Laserfiche WebLink
Page | 5 <br /> <br />3.3) Liability Waiver and Limitations <br /> <br />Our structural calculations are completed assuming all information provided to Ladera Engineering Group is accurate and applicable <br />to this site. For the purposes of calculations, we assume an overall structure condition as erected and all members and connections <br />to be free of corrosion and/or structural defects. The structure owner and/or contractor shall verify the structure’s condition prior to <br />installation of any proposed equipment. If actual conditions differ from those described in this report, Ladera Engineering Group <br />should be notified immediately to assess the impact on the results of this report. <br /> <br />Our evaluation is completed using industry standard methods and procedures. The structural results, conclusions and <br />recommendations contained in this report are proprietary and should not be used by others as their own. Ladera Engineering Group <br />is not responsible for decisions made by others that are or are not based on the stated assumptions and conclusions in this r eport. <br /> <br />This report is an evaluation of the mount structure only and does not determine the adequacy of the supporting structure, oth er <br />carrier mounts or cable mounting attachments. The analysis of these elements is outside the scope of this analysis, are assumed to <br />be adequate for the purpose of this report and to have been installed per their manufacturer requirements. This document is not for <br />construction purposes. <br /> <br />4) ANALYSIS RESULTS <br /> <br />Table 3 - Mount Component Stresses vs. Capacity (Pipe Mount, Critical Sector) <br />Notes Component Critical <br />Member Centerline (ft) % Capacity Pass / Fail <br />1,2 Mount Pipe MP1 96.0 6.0 Pass <br /> <br />Structure Rating (max from all components) = 6.0% <br />Notes: <br />1) See additional documentation in "Appendix C - Software Analysis Output" for calculations supporting the % capacity <br />consumed. <br />2) See additional documentation in “Appendix D – Additional Calculations” for detailed mount connection calculations. <br /> <br />4.1) Recommendations <br />The mount has sufficient capacity to carry the proposed loading configuration. In order for the results of the analysis to be <br />considered valid, the following must be completed. <br />1. All bolts and hardware should be checked for tightness and condition prior to installing the proposed equipment. <br />2. Pursuant to ATT-CEM-24002, the proposed Ericsson AIR equipment in position 2 [from front of mount looking towards <br />building] requires a minimum mount pipe diameter of 2.875” OD. The pipe in this position, per sector, shall be (1) 2.5 STD <br />Pipe x 8’ long (CEQ# ANT.16008 or approved equal) with existing hardware. <br />No structural modifications are required at this time, provided that the above-listed changes are implemented. <br /> <br /> <br /> <br /> <br />