Laserfiche WebLink
RY <br />.. <br />LD106 <br />4287 <br />10/16/2020 <br />1 08-14-2020 <br />TH <br />E <br /> <br />M <br />E <br />T <br />20 <br />0 <br /> <br />F <br />i <br />r <br />s <br />t <br /> <br />A <br />m <br />e <br />r <br />i <br />c <br />a <br />n <br /> <br />W <br />a <br />y <br />, <br /> <br />S <br />a <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />7 <br />fo <br />r <br />Le <br />g <br />a <br />d <br />o <br /> <br />a <br />t <br /> <br />t <br />h <br />e <br /> <br />M <br />E <br />T <br />12 <br />1 <br /> <br />S <br />. <br /> <br />B <br />e <br />v <br />e <br />r <br />l <br />y <br /> <br />D <br />r <br />i <br />v <br />e <br />, <br /> <br />B <br />e <br />v <br />e <br />r <br />l <br />y <br /> <br />H <br />i <br />l <br />l <br />s <br />, <br /> <br />C <br />A <br /> <br />9 <br />0 <br />2 <br />1 <br />2 <br />50% DD SET <br />POOL AREA <br />SECTIONS & <br />DETAILS <br />Description DateIssue <br />Landscape Architecture <br />24013 Ventura Blvd. Suite 201 <br />Calabasas, CA 91302 <br />p 818.251-9718 f 818.251-9719 <br />Design Works <br />Date <br />Drawn By <br />Sheet Title <br />Job No. <br />Sheet No. <br />of Sheet <br />2 10-5-2020100% DD SET <br />POOL PLASTER <br />POOL SHELL <br />PER POOL CONTRACTOR <br />STANDARD PRECAST <br />SAFETY POOL COPING <br />COLOR: LIGHT GRAY <br />12" <br />1 1/2" <br />SLOPE 1 <br />4" / FT. <br />1" STYROFOAM EXP. JOINT <br />EXPANSION JOINT <br />WITH SAND FINISHED <br />CAULK / SEALANT <br />CONCRETE <br />DECK SLIP-RESISTANT <br />STRUCTURAL PODIUM SLAB <br />WATERPROOFING <br />CRECK ISOLATION <br />MEMBRANE <br />WATERLINE TILE: <br />3" SQ. x 2 ROWS OR <br />3"x 6" ONE ROW <br />ON-STRUCTURE POOL COPING <br />4" <br />10 1/2" <br />FOAM FILL <br />3 <br />3 10-16-2020CD PLAN CHECK <br />SUBMITTAL SET <br />5' <br />- <br />0 <br />" <br />GLASS POOL ENCLOSURE <br />GLASS PANEL <br />SIZE PER MANUF. <br />STAND-OFF MOUNT <br />ANCHORS PER <br />GLASS ENCL. MANUF. <br />VERIFY <br />2" <br /> <br />M <br />A <br />X <br />. <br />2" MAX. GLASS PANEL GAP <br />GLASS POOL ENCLOSURE ON WALL <br />POOL <br />WALL w/ <br />FENCE <br />FS <br />GLASS POOL ENCLOSURE <br />GLASS PANEL <br />SIZE PER MANUF. <br />STAND-OFF MOUNT <br />ANCHORS PER <br />GLASS ENCL. MANUF. <br />GLASS POOL ENCLOSURE GLASS PANELS <br />SIZE AND MOUNT ANCHORS PER MANUFACTURE. <br />SECTION <br />ELEVATION <br />POOL DECK <br />STRUCTURAL SLAB <br />SEE STRUCTURAL <br />PLANS <br />1GLASS ENCLOSURE AND GATE <br />11 <br />2" <br />3'-6"24" MIN. <br />VARIES <br />10 <br />" <br />5' <br />- <br />0 <br />" <br />6"6" <br />3' <br />- <br />6 <br />" <br />STAND-OFF MOUNT ANCHORS <br />PER GLASS ENCL. MANUF. <br />PANEL PER MANUF. RECOMMENDATION <br />LEVER LOCKSET. KEY REQUIRED FOR <br />ENTRY ON OUTSIDE OF GATE <br />SELF-LATCHING PANIC HARDWARE ON <br />INSIDE OF GATE <br />GLASS POOL ENCLOSURE GLASS PANEL <br />SIZE PER MANUF. <br />3" SQ. GATE POST with METAL CAP <br />2" SQ. METAL POST with METAL CAP <br />POOL WALL <br />FENCE POST TO STRUCTURAL SLAB-SEE <br />STRUCTURAL PLANS FOR BASE PLATE <br />MOUNTING DETAIL. <br />METAL KICKPLATE PER ADA REQTS. <br />LOCATE ON PUSH SIDE OF GATE <br />GLASS POOL ENCLOSURE GLASS PANELS <br />SIZE AND MOUNT ANCHORS PER MANUFACTURER. <br />SELF-CLOSING HINGES <br />2"X 1 1 <br />2" GATE FRAME <br />2 <br />6" <br />5' <br />- <br />0 <br />" <br />VA <br />R <br />I <br />E <br />S <br />6" <br />5- <br />1 <br />/ <br />2 <br />" <br />TOPPING SLAB <br />STRUCTURAL SLAB <br />2' <br />- <br />6 <br />" <br />PLANTER WALL <br />PLANTER WALL WATERPROOFING, <br />SIDES & BOTTOM