N
<br />ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE ORIGINAL AND
<br />UNPUBLISHED WORK OF THE ARCHITECT AND MAY NOT BE DUPLICATED, USED, OR DISCLOSED
<br />WITHOUT WRITTEN CONSENT OF ARCHITECT. COPYRIGHTED.
<br />PROJECT NO. CHECKED BY
<br />SHEET NO.
<br />SCALE @ ARCH E1
<br />SHEET NAME
<br />CLIENT NAME
<br />ARCHITECT'S STAMP
<br />PROJECT TEAM
<br />KEY PLAN
<br />3/
<br />5
<br />/
<br />2
<br />0
<br />2
<br />6
<br />
<br />1
<br />1
<br />:
<br />5
<br />3
<br />:
<br />1
<br />5
<br />
<br />A
<br />M
<br />Au
<br />t
<br />o
<br />d
<br />e
<br />s
<br />k
<br />
<br />D
<br />o
<br />c
<br />s
<br />:
<br />/
<br />/
<br />C
<br />o
<br />l
<br />l
<br />e
<br />c
<br />t
<br />o
<br />r
<br />s
<br />
<br />-
<br />
<br />s
<br />n
<br />a
<br />1
<br />6
<br />1
<br />0
<br />p
<br />h
<br />4
<br />/
<br />s
<br />n
<br />a
<br />1
<br />6
<br />1
<br />0
<br />p
<br />h
<br />4
<br />_
<br />RV
<br />T
<br />2
<br />6
<br />.
<br />r
<br />v
<br />t
<br />23008.00
<br />G0.02
<br />sna1610ph4 -PHASE 4
<br />1610 E ST ANDREW PL, SUITE 240
<br />SANTA ANA, CA 92705
<br />GENERAL NOTES -COMMERCIAL
<br />TI
<br />COLLECTORS
<br />-
<br />DIVISION 1 - GENERAL CONDITIONS
<br />1.1 SCOPE OF WORK
<br />A. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE EXTENT, NATURE,
<br />AND SCOPE OF WORK DESCRIBED IN THE CONTRACT DOCUMENTS. THE GENERAL
<br />CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO
<br />EXECUTE ALL WORK SHOWN ON THESE DRAWINGS EXCEPT WHERE NOTED AS NOT IN
<br />CONTRACT (NIC). HE SHALL BE RESPONSIBLE FOR COORDINATING HIS WORK WITH THAT OF
<br />ALL OTHER TRADES INCLUDING THOSE OPERATING UNDER SEPARATE CONTRACTS WITH THE
<br />LANDLORD AND/OR TENANT. ALL WORK SHALL BE PERFORMED BY SKILLED AND QUALIFIED
<br />WORKMEN IN ACCORDANCE WITH THE BEST PRACTICES OF THE TRADES INVOLVED.
<br />B. THE DRAWINGS SHALL BE RECOGNIZED AS DIAGRAMMATIC IN NATURE AND NOT
<br />COMPLETELY DESCRIPTIVE OF ALL REQUIREMENTS FOR CONSTRUCTION. WHATEVER WORK
<br />THAT MAY BE SPECIFIED AND NOT DRAWN OR DRAWN AND NOT SPECIFIED SHALL BE
<br />EXECUTED AS FULLY AS IF DESCRIBED IN BOTH THESE WAYS. SHOULD ANY WORKMANSHIP
<br />OR MATERIAL BE NECESSARY THAT IS NOT EITHER DIRECTLY OR INDIRECTLY NOTED IN
<br />THESE SPECIFICATIONS OR SHOWN ON THE DRAWINGS BUT IS NEVERTHELESS NECESSARY
<br />FOR PROPERLY CARRYING OUT THE OBVIOUS INTENTION THEREOF; CONTRACTOR SHALL
<br />UNDERSTAND IT TO BE IMPLIED AND SHALL PROVIDE FOR THE SAME AS FULLY AS IF IT WERE
<br />PARTICULARLY DESCRIBED OR DELINEATED.
<br />C. THE GENERAL CONTRACTOR SHALL REVIEW ALL CONSTRUCTION DOCUMENTS AND
<br />VERIFY ALL GOVERNING DIMENSIONS AT THE BUILDING. HE SHALL EXAMINE ALL ADJOINING
<br />WORK OR AREAS UPON WHICH THE PERFORMANCE OF HIS WORK IS IN ANY WAY
<br />DEPENDENT. ANY VARIATIONS OR DISCREPANCIES SHALL BE REPORTED, WITH ALL DUE
<br />EXPEDIENCY, TO ARCHITECT PRIOR TO THE FABRICATION OR ERECTION OF THE WORK IN
<br />QUESTION.
<br />D. ALL WORK IS TO BE PERFORMED IN STRICT ACCORDANCE WITH RULES AND
<br />REGULATIONS OF GOVERNMENTAL AGENCIES AND SHALL CONFORM TO ALL CITY, COUNTY,
<br />STATE AND FEDERAL CODES AND ORDINANCES. ALL FEES, TAXES, AND PERMIT
<br />APPLICATIONS WITH THE APPROPRIATE GOVERNMENTAL AGENCIES SHALL BE THE
<br />RESPONSIBILITY OF THE GENERAL CONTRACTOR UNLESS OTHERWISE NOTED.
<br />1.2 THESE GENERAL CONDITIONS SHALL APPLY TO ALL WORK SHOWN HEREIN, AND SHALL
<br />EXTEND TO ANY CHANGES, EXTRAS, OR ADDITIONS AGREED TO DURING THE COURSE OF
<br />WORK.
<br />1.3 THE AIA STANDARD DOCUMENT A201 ENTITLED "GENERAL CONDITIONS OF THE
<br />CONTRACT FOR CONSTRUCTION" IS MADE PART OF THE GENERAL CONDITIONS.
<br />1.4 USE OF DRAWINGS:
<br />DO NOT SCALE DRAWINGS, DIMENSIONS SHALL GOVERN. LARGE SCALE DETAILS SHALL
<br />GOVERN OVER PLANS AND ELEVATIONS. DIMENSIONS ARE FROM FACE OF FINISH TO FACE
<br />OF FINISH UNLESS OTHERWISE NOTED.
