My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
200 E First American Way-swimming pool - Plan
PBA
>
Building
>
ProjectDox
>
F
>
First American Way
>
200 E First American Way
>
200 E First American Way-swimming pool - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2026 5:00:19 AM
Creation date
5/16/2026 5:00:04 AM
Metadata
Fields
Template:
Plan
Permit Number
20187195
30149452
40140873
101125429
Full Address
200 E First American Way
Street Number
200
Street Direction
E
Street Name
First American
Street Suffix
Way
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SP-1 <br />AREA NOTES <br />· <br />· <br />POOL AND SPA SITE PLAN <br />SITE PLAN, VICINITY <br />MAP AND NOTES <br />PROJECT NAME: <br />DATE: <br />DRAWN BY: <br />SHEET TITLE: <br />SHEET NUMBER: <br />D <br />D DD D <br />D <br />D <br />D <br />MEN'S RR WOMEN'S RR <br />TOILET FACILITIES NOTES <br />SAFETY AND MAINTENANCE NOTES <br />GENERAL NOTES <br />MET <br />PROJECT INFORMATION <br />A <br />N <br />SIGNAGE NOTES <br />° <br />° <br />SCOPE OF WORK <br />· <br />· <br />SCOPE OF WORK <br />Legado at the MET <br />121 S. Beverly Drive, <br /> Beverly Hills, CA 90212 <br />THE METT <br />200 First American Way,HE MET <br /> Santa Ana, CA 92707 <br />DEVELOPER: <br />9/25/2020 100% DD10/05/2020 100% DD <br />10/16/20 CD PLAN CHECK <br /> SUBMITAL SET <br />5/14/2021 PRICING SET <br />VICINITY MAP <br />PROJECT SITE <br />4FT <br />0IN <br />3FT6IN <br />3 FT 6IN <br />3 <br />FT <br />6IN <br />3 <br />FT <br />6IN <br />3 FT 6IN <br />3FT6IN <br />3FT6IN <br />3 FT 6IN <br />3 FT 6IN <br />3FT6IN <br />4FT0IN <br />4FT 0IN <br />4FT 0IN <br />4FT0IN <br />4FT <br />0IN <br />4FT <br />0IN <br />4FT <br />0IN <br />3 <br />FT <br />6IN <br />3FT <br />6IN <br />3FT <br />6IN <br />3FT <br />6IN <br />3FT <br />6IN <br />P <br />P <br />P <br />P <br />P <br />D <br />D <br />D <br />D <br />D <br />D <br />D <br />P <br />P <br />D <br />T <br />T <br />660 <br />100C <br />660 100C <br />710 <br />BUILDING CODE & STANDARDS <br />LIST OF 2022 CALIFORNIA CODE OF REGULATION <br />APPLICABLE CODES AS OF 2022 <br />CALIFORNIA BUILDING CODE <br />CALIFORNIA RESIDENTIAL CODE <br />CALIFORNIA GREEN BUILDING STANDARDS CODE <br />CALIFORNIA MECHANICAL CODE <br />CALIFORNIA ELECTRICAL CODE <br />CALIFORNIA PLUMBING CODE <br />CALIFORNIA BUILDING ENERGY EFFICIENCY STANDARDS <br />2022 <br />NA <br />2022 <br />2022 <br />2022 <br />2022 <br />2022 <br />SCOPE OF WORK <br />SWIMMING POOL AND SPA IN CAVITY <br />EQUIPMENT ROOM ONE LEVEL BELOW POOL AND SPA. <br />PLUMBING TO BE ROUTED BELOW. SUSPENDED FROM PODIUM <br />REINFORCING STEEL PER STRUCTURAL ENGINEER <br />ALL PLUMBING ABOVE AND BELOW GRADE TO BE SCH 40 PVC, <br />CPVC ONLY AT HEATER. <br />ALL POOL/SPA PLUMBING PER CBC SECTION 3115B.3, AND <br />RECIRCULATION PER CBC SECTION 3126B.1 <br />ELECTRICAL UNDERGROUND TO BE 3 <br />4" MIN PVC CONDUIT FOR ALL <br />ELECTRICAL AND BONDING. LOCATE J-BOX IN ADJ PLANTER. ALL <br />RECEPTACLES IN POOL / SPA SHALL BE GFCI PROTECTED <br />SHOTCRETE STRUCTURE - 4,500 PSI, THICKNESS PER <br />STRUCTURAL ENGINEER <br />COPING AND TILE (PER LANDSCAPING SPECS) <br />POOL AND SPA EQUIPMENT PER SPECS PROVIDE ANBEDS FOR <br />ANCHORING ALL EQUIPMENT. PROVIDE BALL VALVES AS <br />NECESSARY FOR ALL CONNECTIONS. PROVIDE TIME CLOCKS <br />FOR CIRC SYSTEM AND LIGHTS. PROVIDE ALL ELECTRICAL <br />CONNECTIONS - FROM PUMPS, HEATERS, CHEMICAL <br />TREATMENT, AND LIGHTS, GFCI BREAKERS BY ELECTRICAL <br />CONTRACTOR. GAS CONNECTIONS ONLY, GAS STUB PROVIDED <br />3 FT FROM HEATER BY PLUMBING CONTRACTOR. WATER <br />SUPPLY, AND BACK FLOW DEVICES FOR POOL AND SPA <br />PROVIDED BY PLUMBING CONTRACTOR, CONNECTION TO <br />AUTO/MANUAL FILL BY POOL CONTRACTOR <br />PROVIDE CHEMICAL CONTROL SYSTEM, METERING PUMPS, <br />CHEMICAL TANKS, ALL TUBING TO BE RAN WITHIN 1" CONDUIT OR <br />PVC FROM TANKS TO RETURN LINE AFTER HEATER <br />PROVIDE ALL ANCHORS WITH BONDING FOR ALL STAINLESS <br />STEEL RAILS AND ACCESSIBLE LIFTS - 1 LIFT FIXED FOR EACH <br />BODY OF WATER <br />PROVIDE WHITE PLASTER FINISH <br />PROVIDE STANDARD POOL AND SPA SIGNAGE BY OTHERS, <br />STANDARD SAFETY EQUIPMENT PER HEALTH REQUIREMENTS - <br />SEE POOL NOTES SP-1 <br />POOL CONTRACTOR TO PROVIDE START-UP. MAINTENANCE FRO <br />2 WEEKS, FOLLOWED BY TRAINING FOR OWNERS SERVICE TEAM <br />COMMUNITY <br />4'-0" <br />3' <br />- <br />5 <br />" <br />1'-6" <br />7" <br />12" <br />1'-6" <br />4" BLACK <br />LETTERING <br />1"-2" BLACK <br />LETTERING <br />HOSPITAL ADDRESS AND PHONE <br />SITE NAME <br />SITE ADDRESS <br />4'-0" <br />3' <br />- <br />5 <br />" <br />1'-6" <br />7" <br />12" <br />1'-6" <br />4" BLACK <br />LETTERING <br />1"-2" BLACK <br />LETTERING <br />HOSPITAL ADDRESS AND PHONE <br />SITE NAME <br />SITE ADDRESS <br />1 <br />STANDARD SIGNAGE FOR POOL <br />BUILDING CODE & STANDARDS <br />POOL AND SPA <br />STRUCTURAL <br />ENGINEERING <br />DETAILS - SEE <br />SP-8 <br />(SP-7 CAVITY PLAN) <br />(SP-8) <br />(SP-2 AND SP-3) <br />(SP-8) <br />(Sp-4) <br />(SP-5) (SP-11) <br />(SP-6) <br />(SP-5). <br />(SP-4, SP-6, SP-9) <br />637 SQ FT , 17,910 GALLONS/ SPA 130 SQ FT, 2344 GALS. <br />31'-10 <br />" <br />12'-9" <br />14'-0" <br />36 <br />' <br />- <br />1 <br />0 <br />" <br />27 <br />' <br />- <br />6 <br />" <br />CLASS: B/C-53 <br />EXPIRES: 12-31-2 <br />Signature Date <br />6 <br />27439 BOSTIK CT. <br />TEMECULA, CA 92590 <br />P(951)296-3939 F(951)296-3945 <br />LICENSE# CA-326760 <br />2-25-2026 <br />2022 2022 2022 2022 <br />2022
The URL can be used to link to this page
Your browser does not support the video tag.