Laserfiche WebLink
DATE: <br />DRAWN BY: <br />SHEET TITLE: <br />SHEET NUMBER: <br />SP-5 <br />EQUIPMENT ROOM <br />LAYOUT, LIST AND <br />SCHEMATIC <br />OUT EQUIPMENT NOTES <br />SPA EQUIPMENT SCHEMATICPOOL EQUIPMENT SCHEMATIC <br />PROJECT NAME: <br />THE METT <br />200 First American Way,HE MET <br /> Santa Ana, CA 92707 <br />DEVELOPER: <br />Legado at the MET <br />121 S. Beverly Drive, <br /> Beverly Hills, CA 90212 <br />9/25/2020 100% DD10/05/2020 100% DD <br />10/16/20 CD PLAN CHECK <br /> SUBMITAL SET <br />SPA EQUIPMENT LIST <br />POOL EQUIPMENT LIST <br />POOL AND SPA EQUIPMENT ROOM LAYOUT <br />POOL <br />ABOVE <br />SPA <br />ABOVE <br />IN <br />3" <br /> <br />M <br />A <br />I <br />N <br /> <br />D <br />R <br />A <br />I <br />N <br />SU <br />C <br />T <br />I <br />O <br />N <br />3" <br /> <br />S <br />K <br />I <br />M <br />M <br />E <br />R <br /> <br /> <br />S <br />U <br />C <br />T <br />I <br />O <br />N <br />PRESSURE AND <br />VACUUM GAUGES <br />TYP. <br />A vacuum gauge should be installed on the drain port under the strainer basket of the pump. The gauge may also be <br />installed on the pipe after all suction pipes merge before entering the pump. The gauge should not be installed on the <br />port near the impeller; this would measure the pressure not the vacuum. <br />A pressure and vacuum gauge shall be provided for each pump system. Each gauge shall have a scale range <br />approximately 1 ¼ times the maximum anticipated working pressure or vacuum and shall be accurate within 2 percent <br />of scale. The pressure gauge located on the filter shall be marked with the clean start up pressure reading. (3125B.2) <br />IN <br />3" <br /> <br />M <br />A <br />I <br />N <br /> <br />D <br />R <br />A <br />I <br />N <br />SU <br />C <br />T <br />I <br />O <br />N <br />3" <br /> <br />S <br />K <br />I <br />M <br />M <br />E <br />R <br /> <br /> <br />S <br />U <br />C <br />T <br />I <br />O <br />N <br />ALL PLUMBING ROUTING IN GARAGE TO BE CPVC SCH 40 PPE AND <br />CPVC SCH 80 FITTING,ONLY. ALL PLUMBING WITHIN THE POOL AND SPA <br />AND IN THE POOL EQUIPMENT ROOM TO BE SCH 40 PVC PIPE AND FITTINGS. <br />PROVIDE PRESSURE GAUGES ON EACH PUMP LOCATE ON EACH PUMP. <br />ALL PUMPS - CIRC AND JET PUMPS <br />ALL PUMPS <br />20 GALLON 20 GALLONPOOL AND SPA EQUIPMENT ROOM LAYOUTA <br />CHEMICAL CLASSIFICATION FORM <br />B CHEMICAL TANK INFO <br />C <br />D <br />E <br />DATE: <br />DRAWN BY: <br />SHEET TITLE: <br />CONTRACTOR'S LICENSE <br />NO. 326760, CLASS C-53 <br />MISSION POOLS <br />22600-E LAMBERT ST. <br />SUITE 1104 <br />LAKE FOREST, CA 92630 <br />(949) 588-0899 <br />SHEET NUMBER: <br />SP-5 <br />EQUIPMENT ROOM <br />LAYOUT, LIST AND <br />SCHEMATIC <br />OUT EQUIP <br />SPA EQUIPMENT SCHEMATICPOOL EQUIPMENT SCHEMATIC <br />200 First American Way, <br /> Santa Ana, CA 92707 <br />DEVELOPER: <br />Legado at the MET <br />121 S. Beverly Drive, <br /> Beverly Hills, CA 90212 <br />5/14/2021 PRICING SET <br />BACHWASH RECEPTACLE <br />(1) WHISPERFLO 2HP 3-PHASE PUMP <br />011643 WFK-8 208-230-460 7.5 AMPS = 106 GPM <br /> (PENTAIR): <br />40 <br />20 <br />SPA EQUIPMENT LIST <br />(1) WHISPERFLO 2HP 3-PHASE PUMP <br />(2) 011642 WFK-6 208-230V 6.4 AMP = 98 GPM EACH.. <br />(2) WHISPERFLO 1.5 HP 3 PHASE PUMPS <br />011643 WFK-8 208-230-460 7.5 AMPS = 106 GPM <br />(PENTAIR) <br />(PENTAIR) <br />CLASS: B/C-53 <br />EXPIRES: 12-31-2 <br />Signature Date <br />6 <br />27439 BOSTIK CT. <br />TEMECULA, CA 92590 <br />P(951)296-3939 F(951)296-3945 <br />LICENSE# CA-326760 <br />2-25-2026