TYP. <br />RAMP <br />GLASS POOL ENCLOSURE <br />4'-0"POOL DECK <br />PLANTER BACKFILL. <br />SEE SPEC. <br />PLANTER BACKFILL. <br />SEE SPEC. <br />FOAM FILL PER <br />STRUCTURAL ENG. <br />F.F. 72.00 <br />RAMP SECTION <br />3 <br />LD105 <br />42" PLANTER WALL ON <br />STRUCTURE <br />1 <br />LD106 <br />GLASS POOL <br />ENCLOSURE ON WALL <br />4 <br />LD105 <br />PERIMETER POOL WALL <br />C <br />10 <br />' <br />- <br />0 <br />" <br />3' <br />- <br />6 <br />" <br />4' <br />- <br />6 <br />" <br />3' <br />- <br />0 <br />" <br />5 6 <br />APOOL AREA SECTION <br />5' <br />- <br />0 <br />" <br />7 <br />5' <br />- <br />0 <br />" <br />10 <br />' <br />- <br />0 <br />" <br />13'-8" <br />4 <br />10'- <br />0 <br />" <br />2' <br />- <br />6 <br />" <br />SWIMMING POOL <br />3 <br />LD105 <br />PLANTER WALL <br />4 <br />LD105 <br />PERIMETER WALL <br />AT POOL AREA <br />1 <br />LD106 <br />POOL FENCE <br />SPA <br />3 <br />LD106 <br />ON-STRUCTURE POOL <br />COPING <br />L-101 <br />5' <br />30 <br />" <br />5 6 <br />BRAMP SECTION AT POOL AREA <br />6" <br />7 <br />5' <br />- <br />0 <br />" <br />8'-10" <br />4 POOL FENCE <br />POOL GATE <br />SELF-CLOSING, <br />SELF-LATCHING w/ <br />PANIC HARDWARE <br />30' RAMP 1:12 MAX SLOPE 24' RAMP 1:12 MAX SLOPE6'-5"8'-8" <br />FS <br />XX <br />00 <br />PLANTER GAP <br />AT BLDG <br />3 <br />LD105 <br />GLASS POOL <br />ENCLOSURE ON WALL <br />2 <br />LD106 <br />4 <br />LD105 <br />PERIMETER WALL <br />AT POOL AREA <br />1 <br />LD106 <br />POOL FENCE <br />2' <br />- <br />0 <br />" <br />FOAM FILL PER STRUCT. ENGR <br />STRUCTURAL SLAB <br />RAMP PAVING <br />L-103 <br />• Tempered Glass Panels <br />• Surface Mount or Core Mount Clamps <br />• Rubber Gaskets <br />• Metal Pressure Plates <br />• Dress Rings or Cover Plates <br />• Gate Hinges <br />• Gate Latch <br />• Tape Measure <br />• Chalk Line or String Line <br />• Masking Tape <br />• Spirit Level <br />• Shims (Plastic or Metal) <br />• Wood Setting Blocks <br />Provided by Aquaview: <br />MATERIALS TOOLS REQUIRED <br />Provided by Installer: <br />• Cordless Drill <br />• Hammer Drill <br />• Loctite <br />• Core Driller <br />• Non-Shrink Grout <br />• Bucket for Mixing Grout <br />• Sponge <br />• Hammer + Chisel <br />• Allen Key Set <br />• Suction Cups or <br />Glass Handling Gloves <br />• Mats or Blankets <br />• Glass Cleaner & Cloth <br />SURFACE MOUNT APPLICATIONS <br />• Set Square <br />• Woodworking Clamps <br />• Optional: DIY Wood Glass <br />Supports (see pg. 5) <br />www.aquaviewfencing.com | 877-229-7034 | sales@aquaviewfencing.com <br />• Anchor Bolts (Stainless Steel)NOTE: Installer provides anchor bolts <br />for surface mount clamps. <br />INSTALLATION GUIDE <br />Frameless Glass Pool Fencing <br />CORE MOUNT APPLICATIONS <br />Longer anchors are OK as long as the wedge tip of <br />the anchor is still within the concrete slab. <br />Square Clamps (x2): 3/8" Screw Anchors or 1/2" Wedge Anchors <br />Round Clamps (x4): 1/4" Screw Anchors or 3/8" Wedge Anchors <br />Use lag screws for wood mount applications <br />SURFACE MOUNT - SQUARE <br />Height: 6-1/2” (170mm) <br />Base: 2” x 5-1/8” (50mm x 130mm) <br />CORE MOUNT - SQUARE <br />SURFACE MOUNT - ROUND <br />CORE MOUNT - ROUND <br />Rubber Gasket <br />Metal Pressure Plate <br />www.aquaviewfencing.com | 877-229-7034 | sales@aquaviewfencing.com <br />INSTALLATION GUIDE <br />CLAMP HARDWARE <br />MOVING & STORING GLASS <br />• Inspect the panels upon delivery - if there are any chips or damages, notify Aquaview immediately. <br />• Glass should be stored in dry conditions, in an upright position with slight