Laserfiche WebLink
THESE PLANS ARE THE PROPERTY OF IDS GROUP INC., AND ARE NOT TO BE USED <br />FOR ANY OTHER THAN THE LOCATION SHOWN HEREON. <br />1. NO CHANGES ARE TO BE MADE ON THESE PLANS WITHOUT THE KNOWLEDGE OR <br />CONSENT OF THE ARCHITECT OR ENGINEER WHOSE SIGNATURE APPEARS <br />HEREON. <br />2. DO NOT SCALE DRAWINGS. ALL DIMENSIONS ARE TO FACE OF CONCRETE, FACE <br />OF CONCRETE MASONRY UNITS, CENTERLINE OF COLUMNS AND BEAMS, OR FACE <br />OF STUDS, UNLESS OTHERWISE NOTED. FINISH FLOOR ELEVATIONS ARE TO TOP <br />OF CONCRETE SLAB OR TOP OF INTERIOR PAVING UNLESS OTHERWISE NOTED. <br />3. NO SUBSTITUTIONS WILL BE ALLOWED WITHOUT PRIOR WRITTEN APPROVAL. <br />REQUEST FOR SUBSTITUTIONS SHALL BE IN ACCORDANCE WITH SECTION 01 25 00 <br />OF SPECIFICATIONS. <br />A. THESE DRAWINGS DO NOT CONTAIN THE NECESSARY COMPONENTS FOR <br />CONSTRUCTION SAFETY. <br />B. ALL CONSTRUCTION SHALL BE PERFORMED IN ACCORDANCE WITH THE STATE <br />CONSTRUCTION SAFETY ORDERS ENFORCED BY THE STATE DIVISION OF <br />INDUSTRIAL SAFETY. <br />1. CONTRACTOR FOR THE PROJECT SHALL BE RESPONSIBLE FOR OBTAINING ALL <br />REQUIRED BUILDING PERMITS PRIOR TO COMMENCING WORK. <br />2. THE CONTRACTOR SHALL ENSURE THAT ALL WORK IS DONE IN A PROFESSIONAL <br />WORK-MAN-LIKE MANNER BY SKILLED MECHANICS AND SHALL REPLACE ANY <br />NEW AND/OR EXISTING MATERIALS OR ITEMS INDICATED TO REMAIN DAMAGED <br />BY ANY CAUSE DURING CONSTRUCTION. <br />3. THE CONTRACTOR AND/OR SUBCONTRACTOR SHALL, PRIOR TO THE <br />SUBMISSION OF HIS BID OR PERFORMANCE OF WORK, NOTIFY THE OWNER OF <br />ANY WORK CALLED OUT ON THE DRAWINGS OR IN THE SPECIFICATIONS IN HIS <br />TRADE THAT CANNOT BE FULLY GUARANTEED OR WARRANTED FROM <br />DEFECTIVE WORKMANSHIP OR MATERIAL DEFECTS. <br />4. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IF DETAILS ARE CONSIDERED <br />UNSOUND, UNSAFE, NOT WATERPROOF, OR NOT WITHIN CUSTOMARY TRADE <br />PRACTICE. IF WORK IS PERFORMED, IT WILL BE ASSUMED THAT THERE IS NO <br />OBJECTIONS TO THE DETAIL. DETAILS ARE INTENDED TO SHOW END RESULT OF <br />DESIGN, MINOR MODIFICATIONS MAY BE REQUIRED TO SUIT JOB CONDITIONS <br />AND CURRENT TRADE PRACTICE AND SHALL BE INCLUDED AS PART OF THIS <br />PROJECT. <br />5. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FINISHES AT POINT OF <br />CONNECTIONS FOR ALL WORK (ARCHITECTURAL, STRUCTURAL, MECHANICAL <br />AND ELECTRICAL) FINISHES WILL MATCH THOSE SPECIFIED OR EXISTING IN LINE, <br />TEXTURE AND FINISH. SPOT PAINTING IS NOT ACCEPTABLE. NEW FINISHES <br />SHALL BE FROM CORNER TO CORNER, FLOOR TO CEILING, ETC. <br />6. UNLESS OTHERWISE NOTED, ALL MATERIALS SHALL BE NEW AND OF GOOD <br />QUALITY. WHERE EXISTING MATERIALS ARE INDICATED TO BE SALVAGED, <br />CONTRACTOR SHALL INVENTORY, CLEAN,BOX PROTECT, AND STORE ITEMS FOR <br />REUSE ON THE PROJECT. ITEMS NOT REUSED SHALL BE RETURNED TO OWNER. <br />7. COORDINATION: THE GENERAL AND EACH SUB CONTRACTOR SHALL BE <br />RESPONSIBLE FOR VERIFICATION AND COORDINATION WITH OTHER SUB <br />CONTRACTORS TO ASSURE COMPLIANCE WITH DRAWINGS AND <br />SPECIFICATIONS, AND THE ACCURATE LOCATION OF ARCHITECTURAL, <br />STRUCTURAL, MECHANICAL AND ELECTRICAL BUILDING ELEMENTS. THEIR <br />REQUIRED OPENINGS CLEARANCES SUPPORT SYSTEMS ARE ALL <br />INTERCONNECTED AND COORDINATED. <br />8. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK OF ALL <br />TRADES AND FOR BEING AWARE OF ALL CONDITIONS THAT AFFECT THEIR WORK. <br />NOTIFY OWNER, IN WRITING, WITHIN 3 WORKING DAYS OF AWARD OF CONTRACT, <br />OF THE PROPOSED DELIVERY SCHEDULE, OF ANY EQUIPMENT, FINISHES OR <br />MATERIAL, FOR WHICH THAT SCHEDULE WILL PREVENT THE INSTALLATION FROM <br />BEING COMPLETED AT THE TIME OF THE SCHEDULED PROJECT COMPLETION. <br />9. COORDINATION OF WORK: <br />10. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS OF <br />EXISTING SITE PRIOR TO BIDDING AND START OF CONSTRUCTION. THE <br />CONTRACTOR SHALL REPORT TO THE ARCHITECT ALL CONDITIONS WHICH <br />PREVENT THE PROPER EXECUTION OF ITS WORK. THE DRAWINGS SHALL NOT <br />BE SCALED. <br />11. CONSTRUCTION SHALL COMPLY WITH APPLICABLE EDITION OF CALIFORNIA <br />BUILDING CODE, ALL APPLICABLE LOCAL, STATE AND FEDERAL CODES, <br />ORDINANCES, LAWS, REGULATIONS AND PROTECTIVE COVENANTS GOVERNING <br />THE WORK. IN CASE OF CONFLICTING INFORMATION, THE MORE STRINGENT <br />REQUIREMENT SHALL GOVERN. <br />12. GENERAL CONTRACTOR TO ARRANGE INSPECTIONS AT APPROPRIATE <br />INTERVALS. CONTRACTOR TO INCLUDE CONSTRUCTION MANAGER BY NOTIFYING <br />AT LEAST 36 HOURS AHEAD OF THE CITY INSPECTION TIME. <br />13. ALL CONTRACTOR'S WORK SHALL BE OF THE QUALITY TO PASS INSPECTIONS BY <br />LOCAL AND STATE AUTHORITIES, LENDING INSTITUTIONS, THE ARCHITECT AND <br />ENGINEERS, INSPECTOR OF RECORD, AND OWNER. ANY ONE OR ALL OF THE <br />ABOVE MENTIONED INSPECTORS MAY INSPECT TRADE(S) AT ANY TIME, AND ANY <br />CORRECTIONS NEEDED TO MEET THE REQUIRED QUALITY OF CONSTRUCTION <br />SHALL BE DONE IMMEDIATELY AFTER NOTIFYING THE ARCHITECT AND THE <br />OWNER FOR APPROVAL. <br />14. THE CONTRACTOR/SUB-CONTRACTORS SHALL INSPECT THE SITE PRIOR TO <br />START OF CONSTRUCTION AND NOTIFY OWNER AND THE ARCHITECT OF ANY <br />EXISTING CONDITIONS THAT MAY AFFECT THE WORK INCLUDING ELEMENTS <br />THAT MAY BE SUBJECT TO DAMAGE DURING DEMOLITION AND RENOVATION. THE <br />CONTRACTOR SHALL FIELD VERIFY EXISTING DIMENSIONS, PRIOR TO START OF <br />CONSTRUCTION AND NOTIFY OWNER AND ARCHITECT OF ANY DISCREPANCIES <br />BETWEEN THE EXISTING DIMENSIONS AND THE DRAWING DIMENSIONS THAT MAY <br />AFFECT THE WORK. THE CONTRACTOR SHALL OBTAIN DIRECTION FROM OWNER <br />ON RESOLUTION OF THE DISCREPANCIES BETWEEN THE EXISTING CONDITIONS <br />AND DIMENSIONS AND DRAWINGS PRIOR TO STARTING ANY WORK THAT MAY BE <br />AFFECTED BY SUCH DISCREPANCIES. <br />15. CLEANUP: TYPICALLY EACH SUBCONTRACTOR IS HELD RESPONSIBLE FOR <br />CLEANUP OF THE WORK OF HIS TRADE BY THE GENERAL CONTRACTOR. <br />HOWEVER, THE GENERAL CONTRACTOR SHALL BE HELD SOLELY RESPONSIBLE <br />FOR CONTINUOUS CLEANUP AS THE JOB PROGRESSES, AND FINAL CLEANUP <br />UPON SUBSTANTIAL COMPLETION. THE CONTRACTOR SHALL BE RESPONSIBLE <br />FOR CLEANING UP AND REMOVING FROM THE JOB SITE ALL TRASH AND DEBRIS, <br />IMMEDIATELY UPON COMPLETION OF HIS DAILY WORK. CONTINUOUS CLEANUP <br />SHALL KEEP THE JOB FREE AT ALL TIMES FROM UNREASONABLE BUILDUP OF <br />DEBRIS, WRAPPERS, CONTAINERS, WASTE MATERIALS, ETC., WHICH MAY CAUSE <br />ACCIDENTS, UNDUE HARDSHIP ON THE TRADESMAN, AND WORK PROGRESS. <br />FINAL CLEANUP INCLUDES CLEANING OF ALL SURFACES TO A "LIKE NEW" <br />CONDITION AND PREPARING THE BUILDING FOR ITS INTENDED USE. <br />16. THE CONTRACTOR SHALL AT ALL TIMES MAINTAIN THE SITE AND ADJACENT <br />AREAS IN A CLEAN, NEAT, AND ORDERLY MANNER. THE CONTRACTOR SHALL BE <br />RESPONSIBLE ONLY FOR DEBRIS THAT IS A RESULT OF THE WORK, INCLUDING <br />ANY THAT MAY RESULT FROM THE WORKERS. THE CONTRACTOR SHALL BE <br />RESPONSIBLE FOR PROVIDING HIS OWN REFUSE CONTAINERS AND SHALL AT NO <br />TIME USE THE BUILDING REFUSE CONTAINERS. <br />17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SECURITY OF <br />THE SITE WHILE THE JOB IS IN PROGRESS AND UNTIL THE JOB IS COMPLETED. <br />18. CONTRACTOR SHALL PROVIDE A PORTABLE FIRE EXTINGUISHER WITH A RATING <br />OF NOT LESS THAN 2-A OR 2-10BC WITHIN 75 FEET OF TRAVEL DISTANCE TO ALL <br />PORTIONS OF THE BUILD OUT AREA DURING CONSTRUCTION. <br />19. OBTAIN ALL CAL / OSHA CONSTRUCTION ACTIVITY PERMITS, PRIOR TO OBTAINING <br />THE BUILDING PERMIT, AS REQUIRED BY AND IN ACCORDANCE WITH CCR TITLE 8, <br />SECTION 341. <br />20. DEMARCATE AND NOTIFY THE REGIONAL NOTIFICATION CENTER (DIG ALERT, 811) <br />AT LEAST TWO WORKING DAYS PRIOR TO ANY EXCAVATIONS. <br />21. HOLD ON-SITE MANDATORY CONSTRUCTION AND SAFETY MEETINGS WEEKLY. <br />1. THE SCOPE OF THIS PROJECT IS AS GENERALLY DEPICTED IN THESE <br />INSTRUMENTS OF SERVICE AS PART OF THE CONTRACT DOCUMENTS. WORK <br />INCLUDING: POINTS OF CONNECTION, NOT SPECIFICALLY DEPICTED, THAT <br />NEED TO BE MADE ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. <br />ALL WORK PERFORMED EVEN IN REMOTE AREAS OF THE BUILDING OR SITE, <br />PERTAINING TO THIS PROJECT SHALL COMPLY WITH THE INTENT OF <br />CONTRACT DOCUMENTS. <br />2. THESE CONTRACT DOCUMENTS COVER THE FURNISHING AND INSTALLATION <br />OF MATERIALS AND WORK AS CALLED FOR ON THE DRAWINGS OR IN THE <br />SPECIFICATIONS (OR IN BOTH) WHICH ARE BOUND SEPARATELY AND ARE A <br />PART OF THE CONTRACT. IT SHALL BE THE RESPONSIBILITY OF EACH <br />CONTRACTOR TO CHECK WITH THE ARCHITECTURAL DRAWINGS BEFORE <br />FINALIZING THEIR BID AND BEFORE THE INSTALLATION OF THEIR WORK. ANY <br />DISCREPANCY BETWEEN THE