Laserfiche WebLink
client approval <br />principal in charge <br />issues / revisions <br />drawing title <br />scale <br />Sheet No.: <br />E-4 <br />project number <br />date <br />As indicated <br />060825 <br />GARCIA RESIDENCE <br />ADU CONVERSION <br />T 714.305.8928 <br />MARIA GARCIA <br />2058 S OAK ST. <br />SANTA ANA, CA. 92707 <br />Project Address <br />2058 S OAK ST. <br />SANTA ANA, CA. 92707 <br />The ideas and designs represented herein and this drawing, all <br />prepared by BKW STUDIO, are for the use solely with respect to <br />this project and BKW STUDIO shall retain all common law, <br />statutory and other reserved rights including copyright and they <br />shall not be used by others for any other purpose without written <br />permission of BKW STUDIO. <br />Copyright @ 2025 <br />13733 FRANCISCO DR <br />LA MIRADA, CA. 90638 <br />626.272.8479 <br />binhkwong@yahoo.com <br />BKW STUDIO <br />09-10-2025 <br />PANEL SCHEDULE/ <br />LOAD CALCULATION/ <br />SINGLE LINE DIAGRAM/ <br />SERVICE LOAD CALCULATION <br />(N) PANEL LOADS SCHEDULE "P" <br />PANEL LOADS SCHEDULE "M" <br />120/240V-1Ø-3W <br />SINGLE LINE DIAGRAM <br />M <br />2P <br />125A <br />200A <br />(CU., THWN.) <br />2"C-2#1/0+1#6GND. <br />PANEL "P" <br />125A, 120/240V <br />1PH, 3W <br />42KAIC <br />17.7KVA <br />73.7A <br />NEW ADU <br />100A <br />A SURGE PROTECTION DEVICE SHALL BE <br />INSTALLED AT THE SERVICE IN ACCORDANCE TO <br />2022 CEC 230.67(A,B,C AND D)