My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2731 3%4 N Grand Ave WCC01 - Plan
PBA
>
Building
>
ProjectDox
>
G
>
Grand Ave
>
2731 N Grand Ave
>
2731 3%4 N Grand Ave WCC01 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2026 5:00:22 AM
Creation date
5/19/2026 5:00:05 AM
Metadata
Fields
Template:
Plan
Permit Number
101125937
101125938
Full Address
2731 N Grand Ave
2731 3/4 N Grand Ave Unit# WCC01
Street Number
2731
Partial
3/4
Street Direction
N
Street Name
Grand
Street Suffix
Ave
Unit Number
WCC01
Freehand
ID:
1
Creator:
Import Agent
Created:
5/19/2026 5:00 AM
Modified:
5/18/2026 10:40 AM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
tnxTower Report - version 8.3.0.5 <br />Date: June 18, 2025 <br />Telamon <br />319 Chapanoke Road, Suite 118 <br />Raleigh, NC 27603 <br />(405) 348-5460 <br />Subject: Structural Analysis Report <br />Carrier Designation: AT&T Mobility Co-Locate <br />Site Number: SICA001904 <br />Site Name: 22 FWY GLASSELL 3B2 <br />FA Number: 10087182 <br />Crown Castle Designation: BU Number: 845404 <br />Site Name: 22 FWY GLASSELL 3B2 <br />JDE Job Number: 2148616 <br />Work Order Number: 2399694 <br />Order Number: 705457 Rev. 0 <br />Engineering Firm Designation: Telamon Project Number: 42285-845404-2399694-01-STR <br />Site Data: 2731 North Grand, Santa Ana, Orange County, CA <br />Latitude 33° 46' 29.5'', Longitude -117° 51' 7.6'' <br />59 Foot - Monopole Tower <br />Telamon is pleased to submit this “Structural Analysis Report” to determine the structural integrity of the <br />above mentioned tower. <br />The purpose of the analysis is to determine acceptability of the tower stress level. Based on our analysis we <br />have determined the tower stress level for the structure and foundation, under the following load case, to be: <br />LC5: Proposed Equipment Configuration Sufficient Capacity <br />This analysis has been performed in accordance with the 2022 California Building Code based upon an ultimate <br />3-second gust wind speed of 95 mph. Applicable standard references and design criteria are listed in Section 2 - <br />Analysis Criteria. <br />Structural analysis prepared by: Rasika Hirve <br />Respectfully submitted by: <br />Brandon T. Compton, P.E., S.E. <br />Structural Engineer
The URL can be used to link to this page
Your browser does not support the video tag.