ARCHITECTURAL AND THE CONSULTING <br />ENGINEER(S) DRAWINGS SHALL BE BROUGHT TO THE ARCHITECTS ATTENTION <br />BY WRITTEN REQUEST FOR CLARIFICATION. ANY WORK INSTALLED IN <br />CONFLICT WITH THE ARCHITECTURAL DRAWINGS SHALL BE CORRECTED BY <br />THE CONTRACTOR AT HIS OWN EXPENSE AND AT NO EXPENSE TO THE <br />OWNER OR ARCHITECT. <br />3. GENERAL REQUIREMENTS, DESCRIBING THE PROJECT'S ADMINISTRATIVE <br />REQUIREMENTS AND THE PHYSICAL ASPECTS OF CONSTRUCTION, ARE <br />PROVIDED WITHIN EACH PROFESSIONAL DISCIPLINE'S PROJECT <br />SPECIFICATION AND GENERAL NOTATION. GENERAL REQUIREMENTS ARE NOT <br />LIMITED TO THE INSTRUMENT OF SERVICES AND MAY EXTEND TO THE <br />CONTRACT DOCUMENTS AND OWNER REQUIREMENTS. <br />4. THE PROJECT SPECIFICATIONS CONSISTING OF THE WRITTEN REQUIREMENTS <br />FOR MATERIAL, EQUIPMENT, SYSTEMS, STANDARDS AND WORKMANSHIP FOR <br />THE WORK, AND PERFORMANCE OF RELATED SERVICES ARE CONTAINED <br />WITHIN EACH OF THE ARCHITECT AND THE ARCHITECT'S INSTRUMENT OF <br />SERVICES. REFER TO GENERAL NOTES FOR ADDITIONAL PROJECT <br />STANDARDS INFORMATION. DOCUMENTS INDICATED AS 'REFERENCE <br />DOCUMENT' ARE NOT CONSIDERED INSTRUMENTS OF SERVICES AND ARE <br />BEING ISSUED TO PROVIDE ASSISTANCE DURING THE REGULATORY AGENCY <br />CONTRACT DOCUMENT REVIEW. <br />5. OVERALL AND BUILDING SCOPE DIAGRAMS PROVIDE GUIDLINE TO IDENTIFY <br />THE LIMIT OF SCOPE. <br />6. THESE DRAWINGS ARE BASED ON FIELD OBSERVATION AND DOCUMENTS <br />FURNISHED BY THE OWNER. THE ARCHITECT SHALL BE NOTIFIED <br />IMMEDIATELY BY THE CONTRACTOR OF ANY DISCREPANCIES OR OTHER <br />QUESTIONS PERTAINING TO THE CONTRACT DOCUMENTS.. IF OBVIOUS <br />OMISSIONS OR CONTRADICTORY SITUATIONS IN THE CONTRACT DOCUMENTS <br />ARE DISCOVERED TO EXIST, THEY SHOULD BE IMMEDIATELY CALLED TO THE <br />ATTENTION OF ARCHITECT FOR CLARIFICATION. <br />7. ALL DIMENSIONS TAKE PRECEDENCE OVER SCALE UNLESS OTHERWISE <br />NOTED BY A PLUS/MINUS DIMENSION. DETAILED DRAWINGS HAVE <br />PRECEDENCE OVER SMALL SCALE DRAWINGS. CONTRACTOR SHALL CHECK <br />ACCURACY OF DIMENSIONS ON PLANS WITH ACTUAL FIELD DIMENSIONS. THE <br />CONTRACTOR SHALL REPORT TO THE ARCHITECT ALL CONDITIONS WHICH <br />PREVENT THE PROPER EXECUTION OF ITS WORK. CONTRACTOR SHALL NOT <br />START ANY CONSTRUCTION OR ANY OFF-SITE FABRICATION OF MATERIALS <br />UNTIL THE DRAWINGS DIMENSIONS ARE VERIFIED WITH ACTUAL FIELD <br />CONDITIONS. DO NOT SCALE DRAWINGS. <br />8. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR THE RESULTS OF ANY <br />ERRORS, DISCREPANCIES OR OMISSIONS THAT THE CONTRACTOR FAILED TO <br />NOTIFY THE ARCHITECT OF BEFORE CONSTRUCTION AND/OR FABRICATION OF <br />THE WORK. <br />9. WORK INCLUDES DEMOLITION, REMOVAL AND REINSTALLATION WHERE <br />REQUIRED. REMOVE, REVISE, RELOCATE AND REINSTALL AS REQUIRED. <br />10. IT IS NOT THE RESPONSIBILITY OF THE ARCHITECT OR GENERAL CONTRACTOR <br />TO ENSURE THAT AREAS OF THE BUILDING, NOT DESCRIBED WITHIN THE <br />SCOPE OF THIS PROJECT COMPLY WITH CURRENT CALIFORNIA BUILDING <br />CODES, LOCAL CODES AND ORDINANCES (ORD. NO. 2024-05) . IT IS THE <br />RESPONSIBILITY OF THE OWNER TO MAINTAIN THE BUILDING, SO AS TO <br />PROVIDE FOR THE SAFETY AND COMFORT OF THE OCCUPANTS. THIS <br />INCLUDES ALL LIFE SAFETY FEATURES SUCH AS FIRE ALARM, FIRE- <br />SPRINKLERS, NURSE CALL, EXIT ENCLOSURE, HANDICAP ACCESSIBILITY, ETC.. <br />THIS ALSO INCLUDES MAINTAINING THE BUILDING FREE OF HAZARDOUS <br />MATERIALS I.E., CHEMICALS AS DESCRIBED BY STATE OR FEDERAL AGENCIES <br />AS "HAZARDOUS", INCLUDING ASBESTOS. <br />1. THE CONTRACTOR SHALL INSTALL A VISUAL BARRIER (E.G., GREEN MESH FABRIC) <br />ALONG THE PERIMETER OF CONSTRUCTION SITES FOR VERTICAL CONSTRUCTION <br />PROJECTS. THIS REQUIREMENT SHALL BE SUBMITTED TO ARCHITECT AS A <br />CONTRACTOR SUBMITTAL AND VERIFIED BY THE COMMUNITY DEVELOPMENT <br />DEPARTMENT PRIOR TO SITE WORK. <br />2. DUST CONTROL. THE CONTRACTOR SHALL BE REQUIRED TO COMPLY WITH <br />SCAQMD RULES 402 AND 403, WHICH SHALL ASSIST IN REDUCING SHORT-TERM AIR <br />POLLUTANT EMISSIONS. SCAQMD RULE 402 REQUIRES THAT AIR POLLUTANT <br />EMISSIONS NOT BE A NUISANCE OFF SITE. SCAQMD RULE 403 (TABLES 1, 2, AND 3 <br />OF RULE 403) REQUIRES THAT FUGITIVE DUST BE CONTROLLED WITH THE BEST <br />AVAILABLE CONTROL MEASURES SO THAT THE PRESENCE OF SUCH DUST DOES <br />NOT REMAIN VISIBLE IN THE