angle. <br />• Do not put glass bottom edge directly on the ground. Always ensure panels sit on rubber or wood. Do not allow <br /> glass to come in contact with concrete, tiles, or any hard surface. <br />• When lifting glass, it should be kept in the upright position. <br />• Wear protective equipment including suitable gloves, steel capped boots and safety glasses. <br />Height: 7-1/2” (190mm) <br />Base: 3-3/4” (95mm) diameter <br />Height: 10-5/8” (270mm) <br />Diameter: 2” (50mm) with 3-1/2” (89mm) dress ring <br />Height: 11-13/16” (300mm) <br />Diameter: 2” (50mm) with 3-1/2” (89mm) dress ring <br />Internal screw must be secured with Loctite before install. <br />INSTALLATION GUIDE <br />www.aquaviewfencing.com | 877-229-7034 | sales@aquaviewfencing.com <br />SURFACE PREPARATION <br />STONE / TILE <br />If there is concrete underneath, proceed as normal. If not, see below. <br />WOOD <br />Ensure the clamps are attaching to structural elements of your deck, and there is at least 4” of wood to lag screw into. <br />Fixing wood blocking between joists underneath your deck allows the clamp to be mounted to structural <br />elements of your deck – ie bearers and joists. Decking boards alone are not structural, nor are free-fl oating blocks of <br />wood under each clamp location! Alternatively, you can also pour concrete footings underneath the deck. <br />HOW TO LEVEL & PLUMB GLASS <br />CONCRETE FOOTINGS <br />Needed if surface is pavers over sand, or grass/dirt <br />A) 12” wide x 18” deep continuous curb, or <br />B) 12” diameter x 18” deep sonotube “piers” at each clamp location <br />Use concrete 3000psi or stronger. Let the footing cure completely. <br />Then install core mount or surface mount clamps as if the footing <br />were existing concrete. Do not set core clamps into a wet pour, or <br />they will shift! If fi xing to pavers, you will need to pour a concrete <br />footing underneath and re-cement pavers to footing. <br />• With glass fencing, the small details matter. The job is not fi nished until you <br /> ensure all panels are aligned, spacing is even (typically 1” between panels), <br /> and the tops of all panels are level. <br />• Check the horizontal and vertical level of each panel. Make adjustments <br /> if needed. <br />• Use plastic shims (not supplied) for minor height adjustments. Place shim in <br /> the “seat” of the clamp under the glass panel to raise it until height is <br /> consistently level across the tops of all panels. <br />• Vertical alignment can be adjusted by tightening either the top or bottom <br /> grub screw. Shims can also be inserted on respective side to adjust glass tilt. <br />CMU BLOCK WALL <br />Only possible if wall is strong enough to support the weight of the glass. It cannot be hollow. Every cell in the wall <br />must be fi lled with solid concrete 4000psi. <br />CONCRETE SLAB <br />Slab should be at least 4” thick, with concrete 3000psi or stronger. If installing clamps near slab edge, distance between <br />clamp and edge of slab should be at least 6” to avoid cracking. <br />Note: with core mount clamps, you may end up core drilling all the way through the slab into the dirt. This is OK. <br />Important! Check - is the surface even and <br />level? When you measure the layout, make <br />sure to measure changes in elevation too. <br />UNEVEN SURFACES <br />If signifi cant, Aquaview can cut sloped <br />panels (please notify in advance). If minor, <br />use shims under glass. Core clamps are also <br />recommended, as they allow more fl exibility. <br />• Mark the centerline of proposed glass fence with a chalk line. Mark out <br /> the