<br />1.5 CONSTRUCTION SCHEDULE:
<br />WITHIN ONE WEEK OF THE AWARD OF THE CONTRACT THE GENERAL CONTRACTOR
<br />SHALL SUBMIT A DETAILED CONSTRUCTION SCHEDULE TO THE ARCHITECT FOR REVIEW.
<br />SCHEDULE SHALL INCLUDE THE ORDER AND ANTICIPATED DELIVERY DATES OF ALL LONG
<br />LEAD TIME MATERIALS. CONTRACTOR SHALL UPDATE THE SCHEDULE NO LESS THAN
<br />WEEKLY THROUGHOUT THE COURSE OF CONSTRUCTION.
<br />1.6 CONSTRUCTION MEETINGS:
<br />CONTRACTORS SHALL BE RESPONSIBLE FOR KEEPING DETAILED WEEKLY MINUTES OF
<br />CONSTRUCTION MEETINGS.
<br />1.7 SITE VISITS:
<br />BIDDERS ARE INSTRUCTED TO VISIT AND INSPECT THE PREMISES PRIOR TO SUBMITTING
<br />THEIR PROPOSALS AND TO FAMILIARIZE THEMSELVES WITH THE CONDITIONS UNDER WHICH
<br />THE WORK WILL BE PERFORMED. NO SUBSEQUENT EXTRAS OR ADDITIONS WILL BE
<br />ALLOWED ON ANY CLAIM FOR LACK OF KNOWLEDGE OF CONDITIONS OR CIRCUMSTANCES
<br />ABOUT WHICH THE BIDDER COULD HAVE INFORMED HIMSELF.
<br />1.8 LIMITATIONS AND EXCLUSIONS:
<br />BIDDER SHALL MAKE KNOWN TO ARCHITECT ANY LIMITATIONS, EXCLUSIONS, OR
<br />MODIFICATIONS TO THE PROJECT DURING THE BID PERIOD OF THE PROJECT. ALL
<br />LIMITATIONS, EXCLUSIONS, OR MODIFICATIONS SHALL BE ITEMIZED IN THE BID PROPOSAL,
<br />OR THEY WILL BE PRESUMED INCLUDED; IN WHICH CASE NO ADDITIONAL MONIES WILL BE
<br />ALLOCATED.
<br />1.9 INSURANCE:
<br />ALL CONTRACTORS INVOLVED IN THIS PROJECT SHALL CARRY PROPERTY DAMAGE AND
<br />PUBLIC LIABILITY INSURANCE AS REQUIRED BY GOVERNMENTAL AGENCIES HAVING
<br />JURISDICTION OVER THE PROJECT AND SHALL COMPLY WITH STATUTORY REQUIREMENTS
<br />FOR DISABILITY AND WORKMEN'S COMPENSATION. CONTRACTORS SHALL COMPLY WITH ALL
<br />RULES AND REGULATIONS DICTATED BY THE LANDLORD. INSURANCE SHALL PROTECT
<br />LANDLORD, TENANT, ARCHITECT AND ANY OTHER ENTITIES REQUESTED TO BE FREE FROM
<br />LIABILITY DUE TO CONTRACTOR'S NEGLIGENCE. A PROPERLY EXECUTED CERTIFICATE OF
<br />INSURANCE, AIA DOCUMENT #G705, SHALL BE SUBMITTED TO THE ARCHITECT PRIOR TO THE
<br />COMMENCEMENT OF ANY WORK.
<br />1.10 SUBMITTALS AND SHOP DRAWINGS:
<br />A. THE GENERAL CONTRACTOR SHALL SUBMIT THREE (3) SAMPLES AND / OR SCHEDULES
<br />OF EACH OF THE VARIOUS MATERIALS, HARDWARE, EQUIPMENT, AND FINISHES TO
<br />ARCHITECT FOR REVIEW AND COMMENT. SUBMITTALS INCLUDE, BUT ARE NOT LIMITED TO,
<br />DOORS, HARDWARE, LIGHTING, PLUMBING, ELECTRICAL, MECHANICAL, FINISHES, AND
<br />SPECIALTY EQUIPMENT.
<br />B. THE GENERAL CONTRACTOR SHALL SUBMIT TO ARCHITECT FOR REVIEW AND
<br />COMMENT THREE (3) PRINTS OF ALL FABRICATION, ERECTION, OR INSTALLATION SHOP
<br />DRAWINGS. SHOP DRAWINGS INCLUDE, BUT ARE NOT LIMITED TO, MILLWORK, STRUCTURAL,
<br />LIFE SAFETY, AND HVAC.
<br />C. CONTRACTORS SHALL NOT COMMENCE ANY PORTION OF THE WORK REQUIRING
<br />SUBMISSION OF A SHOP DRAWINGS, PRODUCT DATUM, OR SAMPLE UNTIL THE SUBMITTAL
<br />HAS BEEN REVIEWED BY THE ARCHITECT AND / OR THE APPROPRIATE CONSULTANT.
<br />ARCHITECT SHALL HAVE FIVE (5) BUSINESS DAYS PER REVIEW. INCOMPLETE SUBMITTALS
<br />WILL DELAY REVIEW. DOORS, HARDWARE, AND FRAMES ARE CONSIDERED A SINGLE REVIEW
<br />PACKAGE.
<br />1.11 SUBSTITUTIONS:
<br />THERE SHALL BE NO SUBSTITUTION OF MATERIALS SPECIFIED BY THE ARCHITECT.
<br />WHERE THE TERM "OR EQUAL" IS USED THE ARCHITECT ALONE SHALL DETERMINE EQUALITY
<br />BASED UPON INFORMATION SUBMITTED BY THE CONTRACTOR.
