEMS
The URL can be used to link to this page
Your browser does not support the video tag.