panel sizes based on the project CAD drawing, including panel spacing. <br />• Mark the clamp locations. <br />• Use the clamp as a template to mark out the position of the holes and drill <br /> to suit. (Note: Square clamps have 2 holes, and Round clamps have <br /> 4 holes.) <br />• Check level of fl oor. If needed, plumb with shims under the base plates <br /> before anchoring (shims supplied by Installer). <br />• Drill a pilot hole, then secure clamps with wedge anchors or lag bolts, <br /> depending on ground surface (anchors supplied by Installer). <br />• We suggest installing a clamp at each end of a straight run and then use a <br /> string line to set the clamp heights in between. <br />• It is important to position clamps in the correct line as plumb as possible <br /> to minimize glass adjustment. <br />• Round clamps only: slip cover plate over clamp <br />• Insert glass into the clamps. First, line clamp opening with rubber gasket. <br /> Gently lower glass panel into the clamp, now lined with the rubber gasket. <br /> Insert metal pressure plate between the rubber and the inside of clamp. <br />• Tighten glass in place with an allen key. Ensure there is rubber between the <br /> glass and metal; at no stage should the glass touch metal. <br />INSTALLATION GUIDE <br />SURFACE MOUNT INSTRUCTIONS <br />1 <br />2 <br />3 <br />4 <br />5 <br />www.aquaviewfencing.com | 877-229-7034 | sales@aquaviewfencing.com <br />• Ensure all panels are aligned and spacing between panels is even. Check the horizontal and vertical level <br /> of each panel, making adjustments if needed. <br />• For minor height adjustments, use plastic shims (not supplied). Place shim in the “seat” of <br /> the clamp under the glass panel to raise it until height is consistently level across the tops of all panels. <br />• Vertical alignment can be adjusted by tightening either the top or bottom grub screw. Shims can also be <br /> inserted on respective side to adjust glass tilt. <br />• Mark the centerline of proposed glass fence with a chalk line. Mark out the <br /> panel sizes based on the project CAD drawing, including panel spacing. <br />• Mark the clamp locations for core drilling. <br />• Core drill a 2-3/4” (70mm) diameter hole at 3-15/16” (100mm) deep <br /> for square clamps, or 5-5/8” (143mm) for round clamps. <br />• Must ensure no wiring or underground pipe will be a ected. <br />• Remove the core and clean any excess water and concrete which may <br /> obstruct clamp. <br />• Check level of fl oor to determine the height of each clamp. <br />• We suggest installing a clamp at each end of a straight run and then use a <br /> string line to set the clamp heights in between. <br />• It is important to position clamps in the correct line as plumb as possible to <br /> minimize glass adjustment. <br />• Mix the grout in a small container. Position the clamp in the hole <br /> using a small timber wedge. Pour grout to fi ll 3/4 of the hole. <br />• Hold for approximately 15 minutes until the clamp is fi rm. <br />• Clean any excess with a wet sponge while the grout is wet. <br />• When removing the timber wedges top up core holes with grout. <br />• Slip dress ring over clamp once installed. Secure with silicone. <br />• Insert glass into the clamps. First, line clamp opening with rubber gasket. <br /> Gently lower glass panel into the clamp, now lined with the rubber gasket. <br /> Insert metal pressure plate between the rubber and the inside of clamp. <br />• Tighten glass in place with an allen key. Ensure there is rubber between the glass <br /> and metal; at no stage should the glass touch metal. <br />The