<br />1.12 MANUFACTURER’S INSTRUCTIONS:
<br />A. UNLESS OTHERWISE SPECIFIED, INSTALLATION OF WORK SHALL COMPLY WITH
<br />MANUFACTURER’S PRINTED INSTRUCTIONS AND RECOMMENDATIONS. CONTRACTOR SHALL
<br />OBTAIN AND DISTRIBUTE COPIES OF SUCH INSTRUMENTS TO PARTIES INVOLVED IN
<br />INSTALLATION; AND MAINTAIN ONE SET OF COMPLETE INSTRUCTIONS AT THE JOBSITE
<br />DURING INSTALLATION AND UNTIL COMPLETION.
<br />B. CONTRACTOR SHALL HANDLE, INSTALL, CONNECT, CLEAN, CONDITION, AND ADJUST
<br />PRODUCTS IN STRICT ACCORDANCE WITH MANUFACTURER’S INSTRUCTIONS.
<br />C. CONTRACTOR SHALL PERFORM WORK IN STRICT ACCORDANCE WITH
<br />MANUFACTURER’S INSTRUCTIONS. DO NO OMIT ANY PREPARATORY SET OR INSTALLATION
<br />PROCEDURE, UNLESS SPECIFICALLY MODIFIED OR EXEMPTED BY THE CONTRACT
<br />DOCUMENTS.
<br />1.13 OVER – STOCK:
<br />GENERAL CONTRACTOR TO CONSULT TENANT AND LANDLORD REGARDING OVER-STOCK
<br />MATERIALS FOR FUTURE MAINTENANCE. SUCH ITEMS MAY INCLUDE: CARPET, CARPET
<br />ACCESSORIES, DOOR HARDWARE, CEILING TILE, AND PAINT. UNLESS OTHERWISE NOTED,
<br />PROVIDE OVER – STOCK AS FOLLOWS: CEILING TILE – ONE (1) CASE, CARPET TILE – TWO (2)
<br />CASES PER EACH TYPE SPECIFIED, BROADLOOM CARPET – TO BE DETERMINED.
<br />1.14 BUILDING REGULATIONS:
<br />THE GENERAL CONTRACTOR SHALL COMPLY WITH THE RULES AND REGULATIONS OF THE
<br />BUILDING LANDLORD, AND SHALL COORDINATE THE USE OF ELEVATORS AND LOADING
<br />DOCKS PRIOR TO COMMENCEMENT OF WORK WITH SAME.
<br />1.15 BUILDING PROTECTION:
<br />GREAT CARE SHALL BE EXERCISED TO ASSURE THAT THE BUILDING AND TENANT AREAS
<br />SHALL BE PROTECTED FROM DAMAGE THAT COULD OCCUR BECAUSE OF THIS WORK.
<br />CONTRACTORS SHALL PROVIDE PROTECTION FOR EXISTING AREAS AND NEW WORK AREAS.
<br />ANY DAMAGE DUE TO THE CONTRACTOR’S WORK SHALL BE REPAIRED OR REPLACED AT THE
<br />CONTRACTOR'S SOLE EXPENSE. CONTRACTOR SHALL PROVIDE DUST PROOF BARRICADES
<br />AROUND ALL AREAS OF NEW WORK AS NECESSARY TO PROTECT ADJACENT TENANT AREAS
<br />FROM DAMAGE.
<br />1.16 CUTTING AND DRILLING:
<br />CUTTING, CHASING, DRILLING OR DEMOLITION OF WALLS, SLABS, ETC. REQUIRING THE
<br />USE OF JACK HAMMERS OR OTHER HEAVY HAND OR POWER TOOLS SHALL BE PERFORMED
<br />OUTSIDE REGULAR BUSINESS HOURS ON AN OVERTIME BASIS UNLESS THE LANDLORD AND
<br />ANY AFFECTED TENANT EXPRESSLY PERMIT IT.
<br />1.17 HAZARDOUS MATERIALS
<br />REPORT ANY HAZARDOUS MATERIALS TO THE LANDLORD AND ARCHITECT IMMEDIATELY.
<br />1.18 CLEAN-UP
<br />THE GENERAL CONTRACTOR SHALL AT ALL TIMES KEEP THE PREMISES FREE OF
<br />ACCUMULATION OF WASTE MATERIALS OR RUBBISH CAUSED BY HIS OPERATIONS OR BY
<br />THOSE OF OTHER CONTRACTORS UNDER SEPARATE CONTRACT. CONTRACTOR SHALL
<br />CONFINE HIS OPERATIONS FOR REMOVAL TO SUCH METHODS AS MAY BE AGREEABLE WITH
<br />THE LANDLORD. PREMISES TO BE SWEPT CLEAN ON A DAILY BASIS.
<br />1.19 PUNCH-LIST:
<br />UPON COMPLETION OF THE WORK THE GENERAL CONTRACTOR SHALL PREPARE A
<br />"PUNCH-LIST" OF PENDING CORRECTIONS AND UNSATISFACTORY AND/OR INCOMPLETE
<br />WORK FOR REVIEW AND AMENDMENT BY THE ARCHITECT. RELEASE OF FINAL PAYMENT WILL
<br />BE CONTINGENT ON THE COMPLETION OF THESE ITEMS UNDER THE TERMS OF THE OWNER-
<br />CONTRACTOR AGREEMENT.
<br />1.20 GUARANTEE:
<br />ALL WORK AND MATERIALS SHALL BE GUARANTEED AGAINST DEFECTS IN DESIGN,
<br />WORKMANSHIP AND MATERIALS FOR A PERIOD OF AT LEAST (1) ONE YEAR FROM DATE OF
<br />FINAL ACCEPTANCE AND PAYMENT. ALL DEFECTS OCCURRING IN THE GUARANTEE PERIOD
<br />SHALL BE CORRECTED AT NO COST TO THE TENANT.
<br />1.21 AS BUILT DRAWINGS:
<br />DURING THE COURSE OF CONSTRUCTION, ACTUAL LOCATIONS OF ALL RUNS OF
<br />MECHANICAL AND ELECTRICAL WORK SHALL BE INDICATED TO SCALE IN RED INK ON THE
<br />DRAWINGS, INCLUDING CONCEALED DEVIATIONS FROM THE DRAWINGS. UPON COMPLETION
<br />OF THE PROJECT, INCLUDING THE PUNCH-LIST, THIS DRAWING SET SHALL BE TRANSFERRED
<br />TO ELECTRONIC CAD DRAWINGS. THE CAD DRAWINGS SHALL BE MARKED "AS BUILT SET" AND
<br />RETURNED TO ARCHITECT AND TENANT ON COMPACT DISK. THE ARCHITECT SHALL, WITHIN
<br />FIVE WORKING DAYS OF THE RECEIPT OF THIS SET, GRANT APPROVAL FOR FINAL PAYMENT
<br />TO THE CONTRACTOR OR SHOW REASONABLE CAUSE WHY SUCH APPROVAL IS DENIED.