ATMOSPHERE BEYOND THE PROPERTY LINE OF THE <br />EMISSION SOURCE. THIS REQUIREMENT SHALL BESUBMITTED TO ARCHITECT AS A <br />CONTRACTOR SUBMITTAL AND VERIFIED BY THE COMMUNITY DEVELOPMENT <br />DEPARTMENT PRIOR TO SITE WORK. <br />3. ARCHITECTURAL COATINGS. ARCHITECTURAL COATINGS SHALL BE SELECTED SO <br />THAT THE VOC CONTENT OF THE COATINGS IS COMPLIANT WITH SCAQMD RULE <br />1113. THIS REQUIREMENT SHALL BE SUBMITTED TO THE ARCHITECT AS A <br />CONTRACTOR SUBMITTAL AND VERIFIED BY THE COMMUNITY DEVELOPMENT <br />DEPARTMENT PRIOR TO COATING WORK. <br />4. CONTRACTOR TO REDUCE PROJECT CONSTRUCTION AIR QUALITY IMPACTS <br />DURING CONSTRUCTION. THE FOLLOWING TO BE IMPLEMENTED BY CONTRACTOR <br />DURING CONSTRUCTION: <br />CONSTRUCTION ACTIVITIES INCLUDING ADDITIONS, ALTERATIONS, AND DEMOLITIONS <br />SHALL PROVIDE PEDESTRIAN PROTECTION PURSUANT TO SECTION 3306 OF THE <br />CALIFORNIA BUILDING CODE. TO DETERMINE THE TYPE OF PROTECTION REQUIRED <br />FOR PEDESTRIANS,MEASURE THE ULTIMATE HEIGHT OF CONSTRUCTION WITH <br />CONSIDERATION FOR BUILDING SETBACKS AND PROJECTIONS FROM THE BUILDING. <br />FOR SLOPING SITES, MEASURE THE HEIGHT OF THE BUILDING FROM CONSTRUCTION <br />EDGE OF THE WALKWAY AND THE SETBACK DISTANCE BETWEEN THE WALKWAY AND <br />THE BUILDING LINE. <br />BELOW ARE REQUIREMENTS TO BE ADDRESSED IN THE DESIGN OF PEDESTRIAN <br />PROTECTIONS: <br />1. WALKWAYS SHALL PROVIDE SUFFICIENT WIDTH WITH THE MINIMUM OF 4 FT. <br />CLEAR. <br />2. DIRECTIONAL BARRICADES SHELL BE PROVIDED AS NEEDED WHERE THE <br />WALKWAY EXTENDS INTO THE STREET. <br />3. CONSTRUCTION RAILINGS SHALL BE AT LEAST 42 INCHES IN HEIGHT. <br />4. BARRIERS SHALL BE A MINIMUM OF 8 FT. IN HEIGHT AND BE DESIGNED TO RESIST <br />LOADS REQUIRED. <br />5. SUCH PROTECTION SHALL BE MAINTAINED IN PLACE AND KEPT IN GOOD ORDER. <br />UNTIL WORK IS COMPLETED. <br />6. WHENEVER A WALKWAY MUST EXTEND INTO THE ROADWAY, A RAILING IS <br />REQUIRED ON THE STREET SIDE. <br />7. CONSTRUCTION STAFF TO ENTER PREMISES THROUGH REAR ENTRANCE. <br />A. THE CONTRACTORS SHALL PROVIDE AND COORDINATE THE EXACT <br />DIMENSIONS SIZES AND POSITIONS OF ALL SYSTEMS, EQUIPMENT, <br />MOUNTING, AND ATTACHMENTS RELATING TO THE WORK. <br />B. THE CONTRACTOR SHALL PROVIDE AND COORDINATE ALL DIMENSIONS <br />SIZES AND POSITIONS OF OPENINGS IN SLABS AND WALLS NECESSARY TO <br />THE INSTALLATION OF THE WORK. <br />C. ALL EQUIPMENT, CONTROLS AND TERMINATIONS SHALL BE POSITIONS FOR <br />SAFE, DIRECT AND EASY ACCESS. <br />D. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK WITH <br />THE APPROVED DRAWINGS BEFORE PROCEEDING WITH INSTALLATION OF <br />CIVIL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL WORK. <br />SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE ARCHITECT'S AND <br />THE ENGINEER'S DRAWINGS AND SPECIFICATIONS THAT WOULD CAUSE A <br />CONFLICT. IT SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION FOR <br />CLARIFICATION PRIOR TO INSTALLATION OF SAID WORK. ANY WORK <br />INSTALLED IN CONFLICT WITH THE ARCHITECTURAL DRAWINGS SHALL BE <br />CORRECTED BY THE CONTRACTOR AT HIS EXPENSE AND AT NO ADDITIONAL <br />EXPENSE TO THE OWNER OR ARCHITECT. <br />E. CONTRACTOR SHALL COORDINATE WORK WITH HVAC, MECHANICAL, <br />ELECTRICAL, PLUMBING, DESIGN BUILD FIRE PROTECTION AND <br />STRUCTURAL DRAWINGS AND REPORT TO IDS GROUP ANY DISCREPANCIES <br />FOR CORRECTION AND ADJUSTMENT PRIOR TO START OF WORK. NO <br />ALLOWANCE WILL BE MADE FOR INCREASED COST DUE TO THE <br />CONTRACTOR’S LACK OF COORDINATION. <br />A. WATER ACTIVE SITES AT LEAST TWICE DAILY. <br />B. APPLY WATER THREE TIMES DAILY, OR NON-TOXIC SOIL STABILIZERS <br />ACCORDING TO MANUFACTURERS' SPECIFICATIONS, TO ALL UNPAVED <br />PARKING OR STAGING AREAS OR UNPAVED ROAD SURFACES. <br />C. ALL TRUCKS HAULING DIRT, SAND, SOIL, OR OTHER LOOSE MATERIALS ARE <br />TO BE COVERED. <br />D. PAVE ROAD AND ROAD SHOULDERS. <br />E. INSTALL WHEEL WASHERS WHERE VEHICLES ENTER AND EXIT THE <br />CONSTRUCTION SITE ONTO PAVED ROADS OR WASH OFF TRUCKS AND ANY <br />EQUIPMENT LEAVING THE SITE EACH TRIP. <br />F. APPLY NON-TOXIC SOIL STABILIZERS ACCORDING TO MANUFACTURERS' <br />SPECIFICATIONS TO ALL INACTIVE CONSTRUCTION AREAS (PREVIOUSLY <br />GRADED AREAS INACTIVE FOR TEN DAYS OR MORE). <br />G. SUSPEND ALL EXCAVATING AND GRADING OPERATIONS WHEN WIND <br />SPEEDS(AS