following procedure is done one hole at a time. <br />www.aquaviewfencing.com | 877-229-7034 | sales@aquaviewfencing.com <br />INSTALLATION GUIDE <br />CORE MOUNT INSTRUCTIONS (METHOD A) <br />• Ensure all panels are aligned and spacing between panels is even. Check the horizontal and vertical level <br /> of each panel, making adjustments if needed. <br />• For minor height adjustments, use plastic or aluminum shims (not supplied). Place shim in the “seat” of <br /> the clamp under the glass panel to raise it until height is consistently level across the tops of all panels. <br />• Vertical alignment can be adjusted by tightening either the top or bottom grub screw. Shims can also be <br /> inserted on respective side to adjust glass tilt. <br />1 <br />2 <br />3 <br />4 <br />5 <br />• Mark the centerline of proposed glass fence with a chalk line. Mark out the <br /> panel sizes based on the project CAD drawing, including panel spacing. <br />• Mark the clamp locations for core drilling. <br />• Core drill a 2-3/4” (70mm) diameter hole at 3-15/16” (100mm) deep <br /> for square clamps, or 5-5/8” (143mm) for round clamps. <br />• Must ensure no wiring or underground pipe will be a ected. <br />• Remove the core and clean any excess water and concrete which may <br /> obstruct clamp. <br />• Check level of fl oor to determine the height of each clamp. <br />• Before installing clamps into core holes, fi t them onto the glass. With glass laying <br /> fl at, slip clamps on using the correct spacing. Ensure clamps are lined with the <br /> rubber gasket so glass and metal do not touch. Insert the metal pressure plate <br /> between the rubber and inside of clamp and tighten using an allen key. <br />• Check that clamps have been attached straight by using a setsquare. <br />• Slide dress ring onto clamp and secure to panel with masking tape. <br />• Place wood setting blocks (~2” tall) under each panel location. Gently lower the <br /> panel into the holes. The bottom of the glass should rest on the setting blocks. <br />• Insert the next panel the same way. <br />• Use woodworking clamps to secure tops of panels together. <br />• To ensure panels stay in position, brace them using DIY wood glass supports <br /> (two wood boards in L-shape, with slot for glass). <br />• Insert all remaining panels in the run using the same method. <br />www.aquaviewfencing.com | 877-229-7034 | sales@aquaviewfencing.com <br />INSTALLATION GUIDE <br />CORE MOUNT INSTRUCTIONS (METHOD B) <br />1 <br />2 <br />3 <br />• Mix the grout in a small container. Pour grout into core holes <br /> around clamps and hold for approximately 15 minutes until the <br /> clamp is fi rm. Clean any excess with a wet sponge while the grout <br /> is wet. Once grout is set, remove wood blocking and braces and <br /> repeat along the next run. <br />• Remove masking tape and slide dress rings down to bottom of <br /> clamps. Secure with silicone. <br />www.aquaviewfencing.com | 877-229-7034 | sales@aquaviewfencing.com <br />INSTALLATION GUIDE <br />CORE MOUNT INSTRUCTIONS (METHOD B) <br />• Ensure all panels are aligned and spacing between panels is even. Check the <br /> horizontal and vertical level of each panel, making adjustments if needed. <br />• For minor height adjustments, use plastic shims (not supplied). Place shim in the <br /> “seat” of the clamp under the glass panel to raise it until height is consistently level <br /> across the tops of all panels. <br />• Vertical alignment can be adjusted by tightening either the top or bottom grub <br /> screw. Shims can also be inserted on respective side to adjust glass tilt. <br />4 <br />5