<br />1.22 SUBSTANTIAL COMPLETION
<br />THE FOLLOWING ARE REQUIRED FOR SUBSTANTIAL COMPLETION:
<br />A. FINAL CLEANING BY A PROFESSIONAL SERVICE
<br />B. AS-BUILT DRAWINGS ON COMPACT DISK
<br />C. A BINDER WITH OPERATION, MAINTENANCE DATA, AND WARRANTIES FOR ALL
<br />INSTALLED SYSTEMS.
<br />D. SPECIFIED QUANTITIES OF MAINTENANCE AND OVER STOCK MATERIALS
<br />E. HVAC BALANCE REPORT
<br />DIVISION 2 - DEMOLITION
<br />2.1 DESCRIPTION OF WORK
<br />PERFORM ALL WORK OF A DEMOLITION NATURE THAT MAY BE REQUIRED OR NECESSARY
<br />TO A FULL AND COMPLETE EXECUTION OF THE WORK, WHETHER OR NOT SHOWN OR
<br />SPECIFIED. EXACT EXTENT OF DEMOLITION MAY NOT BE FULLY INDICATED BY THE
<br />DRAWINGS.
<br />2.2 SALVAGED COMPONENTS:
<br />A. WHERE SHOWN ON DRAWINGS, SALVAGE CONSTRUCTION MATERIALS AND
<br />EQUIPMENT (E.G., LIGHT FIXTURES, DOORS, FRAMES, HARDWARE, ETC.) SUITABLE FOR
<br />REUSE. SALVAGED COMPONENTS SHALL BE CLEANED AND REPAIRED BEFORE REUSING.
<br />B. COORDINATE SALVAGE AND STORAGE OF BUILDING STANDARD CONSTRUCTION
<br />MATERIALS AND EQUIPMENT NOT NECESSARY FOR NEW TENANT CONSTRUCTION WITH
<br />LANDLORD.
<br />2.3 PATCH AND REPAIR:
<br />A. EXISTING CONSTRUCTION WHERE AFFECTED BY DEMOLITION WORK SHALL BE
<br />PROPERLY REMEMBERED, ALIGNED, AND REPAIRED TO LEAVE NO EVIDENCE OF
<br />REMODELING WORK. AREAS AFFECTED OUTSIDE OF TENANT SPACE BY DEMOLITION AND
<br />NEW CONSTRUCTION TO BE REPAIRED SO AS TO LEAVE NO EVIDENCE OF DAMAGE.
<br />INTEGRITY OF NON-TENANT SPACE TO BE MAINTAINED.
<br />B. GENERAL CONTRACTOR SHALL REPAIR ANY FIRE PROOFING DAMAGED DURING THE
<br />COURSE OF DEMOLITION OR CONSTRUCTION SO AS TO MAINTAIN THE ORIGINAL FIRE
<br />RATING.
<br />DIVISION 3 - CONCRETE
<br />A. GENERAL CONTRACTOR TO FURNISH AND INSTALL ALL CONCRETE WORK IN
<br />ACCORDANCE WITH THE “AMERICAN CONCRETE INSTITUTE” (ACI) BUILDING CODE
<br />REQUIREMENTS FOR REINFORCED CONCRETE STANDARD 318-83.
<br />B. CONTRACTOR TO CHECK AND LEVEL CONCRETE FLOOR SURFACE TO A TOLERANCE
<br />NOT EXCEEDING ¼” IN A 10’ - 0” DIAMETER WHEN MEASURED WITH A 10’ - 0” STRAIGHT EDGE.
<br />CONTRACTOR SHALL PATCH AND REPAIR IMPERFECTIONS IN EXISTING CONCRETE SLAB AT
<br />ARCHITECT’S DISCRETION OR AS REQUIRED PRIOR TO INSTALLING FLOOR FINISH PER
<br />MANUFACTURER’S RECOMMENDATIONS. FLOOR SHALL BE LEVEL TO ¼” IN 10’ - 0” DIAMETER
<br />ON A NON-CUMULATIVE BASIS ON ALL AREAS TO RECEIVE STONE OR TILE FLOORING.
<br />DIVISION 6 - WOODWORK AND CABINETRY
<br />6.1 CARPENTRY:
<br />A. GENERAL CONTRACTOR TO FURNISH AND INSTALL ALL WOOD BLOCKING AND OTHER
<br />REINFORCING WHERE INDICATED ON THE DRAWINGS OR WHERE REQUIRED FOR
<br />ADEQUATE SUPPORT OF NEW WORK.
<br />B. ALL WOOD BLOCKING SHALL BE STAMPED "FIRE-RETARDANT" TREATED IN
<br />ACCORDANCE WITH GOVERNING ORDINANCES AND BUILDING CODES.
<br />C. ALL RAISED PLATFORMS MUST BE CONSTRUCTED FROM NON- COMBUSTABLE
<br />MATERIALS.
<br />6.2 ARCHITECTURAL WOODWORK AND CABINETRY:
<br />A. THIS CONTRACTOR TO FURNISH AND INSTALL ALL CUSTOM ARCHITECTURAL
<br />WOODWORK INCLUDING, BUT NOT LIMITED TO:
<br />1. STANDING OR RUNNING TRIM
<br />2. WOOD CABINETS AND HARDWARE
<br />3. DOORS AND HARDWARE
<br />4. WOOD FRAMES
<br />5. SHELVING AND HARDWARE
<br />B. QUALITY AND WORKMANSHIP: ALL MATERIALS AND WORKMANSHIP SHALL BE IN STRICT
<br />ACCORDANCE WITH THE AWS PREMIUM GRADE AS CERTIFIED BY THE WOODWORK INSTITUTE
<br />C. MATERIALS AND FINISHES:
<br />1. MATERIALS AND FINISHES SHALL BE SPECIFIED ON THE DRAWINGS. SAMPLES SHALL
<br />BE SUBMITTED TO ARCHITECT FOR REVIEW AS SPECIFIED IN DIVISION 1 OF THESE
<br />SPECIFICATIONS.