INSTANTANEOUS GUSTS) EXCEED 25 MILES PER HOUR. <br />H. SWEEP STREETS AT THE END OF THE DAY IF VISIBLE SOIL IS CARRIED ONTO <br />ADJACENT PUBLIC PAVED ROADS. <br />I. APPOINT A CONSTRUCTION RELATIONS OFFICER TO ACT AS A COMMUNITY <br />LIAISON CONCERNING ON-SITE CONSTRUCTION ACTIVITY, INCLUDING <br />RESOLUTION OF ISSUES RELATED TO PM10 GENERATION. <br />J. REQUIRE ALL VEHICLES AND EQUIPMENT TO BE PROPERLY TUNED AND <br />MAINTAINED ACCORDING TO MANUFACTURERS' SPECIFICATIONS. <br />A. WINDOWS: ALL WINDOWS AND SLIDING GLASS DOORS SHALL BE WELL <br />FITTED, WELL WEATHER-STRIPPED ASSEMBLIES AND SHALL HAVE A MIN. <br />UPGRADED SOUND TRANSMISSION CLASS (STC) RATING OF 30 FOR ALL <br />RESIDENTIAL UNITS WITHIN THE PROJECT BUILDING. <br />B. DOORS: ALL EXTERIOR DOORS SHALL BE WELL WEATHER-STRIPPED SOLID <br />CORE ASSEMBLIES AT LEAST ONE AND THREE-FOURTH-INCH THICK. <br />C. WALLS: AT ANY PENETRATIONS OF EXTERIOR WALLS BY PIPES, DUCTS, OR <br />CONDUITS, THE SPACE BETWEEN THE WALL AND PIPES, DUCTS, OR <br />CONDUITS SHALL BE CAULKED OR FILLED WITH MORTAR TO FOR AN AIRTIGHT <br />SEAL. <br />D. ROOF: ROOF SHEATHING OF WOOD CONSTRUCTION SHALL BE WELL FITTED <br />OR CAULKED PLYWOOD OF AT LEAST 1/2" THICK. CEILING SHALL BE WELL <br />FITTED, FULLY SEALED GYPSUM BOARD OF AT LEAST 1/2" THICK. INSULATION <br />WITH AT LEAST A RATING OF R-19 SHALL BE USED IN THE ATTIC SPACE. <br />E. VENTILATION: ARRANGEMENTS FOR ANY HABITABLE ROOM SHALL BE SUCH <br />THAT ANY EXTERIOR DOOR OR WINDOW CAN BE KEPT CLOSED WHEN THE <br />ROOM IS IN USE AND STILL RECEIVE CIRCULATED AIR. A FORCED AIR <br />CIRCULATION SYSTEM (E.G. AIR CONDITIONING) OR ACTIVE VENTILATION <br />SYSTEM (E.G. FRESH AIR SUPPLY) SHALL BE PROVIDED WHICH SATISFIES THE <br />REQUIREMENTS OF THE UNIFORM BUILDING CODE. <br />8. CONTRACTOR TO SUBMIT EVIDENCE TO THE ARCHITECT AND OWNER THAT THE <br />FOLLOWING NOISE REDUCTION MEASURES AS STATED ON THE CONSTRUCTION <br />PLANS AND SPECIFICATIONS ARE BEING IMPLEMENTED: <br />A. CONSTRUCTION TRAFFIC SHALL BE LIMITED TO HAUL ROUTES ESTABLISHED <br />BY THE LOCAL CITY ORDINANCE. <br />B. STATIONARY EQUIPMENT (SUCH AS GENERATORS AND AIR COMPRESSORS) <br />SHALL BE LOCATED AS FAR FROM RESIDENCES, INCLUDING HOTEL ROOMS, <br />AS FEASIBLE. <br />C. EQUIPMENT MAINTENANCE AND STAGING AREAS SHALL BE LOCATED AS FAR <br />AWAY FROM RESIDENCES AS FEASIBLE. <br />D. CONSTRUCTION EQUIPMENT SHALL BE FITTED WITH MANUFACTURER'S <br />STANDARD, OR BETTER, NOISE-SHIELDING AND MUFFLING DEVICES TO <br />REDUCE NOISE LEVELS TO THE MAXIMUM EXTENT FEASIBLE. <br />E. THE PROJECT OWNER/DEVELOPER SHALL DESIGNATE A CONSTRUCTION <br />COMPLAINT MANAGER FOR THE PROJECT. A TELEPHONE CONTACT NUMBER <br />SHALL BE CLEARLY POSTED AT ALL ACTIVE ACCESS POINTS. <br />5. NOISE GENERATING: CONSTRUCTION, REPAIR, REMODELING, OR GRADING IS <br />ALLOWED, PROVIDED IT DOES NOT OCCUR BETWEEN 8:00 P.M. AND 7:00 A.M. ON <br />WEEKDAYS (INCLUDING SATURDAY) OR AT ANY TIME ON A SUNDAY OR FEDERAL <br />HOLIDAY <br />6. CONTRACTOR TO INSTALL WINDOW ASSEMBLIES THAT ARE TESTED AND <br />CERTIFIED TO PREVENT THE INTRUSION OF EXTERIOR NOISE SO THAT THE <br />INTERIOR NOISE LEVEL WITH WINDOWS CLOSED, ATTRIBUTABLE TO EXTERIOR <br />SOURCES, SHALL NOT EXCEED 45 DBA CNEL IN ANY HABITABLE ROOM. THIS <br />REQUIREMENT SHALL BE SUBMITTED TO ARCHITECT AS A CONTRACTOR <br />SUBMITTAL. <br />7. PER CITY ORDINANCE, CONTRACTOR TO SATISFY CITY GUIDELINES OF 45 DBA <br />CNEL INTERIOR NOISE LEVEL STANDARD, ALL UNITS WILL REQUIRED A MIN. <br />EXTERIOR TO INTERIOR NOISE REDUCTION (NR) OF UP TO 23.8 DBA AND A <br />WINDOWS CLOSED CONDITION REQUIRING A MEANS OF MECHANICAL <br />VENTILATION (E.G. AIR CONDITIONING). IN ORDER TO MEET THE CITY GUIDELINES <br />OF 45 DBA CNEL INTERIOR NOISE STANDARDS THE PROJECT SHALL PROVIDE THE <br />FOLLOWING NOISE MITIGATION MEASURES:1. EXIT DOORS SHALL BE OF THE PIVOTED OR IDE-HINGEDSWINGING TYPE. EXIT <br />DOORS SHALL SWING IN THE DIRECTION OF EXIT TRAVEL W HEN THE AREA SERVED <br />HAS AN OCCUPANT LOAD OF 50 OR MORE. <br />2. EVERY EXIT DOOR SHALL BE OPENABLE FROM THE INSIDE WITHOUT THE USE OF A <br />KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT. NOTE ALSO THAT FLUSH BOLTS <br />OR SURFACE BOLTS ARE PROHIBITED. <br />3. PANIC HARDWARE SHALL BE PROVIDED ON EXIT DOORS OF ROOMS, CORRIDORS, <br />STAIRWAYS, HANDLING AN OCCUPANT CAPACITY OF 50 OR MORE PERSONS. <br />4. EXIT SIGNS SHALL BE INSTALLED AT REQUIRED EXIT DOORWAYS AND WHERE <br />OTHERWISE NECESSARY TO CLEARLY INDICATE THE DIRECTION OF EGRESS IN <br />COMPLIANCE WITH THE CODE OF JURISDICTION. <br />5. THE FORCE FOR PUSHING OR PULLING OPEN INTERIOR SWINGING EGRESS DOORS, <br />OTHER THAN FIRE DOORS, SHALL NOT EXCEED 5 POUNDS. THESE FORCES DO NOT <br />APPLY TO THE FORCE REQUIRED TO RETRACT LATCH BOLTS OR DISENGAGE <br />OTHER DEVICES THAT HOLD THE DOOR IN A CLOSED POSITION. FOR OTHER <br />SWINGING DOORS, AS WELL AS SLIDING AND FOLDING DOORS, THE DOOR LATCH <br />SHALL RELEASE WHEN SUBJECTED TO A 15-POUND FORCE. THE DOOR SHALL BE <br />SET IN MOTION WHEN SUBJECTED TO A 30-POUND FORCE. THE DOOR SHALL <br />SWING TO A FULL-OPEN POSITION WHEN SUBJECTED TO A 15-POUND FORCE. <br />FORCES SHALL BE APPLIED TO THE LATCH SIDE OF THE DOOR. <br />6. EACH DOOR IN A MEANS OF EGRESS FROM A GROUP 'A' OCCUPANCY SHALL NOT <br />BE PROVIDED WITH A LATCH OR LOCK UNLESS IT IS PANIC HARDWARE OR FIRE <br />EXIT HARDWARE (CBC 1008.1.9). <br />7. DOOR HANDLES, LOCK AND OTHER OPERATING DEVICES SHALL BE INSTALLED AT A <br />MIN. 34" AND A MAX. 44" A.F.F. <br />8. EXIT SIGNS SHALL BE CONNECTED TO AN EMERGENCY POWER SYSTEM THAT WILL <br />PROVIDE AN ILLUMINATION OF NOT LESS THAT 90min. IN CASE OF PRIMARY POWER <br />LOSS (CBC 1011.2 - 1011.5.3) <br />9. THE MEANS OF EGRESS, INCLUDING THE EXIT DISCHARGE, SHALL BE ILLUMINATED <br />AT ALL TIMES THE BUILDING SPACE SERVED BY THE MEANS OF EGRESS IS <br />OCCUPIED. <br />1. FURNISH AND INSTALL SUPPORTS AND OTHER NECESSARY FINISH MATERIALS FOR <br />A COMPLETE SIGNAGE INSTALLATION. <br />2. HANDICAPPED SIGNAGE / IDENTIFICATION <br />A. THE INTERNATIONAL SYMBOL OF ACCESSIBILITY SHALL BE THE STANDARD <br />USED TO IDENTIFY FACILITIES THAT ARE ACCESSIBLE TO AND USEABLE BY <br />PHYSICALLY HANDICAPPED PERSONS. <br />B. LETTERS AND NUMBERS ON SIGNS HAVE A WIDTH TO HEIGHT RATIO OF <br />BETWEEN 3:5 AND 1:1 AND STROKE WIDTH TO HEIGHT RATIO OF BETWEEN 1:5 <br />AND 1:10. <br />C. CHARACTERS AND SYMBOLS SHALL CONTRAST WITH THEIR BACKGROUND, <br />EITHER LIGHT CHARACTERS ON A DARK BACKGROUND OR DARK CHARACTERS <br />ON A LIGHT BACKGROUND. <br />D. ALL BUILDING ENTRANCES THAT ARE ACCESSIBLE TO AND USABLE BY <br />PHYSICALLY HANDICAPPED PERSONS SHALL BE IDENTIFIED WITH AT LEAST <br />ONE STANDARD SIGN AND WITH ADDITIONAL DIRECTIONAL SIGNS AS REQUIRED <br />TO BE VISIBLE TO PERSONS ALONG APPROACHING PEDESTRIAN WAYS. <br />E. ALL SANITARY FACILITIES WILL BE PROVIDED WITH APPROPRIATE <br />IDENTIFICATION SYMBOLS. <br />1. ALL GLAZING SHALL COMPLY WITH C.P.S.C. 16 C.F.R. AND CBC. <br />2. GLASS DOORS, ADJACENT PANELS AND ALL GLAZED OPENINGS SHALL BE <br />APPROVED FOR IMPACT HAZARD PER C.B.C. SECTION 2406. PROVIDE <br />IDENTIFICATION OF GLAZING PER SECTION 2406.2 <br />3. PROVIDE TEMPERED GLASS AS REQUIRED BY CBC SECTION 2406 AND BY OTHER <br />APPLICABLE CODES. <br />1. MECHANICAL DUCTS, ETC. PENETRATING FIRE-RATED CEILINGS AND FIRE WALLS <br />SHALL BE CORRESPONDINGLY RATED OR DAMPERED. CABINETS, ELECTRICAL <br />PANELS, LIGHTS, ETC. RECESSED INTO FIRE RATED WALLS OR CEILINGS SHALL BE <br />BACKED WITH CORRESPONDING FIRE-RESISTIVE CONSTRUCTION AS REQUIRED TO <br />MAINTAIN THE INTEGRITY OF THE FIRE PROTECTION. <br />2. FIRE RESISTIVE ASSEMBLIES FOR PROTECTION OF OPENINGS SHALL COMPLY WITH <br />CBC CHAPTER 7. <br />3. PENETRATION OF FIRE RATED ASSEMBLIES WHICH REQUIRE OPENING <br />PROTECTION SHALL BE FIRE STOPPED. FIRE STOPPING SHALL BE IDENTICAL TO AN <br />APPROVED UNDERWRITERS LABORATORIES (UL) LISTED ASSEMBLY WITH AN "F" OF <br />"T" RATING. PENETRATIONS MUST ALSO CONSIST OF APPROVED MATERIALS FOR <br />THROUGH WALL PENETRATIONS FIRE STOP SYSTMEMS AS PRESCRIBED IN CBC <br />STANDARD 7-5 FIRE RATING FOR FIRE STOP SYSTEMS SHALL BE EQUAL TO THE <br />ASSEMBLY PENETRATED. (709.6, CBC) <br />4. SHAFT ENCLOSURES: OPENINGS EXTENDING VERTICALLY THROUGH FLOORS <br />SHALL BE ENCLOSED IN A SHAFT OF 1-HOUR FIRE-RESISTIVE CONSTRUCTION IF <br />PENETRATING A 1-HOUR FIRE RATED FLOOR ASSEMBLY. SHAFTS SHALL INCLUDE <br />A GYPSUM BOARD HORIZONTAL TERMINATION AT BOTTOM, ENGINEERED BY <br />GENERAL CONTRACTOR. PROTECTION FOR STAIRWAYS SHALL BE AS SPECIFIED IN <br />CODE OF JURISDICTION. <br />3. AREA AND OCCUPANCY SIGNAGE REQUIREMENTS OCCUPANT