<br />2. WOOD VENEERS TO RECEIVE TRANSPARENT FINISH TO BE PLAIN SLICED AND BOOK
<br />AND END MATCHED, UNLESS OTHERWISE NOTED.
<br />3. MELAMINE COLOR, WHERE SPECIFIED, SHALL BE WHITE AT PLASTIC LAMINATE
<br />MILLWORK AND BLACK AT WOOD VENEER MILLWORK, UNLESS OTHERWISE NOTED.
<br />4. PROVIDE GROMMETS IN COUNTERTOPS ABOVE EACH WALL MOUNTED OUTLET.
<br />GROMMETS TO BE MOCKETT & COMPANY SG SERIES, 1 3/4" HOLE, COLOR BLACK.
<br />5. MILLWORK CABINETS CONSTRUCTION TO BE FLUSH OVERLAY TYPE WITH EUROPEAN
<br />(INVISIBLE) SELF - CLOSING , 170 DEGREE OPENING, HEAVY - DUTY HINGES AND 100 POUND
<br />RATED, FULL EXTENSION SIDE MOUNTED DRAWER SLIDES, UNLESS OTHERWISE NOTED.
<br />JOINTS BETWEEN DOORS AND DRAWERS TO BE 3/32" MAXIMUM WIDTH AND CONSISTENT
<br />THROUGHOUT.
<br />6. SCRIBE COUNTERTOPS AN D SPLASHES TO ADJACENT SURFACES.
<br />7. PROVIDE 1/2" X 1/2" REVEAL WHERE CABINETS MEET ANOTHER SURFACE. REVEAL
<br />COLOR TO MATCH CABINET, UON.
<br />8. MAXIMUM UNSUPPORTED CABINET SHELF WIDTH TO BE 3'-0".
<br />D. SHOP DRAWINGS: CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ARCHITECT’S
<br />REVIEW AS SPECIFIED IN DIVISION 1 OF THESE SPECIFICATIONS.
<br />DIVISION 8 - DOOR, WINDOWS AND GLASS:
<br />8.1
<br />A. THE GENERAL CONTRACTOR SHALL FURNISH AND INSTALL DOORS, FRAMES AND
<br />HARDWARE WHERE SPECIFIED AND DETAILED ON THE DRAWINGS. NEW MATERIALS AND
<br />INSTALLATION OF SAME SHALL MATCH EXISTING WORK EXCEPT WHERE OTHERWISE NOTED.
<br />B. HARDWARE SHALL MATCH EXISTING EXCEPT WHERE SPECIFIED OTHERWISE ON
<br />DRAWINGS. CONTRACTOR TO SUBMIT A FINISH HARDWARE SCHEDULE FOR ARCHITECT'S
<br />REVIEW AND APPROVAL PRIOR TO ORDERING MATERIALS.
<br />C. PROVIDE ¼” MAXIMUM UNDERCUT AT ALL NEW DOORS.
<br />8.2 GLASS AND BORROWED LIGHT PARTITIONS:
<br />A. THE GENERAL CONTRACTOR SHALL FURNISH AND INSTALL ALL GLASS WORK WITH
<br />FRAMES AND HARDWARE AS SPECIFIED AND DETAILED ON THE DRAWINGS. GLASS WORK
<br />EXCEPT WHERE DETAILED OR NOTED OTHERWISE SHALL MATCH EXISTING WORK.
<br />B. ALL GLASS WITHIN 12” OF A DOOR, IN A DOOR, OR WITHIN 18” OF THE FINISHED
<br />FLOOR SHALL BE TEMPERED OR LAMINATED SAFETY GLASS AND LABELED AS SUCH
<br />CLEARLY.
<br />C. SUBMIT SHOP DRAWINGS OF ALL GLASS FRAMING AND GLAZING WORK ALONG WITH
<br />MATERIAL SAMPLES TO ARCHITECT FOR REVIEW PRIOR TO PROCEEDING WITH FABRICATION
<br />WORK.
<br />D. INSTALL TEMPERED GLASS WITH MANUFACTURER’S SEAL LOCATED AT THE LOWER
<br />CORNER OF THE LITE. CONCEAL TONG MARKS, IF ANY.
<br />E. ALL FIRE RATED SAFETY GLAZING SHALL BE “FIRE LITE” FIRE RATED CERAMIC GLASS
<br />AS MANUFACTURED BY TECHNICAL GLASS PRODUCTS, UNLESS OTHERWISE NOTED.
<br />REFER TO DRAWINGS FOR GLASS LITE FIRE RATING.
<br />F. EACH PANE OF SAFETY GLAZING INSTALLED IN HAZARDOUS LOCATIONS SHALL BE
<br />IDENTIFIED BY A MANUFACTURER'S DESIGNATION SPECIFYING WHO APPLIED THE
<br />DESIGNATION, THE MANUFACTURER OR INSTALLER AND THE SAFETY GLAZING
<br />STANDARD. LOCATIONS SPECIFIED IN CBC SECTION 2406.4.1 THROUGH 2406.4.7 SHALL
<br />BE CONSIDERED SPECIFIC HAZARDOUS LOCATIONS REQUIRING SAFETY GLAZING
<br />MATERIALS.
<br />DIVISION 9 - FINISHES
<br />9.1 DRYWALL PARTITIONS:
<br />A. THE GENERAL CONTRACTOR SHALL FURNISH AND INSTALL ALL NEW PARTITION,
<br />SOFFIT, AND CEILING CONSTRUCTION WHERE INDICATED ON THE DRAWINGS. NEW
<br />CONSTRUCTION SHALL MATCH THAT OF EXISTING ADJACENT CONDITIONS, IF APPLICABLE,
<br />EXCEPT WHERE NOTED OTHERWISE ON THE DRAWINGS.