LOAD SIGN SHALL BE <br />POSTED IN EACH MEETING ROOM, ASSEMBLY ROOM OR SIMILAR PURPOSE ROOM <br />HAVING AN OCCUPANT LOAD OF 50 OR MORE. <br />4. EXIT SIGNS SHALL BE POSTED OVER EXITS DOORS SERVING 50 OR MORE AND ALL <br />HAZARDOUS AREAS. MINIMUM LETTER HEIGHT IS 6" AND SHALL CONFORM WITH CBC <br />AND LOCAL CODES. CBC SECTION 1003.2.8 AND UFC SECTION 12113A. SEE <br />ELECTRICAL PLANS FOR LOCATIONS AND FURTHER INFO. <br />5. AN APPROVED SIGN SHALL BE LOCATED AT EACH FLOOR LEVEL LANDING IN ALL <br />ENCLOSED STAIRWAYS. THE SIGN SHALL INDICATE FLOOR LEVEL, TERMINUS OF THE <br />TOP AND BOTTOM OF THE STAIRWAY, AND THE IDENTIFICATION OF THE STAIRWAY. <br />1. THE CONTRACTOR SHALL IN THE WORK OF ALL TRADES, PERFORM ALL CUTTING, <br />PATCHING, REPAIRING, RESTORING AND THE LIKE NECESSARY TO COMPLETE <br />THE WORK AND TO RESTORE ANY DAMAGED OR AFFECTED SURFACES <br />RESULTING FROM THE WORK OF THIS CONTRACT TO THEIR ORIGINAL CONDITION <br />TO THE SATISFACTION OF THE OWNERS AND THE ARCHITECT. <br />2. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, FITTING, PATCHING, <br />AND FIRE SAFING METHODS REQUIRED TO COMPLETE THE WORK INCLUDING BUT <br />NOT LIMITED TO THE FOLLOWING: <br />A. UNCOVERED PORTIONS OF THE WORK USED TO PROVIDE FOR <br />INSTALLATION OF UNSCHEDULED WORK. <br />B. REMOVE AND REPLACE DEFECTIVE WORK. <br />C. REMOVE AND REPLACE WORK NOT CONFORMING TO REQUIREMENTS OF <br />CONTRACT DOCUMENTS. <br />D. PROVIDE ROUTINE PENETRATIONS OF NON-STRUCTURAL SURFACES FOR <br />INSTALLATION OF PIPING AND ELECTRICAL CONDUIT. <br />E. REMOVE EXISTING WORK INDICATED IN THE DOCUMENTS AND AS MAY BE <br />REQUIRED TO PERMIT THE PROPER INSTALLATION OF NEW WORK THAT <br />FORMS PART OF HIS CONTRACT. ALL CUTTING,REPAIRING AND/OR PATCHING <br />NECESSARY IN CONNECTION WITH SUCH REMOVALS SHALL BE DONE <br />WITHOUT EXTRA CHARGE, WHETHER OR NOT EVERY ITEM MAY BE <br />SPECIFICALLY DESCRIBED. <br />3. PROCEDURES FOR NON-STRUCTURAL CUTTING AND PATCHING: <br />A. PROVIDE ADEQUATE TEMPORARY SUPPORT AS NECESSARY TO ASSURE THE <br />STRUCTURAL VALUE INTEGRITY OF THE AFFECTED PORTION OF THE WORK. <br />B. PROVIDE DEVICES AND METHODS TO PROTECT OTHER PORTIONS OF THE <br />PROJECT FROM DAMAGE. <br />C. PROVIDE PROTECTION FROM THE ELEMENTS FOR THAT PORTION OF THE <br />PROJECT WHICH MAY BE EXPOSED BY CUTTING AND PATCHING WORK. <br />D. EXECUTE CUTTING BY METHODS WHICH WILL PREVENT DAMAGE TO OTHER <br />WORK, AND WILL PROVIDE PROPER SURFACES TO RECEIVE INSTALLATION OR <br />REPAIRS. <br />E. EXECUTE FITTING AND ADJUSTMENT OF PRODUCTS TO PROVIDE A <br />FINISHED INSTALLATION TO COMPLY WITH SPECIFIED PRODUCTS, <br />FUNCTIONS, TOLERANCES AND FINISHES, AND MANUFACTURER'S CRITERIA. <br />F. RESTORE WORK WHICH HAS BEEN CUT OR REMOVED. INSTALL NEW <br />PRODUCTS TO PROVIDE COMPLETE WORK IN ACCORDANCE WITH <br />REQUIREMENTS OF CONTRACT DOCUMENTS. <br />G. REFINISH ENTIRE SURFACE AS NECESSARY TO PROVIDE AN EVEN FINISH <br />TO MATCH ADJACENT FINISHES. <br />CUTTING AND PATCHING <br />INSTRUMENT OF SERVICE CONTRACTOR OBLIGATIONS <br />EXITS <br />DOORS <br />1. DOORS IN RATED WALLS SHALL CONSIST OF SELF-CLOSING, SELF-LATCHING <br />ASSEMBLIES WITH SMOKE AND DRAFT SEALS AT HEAD AND JAMBS. DOOR <br />ASSEMBLY RATINGS SHALL BE AS INDICATED ON DOOR SCHEDULE. HOLD OPEN <br />DEVICES ON RATED ASSEMBLIES SHALL BE MAGNETICALLY OPERATED AND <br />ACTIVIATED BY SMOKE DETECTORS. <br />2. DOOR SIZES SHOWN ON DOOR SCHEDULE ARE OPENING SIZES. ALLOWANCE FOR <br />THRESHOLDS, ECT., SHALL BE TAKEN OFF THE DOOR. DOORS AND FRAMES <br />SHALL BE REINFORCED WHERE REQUIRED FOR CLOSERS, STOPS, AND <br />HARDWARE. <br />3. AIR LEAKAGE AT EXTERIOR DOORS SHALL BE LIMITED BY THE FOLLOWING: <br />A. ALL DOORS SHALL BE PROVIDED WITH A SEAL, ASTRAGAL, OR BAFFLE AT THE <br />HEAD AND SILL. <br />B. DOORS MOUNTED ON EITHER THE INSIDE OR OUTSIDE OF AN EXTERIOR WALL <br />SHALL HAVE A MINIMUM 1/2" LAP AT EACH JAMB. <br />C. DOORS REQUIRING VERTICAL TRACK OR GUIDES SHALL USE A CONTINUOUS <br />MOUNTING ANGLE, SEALED IN ACCORDANCE WITH "G" LISTED HERE. <br />D. DOORS MOUNTED BETWEEN THE JAMBS SHALL HAVE A CONTINUOUS SEAL OR <br />BAFFLE AT EACH JAMB. <br />E. MEETING RAILS OR SECTION DOORS AND MEETING STILES OR RAILS OR BI- <br />PARTING DOORS SHALL BE PROVIDED WITH A SEAL, ASTRAGAL, OR BAFFLE. <br />F. SWINGING AND REVOLVING DOORS SHALL BE WEATHERSTRIPPED AT THE <br />HEAD, SILL AND JAMBS. <br />G. OPEN EXTERIOR JOINTS AROUND WINDOW AND DOOR FRAMES, BETWEEN <br />WALL AND FOUNDATIONS, BETWEEN WALL AND ROOF, BETWEEN WALL <br />PANELS, AT PENETRATIONS OF UTILITY SERVICES THROUGH WALLS, FLOORS <br />AND ROOFS AND ALL OTHER OPENINGS IN THE EXTERIOR ENVELOPE SHALL <br />BE SEALED, CAULKED, GASKETED, OR WEATHERSTRIPPED TO LIMIT AIR <br />LEAKAGE. <br />WOOD WORK <br />1. OFFSET STUDS WHERE REQUIRED SO THAT FINISH WALL SURFACE WILL BE <br />FLUSH. IF STRUCTURAL PANELS ARE REQUIRED ON A WALL PLANE, THE ENTIRE <br />WALL PLANE SHALL BE FURRED OR FINISHED FLUSH. <br />2. INSTALL METAL CORNER BEADS AT ALL EXPOSED WALLBOARD EDGES. INSTALL <br />CASING BEADS WHEREVER WALLBOARD, PLASTER, ETC. ABUTS A DISSIMILAR <br />FINISH MATERIAL AND PROVIDE SEALANT AS REQUIRED. <br />3. GYPSUM BOARD SHALL EXTEND TO UNDERSIDE OF STRUCTURE ABOVE AT ALL <br />EXTERIOR PERIMETER WALLS <br />1. THE CONSTRUCTION OR DEMOLITION OF ANY BUILDING, STRUCTURE, SCAFFOLDING <br />OR FALSEWORK MORE THAN 3 STORIES OR 36'-0" IN HEIGHT, REQUIRES A PERMIT <br />FROM THE STATE OF CALIFORNIA DIVISION OF INDUSTRIAL SAFETY PRIOR TO THE <br />ISSUANCE OF A BUILDING PERMIT. ( 1PC.B.9 ) <br />2. A SEPARATE INTERIOR IMPROVEMENT PERMIT IS REQUIRED FOR ANY TENANT <br />IMPROVEMENT IN THIS BUILDING. <br />3. A PERMIT FROM THE DEPARTMENT OF PUBLIC WORKS IS REQUIRED FOR A <br />PROTECTION FENCE OR CANOPY ON OR OVER ANY STREET OR PUBLIC SPACE. <br />PROTECTION OF PEDESTRIANS DURING CONSTRUCTION SHALL BE PROVIDED PER <br />C.B.C. SECTION 3303. <br />4. ALL ROOMS ARE REQUIRED TO BE MARKED WITH APPROVED SIGNAGE. <br />5. OBTAIN PERMIT FROM CITY ENGINEER PRIOR TO DOING ANY SIDEWALK AND CURB <br />WORK. <br />6. SEPARATE PERMITS SHALL BE OBTAINED FOR SIGNS, FENCES, TRASH ENCLOSURES, <br />RETAINING WALLS, PLANTERS, AND POOLS. <br />7. THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THEIR DESIGN AND <br />SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING OFFICIAL. REFER TO <br />SHEET G-001 FOR LIST OF DEFERRED SUBMITTALS. <br />8. ALL LEVELS REFERENCE POINTS ABOVE PODIUM LEVEL ARE TAKEN FROM TOP OF <br />SHEATHING. DIMENSIONS ON ELEVATIONS, SECTIONS AND WALL SECTIONS ARE <br />REFERENCED TO THESE POINTS, UNLESS NOTED. <br />PERMIT <br />GENERALCONTRACTOR MITIGATION OBLIGATIONS <br />MONITORING AND REPORTING PROGRAM <br />CODES <br />1. CONSTRUCTION SHALL COMPLY WITH APPLICABLE EDITION OF CALIFORNIA BUILDING CODE, <br />ALL APPLICABLE LOCAL, STATE AND FEDERAL CODES, ORDINANCES, LAWS, REGULATIONS <br />AND PROTECTIVE COVENANTS GOVERNING THE WORK. IN CASE OF CONFLICTS, THE <br />MORE STRINGENT REQUIREMENT SHALL GOVERN. <br />SIGNAGES <br />FIELD APPLICATION OF PEDESTRIAN <br />PROTECTION: <br />GLAZING <br />RATED ASSEMBLY PENETRATIONS <br />DESIGNATED CONSTRUCTION MANAGER TO BE PHIL LEVESQUE (714) 483-3915. <br />CONSTRUCTION MANAGER TO BE INVITED TO ALL WEEKLY PROJECT MEETINGS <br />TO VERIFY QUALITY CONTROL MEASURES AND SCHEDULE. <br />LICENSED A RCHITECT <br />SAMUEL <br />PIPER <br />C-39936 <br />RENEWAL <br />DATE <br />STATEOF C A LIFORNIA12/31/27 <br />17595 HARVARD AVE, SUITE C <br />IRVINE, CA. 92614 <br />TEL: 707.815.6742 <br />PROJECT NO. <br />DRAWN BY <br />CHECKED BY <br />APPROVED BY <br />PROJECT IDENTIFICATION <br />THE ORIGINAL SIZE OF THIS SHEET IS 30" X 42" <br />THESE DRAWINGS AND SPECIFICATIONS ARE THE <br />PROPERTY AND COPYRIGHT OF SANDPIPER ARCHITECTURE <br />AND SHALL NOT BE USED ON ANY OTHER PROJECT OR <br />LOCATIONS EXCEPT AS DESCRIBED ON THE DRAWINGS, <br />WITHOUT WRITTEN AGREEMENT WITH THE ARCHITECT. <br />STAMP <br />STAMP <br />ARCHITECT ON RECORD <br />CLIENT <br />SHEET TITLE <br />SHEET NUMBER <br />APPROVAL <br />PL <br />O <br />T <br /> <br />D <br />A <br />T <br />E <br />: <br /> <br />U <br />S <br />E <br />R <br />: <br />128 W MACARTHUR BLVD, SANTA ANA, <br />CA 92707 <br />THE NOODLE LOFT <br />ISSUE <br />SP <br />SP <br />SANDPIPER <br />ARCHITECTURE <br />4/ <br />1 <br />6 <br />/ <br />2 <br />0 <br />2 <br />6 <br /> <br />2 <br />: <br />1 <br />8 <br />: <br />2 <br />3 <br /> <br />P <br />M <br />G-101 <br />GENERAL NOTES <br />2510 <br />Au <br />t <br />h <br />o <br />r <br />REV DESCRIPTION DATE <br />A UPLOAD 12/02/2026 <br />B HEALTH SUB 2 02/04/2026 <br />2 PLAN RESUBMITTAL 04/06/2026