<br />B. ALL NEW PARTITION CONSTRUCTION SHALL BE IN STRICT ACCORDANCE WITH THE
<br />MANUFACTURER'S RECOMMENDATIONS AND SPECIFICATIONS, AND SHALL CONFORM TO
<br />BUILDING STANDARD SPECIFICATIONS WHERE APPLICABLE.
<br />C. THE GENERAL CONTRACTOR SHALL LOCATE AND DESIGNATE ALL NEW AND
<br />REMAINING PARTITIONS AS NOTED ON THE DRAWINGS FOR REVIEW BY ARCHITECT ON SITE
<br />PRIOR TO COMMENCEMENT OF DEMOLITION OR NEW WORK.
<br />D. PARTITIONS SHALL BE PLUMB AND DIMENSIONS SHALL BE WITHIN 1/8” IN 20’ - 0” ALONG
<br />LENGTH OF PARTITIONS. CONTRACTOR SHALL NOT ADJUST DIMENSIONS MARKED “CLEAR”
<br />OR “HOLD” WITHOUT REVIEW BY ARCHITECT.
<br />E. PROVIDE WATER RESISTANT GYPSUM WALL BOARD AT TOILET ROOM PARTITIONS AND
<br />OTHER WET AREAS. PROVIDE TYPE “X” GYPSUM BOARD AT FIRE - RATED ASSEMBLIES.
<br />F. INSTALL GYPSUM WALL BOARD WITH LONG DIMENSIONS PERPENDICULAR TO
<br />FRAMING.
<br />G. NEW AND EXISTING GYPSUM WALL BOARD SHALL BE TAPED AND SANDED WITH NO
<br />VISIBLE JOINTS. SURFACES ARE TO BE FREE OF IMPERFECTIONS AND SHALL HAVE SMOOTH
<br />LEVEL 4 SURFACE READY TO RECEIVE SCHEDULED FINISH. WHERE DEEP TONE PAINT IS
<br />SCHEDULED, SKIM COAT FULL SURFACE OF SUBSTRATE TO LEVEL 5 FINISH. REFERENCE USG
<br />STANDARDS.
<br />H. ALL PENETRATIONS THROUGH FIRE RATED PARTITIONS TO BE PROPERLY FIRE
<br />STOPPED PER CODE.
<br />9.2 CEILINGS SYSTEMS:
<br />A. PATCH AND REPAIR: GENERAL CONTRACTOR TO PATCH AND REPAIR EXISTING CEILING
<br />SYSTEM WHERE AFFECTED BY DEMOLITION OR NEW CONSTRUCTION SO AS TO LEAVE NO
<br />EVIDENCE OF REMODELING WORK.
<br />B. GYPSUM CEILINGS:
<br />1. CEILING SUPPORT SYSTEM SHALL LIMIT DEFLECTION OF
<br />FINISHED CEILING TO LESS THAN 1/260 OF SPAN.
<br />2. ATTACHMENT DEVICES SHALL BE AN APPROVED TYPE,
<br />CAPABLE OF CARRYING FIVE TIMES THE CEILING LOAD OR 100
<br />POUNDS, WHICHEVER IS GREATER.
<br />3. HANGERS SHALL BE PLUMB OR COUNTERSPLAYED AND
<br />SHALL NOT PRESS AGAINST PIPE OR DUCT INSULATION.
<br />4. CARRYING CHANNELS AND MAIN RUNNERS SHALL BE LEVEL
<br />TO WITHIN 1/8 INCHES IN 10'-0".
<br />5. SUSPENSION SYSTEM SHALL NOT BE VISIBLE FROM EYE
<br />LEVEL OF A PERSON STANDING ON THE FLOOR.
<br />C. LAY IN PANEL CEILINGS:
<br />1. SPACE MAIN RUNNERS 4'-0" ON CENTER. LEVEL AND SQUARE TO ADJACENT WALLS
<br />2. SPACE CROSS RUNNERS AT 2'-0" ON CENTER
<br />3. PROVIDE COMPRESSION STRUTS AT SEISMIC WIRE LOCATIONS. COMPRESSION STRUTS
<br />SHALL NOT REPLACE HANGER WIRES.
<br />9.3 RESILIENT BASE:
<br />A. RESILIENT BASE TO BE STRAIGHT AT CARPETING AND COVE AT HARD SURFACE
<br />FLOORING.
<br />B. RESILIENT BASE TO BE INSTALLED IN CONTINUOUS RUNS FROM
<br />120'-0" ROLLS. NO JOINTS SHALL BE WITHIN 12” OF A CORNER.
<br />9.4 CARPET TILE:
<br />A. STORE CARPET TILE AT LEAST 3 DAYS PRIOR TO INSTALLATION IN AREA OF
<br />INSTALLATION TO ACHIEVE TEMPERATURE STABILITY.
<br />1. FOLLOW CRI 104 STANDARD FOR ROOM TEMPERATURE AND HUMIDITY CONDITIONS.
<br />2. MAINTAIN RECOMMENDED CONDITIONS AT LEAST 72 HOURS PRIOR TO INSTALLATION
<br />AND AFTER COMPLETION.
<br />3. DO NOT STACK CARPET TILE BOXES MORE THAN 6 CARTONS HIGH TO AVOID
<br />POTENTIAL CRUSHING.
<br />B. SEQUENCE CARPET TILE INSTALLATION WITH OTHER WORK TO MINIMIZE POSSIBILITY
<br />OF DAMAGE AND SOILING DURING REMAINDER OF CONSTRUCTION PERIOD.
<br />C. CONSISTENCY OF COLOR SHALL BE SUCH THAT ANY TILE SHALL BE
<br />INTERCHANGEABLE WITH ANY OTHER TILE, WITHIN A DYE LOT, WITH NO VISUAL DIFFERENCE.
<br />D. ADHESIVES, IF REQUIRED, TO BE PER MANUFACTURER'S GUIDELINES.
<br />E. SUBFLOOR MUST BE CLEANED, FREE OF DUST, DIRT, GREASE, WAX, PAINT, CURING OR
<br />PARTING AGENTS, OR ANY OTHER SUBSTANCE THAT MAY AFFECT THE BOND. CONCRETE
<br />FLOORS MUST BE LEVEL, FULLY CURED, FREE OF EXCESSIVE MOISTURE EMISSIONS AND
<br />ALKALI. CONCRETE FLOORS WITH A MOISTURE EMISSION RATE EXCEEDING 3.0 lbs / 1,000 SQ.
<br />FT. IN A 24 HOUR PERIOD REQUIRE CORRECTIVE MEASURES.
<br />9.5 BROADLOOM CARPET:
<br />A. FACE YARNS SHALL BE OF SAME DYE BATCH, AND FINISH MATERIAL SHALL BE OF ONE
<br />MILL RUN.
<br />B. WHERE SPECIFIED PROVIDE STANDARD CUSHION: NOVA “CONTRACT” BY LEGGETT &
<br />PLATT, OR EQUAL. WEIGHT: 6.5 POUNDS PER CUBIC FOOT. THICKNESS: 5/16”.
<br />C. TACKLESS CARPET STRIPPING SHALL BE WATER RESISTANT PLYWOOD STRIPS, 3/8” OR
<br />9/32” THICK, AS REQUIRED TO MATCH CUSHION / CARPET THICKNESS, WITH ANGULAR PINS
<br />PROTRUDING FROM TOP FOR GRIPPING AND HOLDING STRETCHED CARPET.
<br />D. SUBFLOOR MUST BE CLEANED, FREE OF DUST, DIRT, GREASE, WAX, PAINT, CURING OR
<br />PARTING AGENTS, OR ANY OTHER SUBSTANCE THAT MAY AFFECT THE BOND. CONCRETE
<br />FLOORS MUST BE LEVEL, FULLY CURED, FREE OF EXCESSIVE MOISTURE EMISSIONS AND
<br />ALKALI. CONCRETE FLOORS WITH A MOISTURE EMISSION RATE EXCEEDING 3.0 lbs / 1,000 SQ.
<br />FT. IN A 24 HOUR PERIOD REQUIRE CORRECTIVE MEASURES.
<br />9.6 PAINTING AND DECORATING
<br />A. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL MATERIALS
<br />AND LABOR AS NECESSARY TO PROVIDE PAINTING AND DECORATING WORK AS SPECIFIED
<br />AND INDICATED ON THE DRAWINGS.
<br />B. ALL WALLS, DRYWALL CEILINGS, DOORS, FRAMES AND WOODWORK SHALL BE FREE
<br />FROM DEFECTS AND BE FILLED AND SANDED SMOOTH PRIOR TO RECEIVING PAINTED
<br />AND/OR NATURAL FINISHES. NEW WORK SHALL BE PRIMED AND PAINTED WITH NOT LESS
<br />THAN ONE PRIME AND TWO FINISH COATS. PREVIOUSLY FINISHED WORK SHALL RECEIVE
<br />NOT LESS THAN TWO FINISH COATS.
<br />C. PAINTING SYSTEM NEW CONSTRUCTION:
<br />1. DRYWALL - 1ST COAT - BENJAMIN MOORE (BM) LATEX QUICK DRY PRIME SEALER II
<br />(201).
<br />a. DRYWALL CEILINGS 2ND & 3RD COAT - "BM" REGAL WALL SATIN LATEX FLAT (215).
<br />REFER TO FINISH PLAN FOR PAINT COLORS.
<br />B. DRYWALL WALLS 2ND & 3RD COAT - "BM" REGAL AQUAPEARL LATEX (310) OR
<br />EGGSHELL. REFER TO FINISH PLAN FOR PAINT COLORS.
<br />C. DRYWALL WALLS 2ND & 3RD COAT IN BATHROOMS, KITCHENS, JANITOR CLOSETS,
<br />ETC. SEMI GLOSS FINISH. REFER TO FINISH PLAN FOR PAINT COLORS.
<br />d. OTHER FINISH COATS AS NOTED ON PLAN.
<br />e. EXISTING CONSTRUCTION ONLY, 2ND & 3RD COAT AS REQUIRED, OR NOTED.
<br />2. MISCELLANEOUS WOOD TRIM - 1ST COAT - BENJAMIN MOORE ALKYD ENAMEL
<br />UNDERBODY (217).
<br />a. 2ND & 3RD COAT - AS NOTED.
<br />B. EXISTING CONSTRUCTION ONLY, 2ND & 3RD COAT AS REQUIRED, OR NOTED.
<br />3. MISCELLANEOUS METAL TRIM - 1ST COAT - BENJAMIN MOORE IRONCLAD RETARDO
<br />RUST INHIBITIVE PAINT (163).
<br />a. 2ND & 3RD COAT - "BM" SATIN IMPERVO (235) OR ALKYD DULAMEL (207) FOR SEMI-
<br />GLOSS FINISH.
<br />B. OTHER FINISH COATS AS NOTED ON PLAN.
<br />C. EXISTING CONSTRUCTION ONLY, 2ND & 3RD COAT AS REQUIRED.
<br />NOTE: IF OTHER PAINT MANUFACTURER IS USED, FOLLOW SAME PRODUCT
<br />SPECIFICATIONS AS SHOWN FOR "BM".
<br />D. UNLESS OTHERWISE NOTED, PREPARE AND PAINT ALL EXPOSED ITEMS INCLUDING
<br />COLUMNS, PANEL BOXES, CONDUIT, SURFACE RACEWAYS, DRAPERY POCKETS, ETC. NOT
<br />PRE-FINISHED TO MATCH ADJACENT PARTITION OR CEILING COLOR.
<br />E. FINISH VERTICAL EDGES OF PAINT GRADE DOORS TO MATCH FACES. SEAL TOP AND
<br />BOTTOM EDGES.
<br />F. PAINT ASTRAGALS AT FIRE RATED DOORS TO MATCH DOOR.
<br />G. ALL SHOP PAINTED WOOD DOORS TO BE PAINTED TO AWI-OP4 SPECIFICATION FOR
<br />SOLID COLORS AND AWI TO VIF-4 FOR CLEAR FINISHES.
<br />9.7 WALL COVERING:
<br />INSTALL WALL COVERING USING MANUFACTURER’S RECOMMENDED ADHESIVE. WALL
<br />COVERING SHALL BE CONTINUOUS BEHIND COUNTERTOPS, CHAIR RAILS, ETC. SEAMS SHALL
<br />BE TIGHT, NEAT, AND NOT LESS THAN 12” FROM CORNERS. DO NOT END WALL COVERING AT
<br />AN OUTSIDE CORNER.
<br />9.8 RESILIENT FLOORING:
<br />THE CONTRACTOR SHALL WAX ALL NEW AND, WHERE OCCURS, EXISTING RESILIENT
<br />FLOORS, UON.
<br />DIVISION 10 - SPECIALTIES
<br />(NOT USED)
<br />DIVISION 11 – EQUIPMENT
<br />
<br />PROVIDE ELECTRICAL AND WATER SYSTEMS REQUIRED FOR A COMPLETE AND
<br />OPERATIONAL INSTALLATION OF ALL APPLIANCES AS SHOWN OR SPECIFIED ON THE
<br />DRAWINGS.
<br />DIVISION 12 – FURNISHINGS
<br />A. FURNITURE IS BY TENANT UNLESS OTHERWISE NOTED. REFER TO POWER AND
<br />SIGNAL PLAN FOR ELECTRICAL REQUIREMENTS.
<br />B. CONTRACTOR SHALL COORDINATE HIS WORK WITH THAT OF THE TENANT’S
<br />FURNITURE VENDOR TO INCLUDE FLOOR CORE LOCATIONS, BASE POWER, AND DATA IN
<br />FEED LOCATIONS.
<br />DIVISION 13 - SPECIAL CONSTRUCTION
<br />(NOT USED)
<br />DIVISION 14 - CONVEYING SYSTEM
<br />(NOT USED)
<br />DIVISION 15 - MECHANICAL
<br />15.1 SCOPE OF WORK
<br />CONTRACTOR SHALL PROVIDE ALL MATERIALS AND LABOR REQUIRED TO PROVIDE A
<br />COMPLETE AND OPERATIONAL HEATING, AIR CONDITIONING, VENTILATION, PLUMBING, FIRE
<br />PROTECTION, AND LIFE SAFETY SYSTEM. CONTRACTOR SHALL VISIT THE PROJECT SITE TO
<br />DETERMINE THE EXACT LOCATIONS AND ELEVATIONS OF EXISTING DUCTWORK, PIPING AND
<br />FIRE PROTECTION EQUIPMENT. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL
<br />OF EXISTING WORK AS NECESSARY TO ACCOMMODATE NEW WORK.
<br />15.2 ENGINEERING DESIGN DOCUMENTS
<br />CONTRACTOR SHALL PREPARE OR CAUSE TO HAVE PREPARED A COMPLETE SET OF
<br />MECHANICAL AND PLUMBING ENGINEERING DRAWINGS AND SPECIFICATIONS.
<br />CONTRACTORS SHALL SUBMIT DRAWINGS AND SPECIFICATIONS TO ARCHITECT FOR REVIEW
<br />AND APPROVAL PRIOR TO COMMENCING WITH NEW WORK. CONTRACTOR SHALL PROVIDE
<br />WET STAMPED AND SIGNED DRAWINGS FOR BUILDING DEPARTMENT PERMIT SUBMISSION.
<br />15.3 ORDINANCES, REGULATIONS AND BUILDING CODES
<br />ALL WORK SHALL BE IN STRICT ACCORDANCE WITH APPLICABLE ORDINANCES,
<br />REGULATIONS AND BUILDING CODES. CONTRACTOR SHALL BE RESPONSIBLE FOR
<br />OBTAINING ALL PERMITS TO PERFORM THIS WORK.
<br />DIVISION 16 - ELECTRICAL
<br />16.1 SCOPE OF WORK
<br />CONTRACTOR SHALL PROVIDE ALL MATERIALS AND LABOR REQUIRED TO PROVIDE A
<br />COMPLETE OPERATIONAL ELECTRICAL SYSTEM. CONTRACTOR SHALL VISIT THE PROJECT
<br />SITE AND VERIFY ALL ELECTRICAL CONDITIONS TO DETERMINE THE EXTENT OF NEW WORK
<br />AND DEMOLITION INVOLVED. CONTRACTOR SHALL REMOVE AND TERMINATE ALL EXISTING
<br />ELECTRICAL, TELEPHONE AND OTHER DEVISES NOT OTHERWISE INDICATED TO REMAIN.
<br />(REFER TO ENGINEER'S DOCUMENTS, IF APPLICABLE.)
<br />16.2 ENGINEERING DESIGN DOCUMENTS
<br />CONTRACTOR SHALL PREPARE OR CAUSE TO HAVE PREPARED A COMPLETE SET OF
<br />ELECTRICAL ENGINEERING DRAWINGS AND SPECIFICATIONS. CONTRACTORS SHALL SUBMIT
<br />DRAWINGS AND SPECIFICATIONS TO ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO
<br />COMMENCING WITH NEW WORK. CONTRACTOR SHALL PROVIDE WET STAMPED AND SIGNED
<br />DRAWINGS FOR BUILDING DEPARTMENT PERMIT SUBMISSION.
<br />16.3 ORDINANCE, REGULATIONS & BUILDING CODES
<br />ALL WORK SHALL BE IN STRICT ACCORDANCE WITH APPLICABLE ORDINANCES,
<br />REGULATIONS AND BUILDING CODES. CONTRACTOR SHALL BE RESPONSIBLE FOR
<br />OBTAINING ALL PERMITS TO PERFORM THIS WORK.
<br />16.5 TELEPHONE/DATA SYSTEMS COORDINATION
<br />CONTRACTOR SHALL COORDINATE HIS WORK WITH THE TENANT'S TELEPHONE AND
<br />COMMUNICATIONS VENDOR PRIOR TO COMMENCING WITH NEW WORK.